X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22298

Well Details

Well ID: 37-115-22298
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Jessup Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 154188
Farm/Lease Name: TSOUROUS, A.
License Status: Active
Spud Date: 2017-07-29
Permit Date: 2017-05-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.781822
Longitude: -75.934378

For data sources see[1][2][3]

Well History

Date Event
2017-05-31 New Permit Application
2017-07-28 Performed Spud Operation
2017-09-16 Drilling Completion
2017-12-15 Perforation
2017-12-15 Performed Stage 1 of Stimulation
2017-12-16 Perforation
2017-12-16 Performed Stage 2 of Stimulation
2017-12-16 Performed Stage 3 of Stimulation
2017-12-17 Perforation
2017-12-17 Performed Stage 4 of Stimulation
2017-12-17 Performed Stage 5 of Stimulation
2017-12-28 Perforation
2017-12-28 Performed Stage 6 of Stimulation
2018-02-19 Perforation
2018-02-19 Performed Stage 7 of Stimulation
2018-02-20 Perforation
2018-02-20 Performed Stage 8 of Stimulation
2018-02-20 Performed Stage 9 of Stimulation
2018-02-21 Perforation
2018-02-21 Performed Stage 10 of Stimulation
2018-02-21 Performed Stage 11 of Stimulation
2018-02-22 Perforation
2018-02-22 Performed Stage 12 of Stimulation
2018-02-22 Performed Stage 13 of Stimulation
2018-02-23 Perforation
2018-02-23 Performed Stage 14 of Stimulation
2018-02-23 Performed Stage 15 of Stimulation
2018-02-24 Perforation
2018-02-24 Performed Stage 16 of Stimulation
2018-02-24 Performed Stage 17 of Stimulation
2018-02-25 Perforation
2018-02-25 Performed Stage 18 of Stimulation
2018-02-25 Performed Stage 19 of Stimulation
2018-02-26 Perforation
2018-02-26 Performed Stage 20 of Stimulation
2018-02-26 Performed Stage 21 of Stimulation
2018-02-27 Perforation
2018-02-27 Performed Stage 22 of Stimulation
2018-02-28 Perforation
2018-02-28 Performed Stage 23 of Stimulation
2018-02-28 Performed Stage 24 of Stimulation
2018-03-01 Perforation
2018-03-01 Performed Stage 25 of Stimulation
2018-03-01 Performed Stage 26 of Stimulation
2018-03-01 Performed Stage 27 of Stimulation
2018-03-02 Perforation
2018-03-02 Performed Stage 28 of Stimulation
2018-03-03 Perforation
2018-03-03 Performed Stage 29 of Stimulation
2018-03-04 Perforation
2018-03-04 Performed Stage 30 of Stimulation
2018-03-05 Perforation
2018-03-05 Performed Stage 31 of Stimulation
2018-03-05 Performed Stage 32 of Stimulation
2018-03-05 Performed Stage 33 of Stimulation
2018-03-06 Perforation
2018-03-06 Performed Stage 34 of Stimulation
2018-03-06 Performed Stage 35 of Stimulation
2018-03-06 Performed Stage 36 of Stimulation
2018-03-07 Perforation
2018-03-07 Performed Stage 37 of Stimulation
2018-03-07 Performed Stage 38 of Stimulation
2018-03-08 Perforation
2018-03-08 Performed Stage 39 of Stimulation
2018-03-08 Performed Stage 40 of Stimulation
2018-03-08 Performed Stage 41 of Stimulation
2018-03-09 Perforation
2018-03-09 Performed Stage 42 of Stimulation
2018-03-09 Performed Stage 43 of Stimulation
2018-03-10 Perforation
2018-03-10 Performed Stage 44 of Stimulation
2018-03-10 Performed Stage 45 of Stimulation
2018-03-11 Perforation
2018-03-11 Performed Stage 46 of Stimulation
2018-03-12 Perforation
2018-03-12 Performed Stage 47 of Stimulation
2018-03-12 Performed Stage 48 of Stimulation
2018-03-13 Perforation
2018-03-13 Performed Stage 49 of Stimulation
2018-03-14 Perforation
2018-03-14 Performed Stage 50 of Stimulation
2018-03-14 Performed Stage 51 of Stimulation
2018-03-15 Perforation
2018-03-15 Performed Stage 52 of Stimulation
2018-03-15 Performed Stage 53 of Stimulation
2018-03-16 Perforation
2018-03-16 Performed Stage 54 of Stimulation
2018-03-17 Perforation
2018-03-17 Performed Stage 55 of Stimulation
2018-03-18 Perforation
2018-03-18 Performed Stage 56 of Stimulation
2018-03-18 Performed Stage 57 of Stimulation
2018-03-19 Perforation
2018-03-19 Performed Stage 58 of Stimulation
2018-03-19 Performed Stage 59 of Stimulation
2018-03-20 Perforation
2018-03-20 Performed Stage 60 of Stimulation
2018-03-20 Performed Stage 61 of Stimulation
2018-03-21 Perforation
2018-03-21 Performed Stage 62 of Stimulation
2018-03-21 Performed Stage 63 of Stimulation
2018-03-22 Perforation
2018-03-22 Performed Stage 64 of Stimulation
2018-03-22 Performed Stage 65 of Stimulation
2019-08-14 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-15 2018-03-21 6,747 26,986,700 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.00193016 4965.82
Hydrochloric Acid 7647-01-0 15 0.00386031 9931.65
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.0169054 43493.6
organic phosphonic salts 15827-60-8 15 0.00266928 6867.41
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.5342 225,204,000.0
Acid Inhibitor, KAI-12 Keane Acid Inhibitor Cinnamaldehyde 104-55-2 10 0.00007603 195.596
formic acid 64-18-6 10 0.00007603 195.596
Ethoxylated alcohol 68131-39-5 10 0.00007603 195.596
Ethylene glycol 107-21-1 40 0.000304103 782.384
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007603 195.596
isoproyl alcohol 67-63-0 5 0.00003801 97.798
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000152052 391.192
Iron Control, KFEAC-20/30 Keane Iron Control Citric acid 77-92-9 30 0.000641709 1650.96
Acetic acid 64-19-7 5 0.000106951 275.16
Biocide, MBC-516 Keane Biocide didecyldimethylammonium chloride 7173-51-5 8 0.000705475 1815.02
Glutaral 111-30-8 26.7 0.00236338 6080.41
ethonal 64-17-5 2.8 0.000247846 637.646
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000470021 1209.25
Water 7732-18-5 56.7 0.00502064 12916.9
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.3087 31,667,300.0
Friction Reducer, KFR-20 Keane Friction Reducer alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00509192 13100.3
oleic acid diethanolamide 93-83-4 1 0.00101838 2620.05
Petroleum distillate 64742-47-8 1 0.00101838 2620.05
Water 7732-18-5 30 0.0305515 78601.6
Copolymer of 2-propenamide 69418-26-4 5 0.00509192 13100.3
ammonium chloride 12125-02-9 30 0.0305515 78601.6
Other Chemical(s) Listed Above See Trade Name(s) List Citric acid 77-92-9 30 0.000641709 1650.96
organic phosphonic salts 15827-60-8 15 0.00266928 6867.41
Copolymer of 2-propenamide 69418-26-4 5 0.00509192 13100.3
ammonium chloride 12125-02-9 30 0.0305515 78601.6
isoproyl alcohol 67-63-0 5 0.00003801 97.798
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000470021 1209.25
Cinnamaldehyde 104-55-2 10 0.00007603 195.596
oleic acid diethanolamide 93-83-4 1 0.00101838 2620.05
Petroleum distillate 64742-47-8 1 0.00101838 2620.05
Ethoxylated alcohol 68131-39-5 10 0.00007603 195.596
alcohols, C 12-16, ethoxylated 68551-12-2 5 0.00509192 13100.3
Glutaral 111-30-8 26.7 0.00236338 6080.41
Water 7732-18-5 7.5 0.00193016 4965.82
formic acid 64-18-6 10 0.00007603 195.596
didecyldimethylammonium chloride 7173-51-5 8 0.000705475 1815.02
ethonal 64-17-5 2.8 0.000247846 637.646
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000152052 391.192
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007603 195.596

