X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22305

Well Details

Well ID: 37-115-22305
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 154283
Farm/Lease Name: HAYNES, W. 1
License Status:
Spud Date:
Permit Date: 2017-06-14
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.745128
Longitude: -75.674550

For data sources see[1][2][3]

Well History

Date Event
2017-06-14 New Permit Application
2017-09-29 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-23 2018-07-09 7,118 13,771,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.7177 116,226,000.0
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.0169309 22433.6
organic phosphonic salts 15827-60-8 15 0.00267331 3542.14
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.1178 16,056,200.0
Biocide, MBC-516 Keane Biocide quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000471244 624.4
didecyldimethylammonium chloride 7173-51-5 8 0.000707309 937.187
Glutaral 111-30-8 26.7 0.00236953 3139.64
Water 7732-18-5 56.7 0.0050337 6669.67
ethonal 64-17-5 2.8 0.00024849 329.25
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.000107685 142.683
Citric acid 77-92-9 30 0.000646109 856.097
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.00193952 2569.88
Hydrochloric Acid 7647-01-0 15 0.00387905 5139.75
Friction Reducer, KFR-16FW Keane Friction Reducer Water 7732-18-5 60 0.0653612 86603.8
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00108935 1443.4
Ammonium chloride 12125-02-9 1.5 0.00163403 2165.1
oleic acid diethanolamide 93-83-4 1.5 0.00163403 2165.1
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0217871 28867.9
Other Chemical(s) Listed Above See Trade Name(s) List organic phosphonic salts 15827-60-8 15 0.00267331 3542.14
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0217871 28867.9
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000153094 202.85
ethonal 64-17-5 2.8 0.00024849 329.25
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007655 101.425
formic acid 64-18-6 10 0.00007655 101.425
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00108935 1443.4
Ammonium chloride 12125-02-9 1.5 0.00163403 2165.1
Cinnamaldehyde 104-55-2 10 0.00007655 101.425
Citric acid 77-92-9 30 0.000646109 856.097
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000471244 624.4
isoproyl alcohol 67-63-0 5 0.00003827 50.713
oleic acid diethanolamide 93-83-4 1.5 0.00163403 2165.1
Water 7732-18-5 7.5 0.00193952 2569.88
Ethoxylated alcohol 68131-39-5 10 0.00007655 101.425
didecyldimethylammonium chloride 7173-51-5 8 0.000707309 937.187
Glutaral 111-30-8 26.7 0.00236953 3139.64
Acid Inhibitor, KAI-12 Keane Acid Inhibitor isoproyl alcohol 67-63-0 5 0.00003827 50.713
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007655 101.425
Cinnamaldehyde 104-55-2 10 0.00007655 101.425
formic acid 64-18-6 10 0.00007655 101.425
Ethoxylated alcohol 68131-39-5 10 0.00007655 101.425
Ethylene glycol 107-21-1 40 0.000306188 405.701
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000153094 202.85

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 2,829,517.00 134 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 4,404,103.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 2.75 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 3.50 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 18.01 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 2.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.16 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Produced Fluid 19,806.34 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Produced Fluid 7,027.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 74.69 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Unused Fracturing Fluid Waste 1.09 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Drill Cuttings 1,205.08 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.29 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 0.91 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 3,371.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Produced Fluid 436.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2642970 Primary Facility 2017-10-03 Drilling/Alteration No Violations Noted At time of inspection.

I met with company man Ari Dabila. United Drilling was on site to drill and run conductor pipe in the 1H, 2H, 3H, 4H, 5H, 6H, 7H and 8H wells. The 1H, 2H, 3H, 4H, 5H and 7H wells were drilled to a depth of 104'. There was a rig on the 1H, 6H and 8H wells. The rig on the 6H was at a depth of 45' and will drill to 104'. The rig on the 8H was at a depth of 87' and will drill to 104'. The rig on the 1H was running conductor pipe. The conductor pipe will be set at 102' in all the wells and cemented to the surface. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2647596 Primary Facility 2017-09-27 Preoperation Inspection No Violations Noted Todays inspection was conduced as a preoperational inspection. He site has been built per plan with no red lined additions. No violations noted.
2713197 Primary Facility 2018-04-02 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Tony Ketterling. Nabors X36 was on site and drilling the lateral section of the well. The proposed TD for the well is 13,809'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2714301 Primary Facility 2018-03-28 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as part of an investigation into a nearby water supply complaint. As photos 3 and 4 show, a drilling rig was on-site actively drilling. No E&S issues were identified. No violations were noted.
2736266 Primary Facility 2018-05-31 Routine/Complete Inspection No Violations Noted At time of inspection.

Met with company men Ron Rupert and Wayne Wilridge. Keane was on site to frac the 1H,2H,3H,4H,5H,6H,7H and 8H wells. They were on stage 23 out of 65 on the 8H when I arrived on location. The 1H and 3H haven't been started yet, there will be 32 stages on the 1H and 45 stages on the 3H. There were 15 stages completed out of 46 on the 2H. There were 25 stages completed out of 57 on the 4H. There were 15 stages completed out of 34 on the 5H. There were 24 stages completed out of 54 on the 6H. There were 20 stages completed out of 44 on the 7H. The water was being trucked to the location. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2740118 Primary Facility 2018-06-06 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. As the photo's show, hydraulic fracturing operations are still occurring at this site. Operations on the pad appeared to be impressively streamlined. No E&S issues were identified. The well connect pipeline for this pad appears to be close to completion as far as pipe installation is concerned. No violations noted.
2807299 Primary Facility 2018-11-28 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently completed and put in production. The permit numbers on the entrance sign were correct. The well tag was on the well and correct. There was water 7.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 11/2/18. The production fluid was going into a 500bbl tank on containment and the containment appeared to be in good condition. There were four 500bbl tanks on containment and that containment appeared to be in good condition. The rest of the 500bbl tanks on site appeared to have been clean

2832725 Primary Facility 2019-01-28 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. All wells appear to be in production. Overall the site has good stabilization. No E&S issues identified. No violations noted.

For data sources see[8]

References