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2017-12-15 1 Sand, White 25,814,542 8,678 6,457
2017-12-16 2 Sand, White 25,814,542 8,107 5,205
2017-12-16 3 Sand, White 25,814,542 8,073 5,235
2017-12-17 4 Sand, White 25,814,542 8,060 6,116
2017-12-17 5 Sand, White 25,814,542 8,152 5,261
2017-12-28 6 Sand, White 25,814,542 7,655 5,051
2018-02-19 7 Sand, White 25,814,542 7,504 5,441
2018-02-20 8 Sand, White 25,814,542 7,376 6,580
2018-02-20 9 Sand, White 25,814,542 8,649 5,556
2018-02-21 10 Sand, White 25,814,542 9,290 5,845
2018-02-21 11 Sand, White 25,814,542 9,253 7,446
2018-02-22 12 Sand, White 25,814,542 9,505 7,536
2018-02-22 13 Sand, White 25,814,542 9,540 7,254
2018-02-23 14 Sand, White 25,814,542 9,451 6,243
2018-02-23 15 Sand, White 25,814,542 9,306 5,719
2018-02-24 16 Sand, White 25,814,542 9,757 6,031
2018-02-24 17 Sand, White 25,814,542 9,502 6,238
2018-02-25 18 Sand, White 25,814,542 9,292 6,150
2018-02-25 19 Sand, White 25,814,542 9,755 5,743
2018-02-26 20 Sand, White 25,814,542 9,736 5,452
2018-02-26 21 Sand, White 25,814,542 8,923 5,911
2018-02-27 22 Sand, White 25,814,542 8,965 5,465
2018-02-28 23 Sand, White 25,814,542 8,839 5,908
2018-02-28 24 Sand, White 25,814,542 8,793 5,806
2018-03-01 25 Sand, White 25,814,542 8,656 5,772
2018-03-01 26 Sand, White 25,814,542 8,751 6,380
2018-03-01 27 Sand, White 25,814,542 8,755 6,267
2018-03-02 28 Sand, White 25,814,542 8,675 5,873
2018-03-03 29 Sand, White 25,814,542 9,037 5,534
2018-03-04 30 Sand, White 25,814,542 8,475 5,810
2018-03-05 31 Sand, White 25,814,542 8,550 5,588
2018-03-05 32 Sand, White 25,814,542 8,574 6,343
2018-03-05 33 Sand, White 25,814,542 8,730 6,446
2018-03-06 34 Sand, White 25,814,542 8,746 6,865
2018-03-06 35 Sand, White 25,814,542 8,824 7,153
2018-03-06 36 Sand, White 25,814,542 9,458 6,920
2018-03-07 37 Sand, White 25,814,542 9,252 7,839
2018-03-07 38 Sand, White 25,814,542 9,130 7,082
2018-03-08 39 Sand, White 25,814,542 9,297 6,976
2018-03-08 40 Sand, White 25,814,542 9,262 6,493
2018-03-08 41 Sand, White 25,814,542 9,107 5,118
2018-03-09 42 Sand, White 25,814,542 8,523 6,352
2018-03-09 43 Sand, White 25,814,542 8,355 5,735
2018-03-10 44 Sand, White 25,814,542 8,222 5,698
2018-03-10 45 Sand, White 25,814,542 9,362 7,056
2018-03-11 46 Sand, White 25,814,542 8,135 5,463
2018-03-12 47 Sand, White 25,814,542 8,200 5,688
2018-03-12 48 Sand, White 25,814,542 7,833 5,363
2018-03-13 49 Sand, White 25,814,542 8,177 6,359
2018-03-14 50 Sand, White 25,814,542 8,029 6,140
2018-03-14 51 Sand, White 25,814,542 8,280 6,892
2018-03-15 52 Sand, White 25,814,542 8,015 6,438
2018-03-15 53 Sand, White 25,814,542 7,966 6,100
2018-03-16 54 Sand, White 25,814,542 7,861 6,551
2018-03-17 55 Sand, White 25,814,542 8,030 6,890
2018-03-18 56 Sand, White 25,814,542 7,948 7,050
2018-03-18 57 Sand, White 25,814,542 7,917 7,780
2018-03-19 58 Sand, White 25,814,542 7,852 7,539
2018-03-19 59 Sand, White 25,814,542 7,815 7,240
2018-03-20 60 Sand, White 25,814,542 8,094 6,620
2018-03-20 61 Sand, White 25,814,542 7,672 6,600
2018-03-21 62 Sand, White 25,814,542 7,196 6,224
2018-03-21 63 Sand, White 25,814,542 7,251 6,660
2018-03-22 64 Sand, White 25,814,542 7,781 6,880
2018-03-22 65 Sand, White 25,814,542 7,303 4,947

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 4,792,765.00 219 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 4,754,522.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CABOT OIL & GAS CORP Drill Cuttings 1,877.42 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 9.90 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 17.17 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 3.33 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 1,796.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018 CABOT OIL & GAS CORP Produced Fluid 9,649.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.11 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 76.20 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 52,389.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 152.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.38 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Waste Water Treatment Sludge 0.35 Tons REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 9,630.82 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2621149 Primary Facility 2017-07-31 Drilling/Alteration No Violations Noted At time of inspection, arrived on site at 11:35a.m. for a new spud inspection.

I met with Brett Wambold of Selman & Associates. United Drilling was on site to drill the holes and run the conductor pipe on the 1H, 2H, 3H, 4H, 6H, and 8H wells. The 3H, 4H and 8H were drilled to TD at 94'. There was a rig on the 1H and the 6H, the rig on the 1H was running 26 pipe to 25' and the rig on the 6H was at TD of 94' and started pulling drill pipe. The 2H was at a depth of 70'. All the conductor pipe will be run to 94' and cemented in. I took a walk around the location and there were no obvious concerns noticed. I left the site at 12:20p.m.

2634846 Primary Facility 2017-09-12 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Tony Ketterling. The surface and intermediate casings were cemented by Schlumberger with CemCrete cement. Proposed depth for the well is 20,164' I took a walk around the location and there were no obvious concerns noticed. No violation noted.

2700619 Primary Facility 2018-02-27 Routine/Complete Inspection No Violations Noted At time of inspection.

I met with company men Steve Barrett and Ken Wilson. Keane was on site to frac the 1H, 2H, 3H, 4H, 6H, and 8H wells. They were just starting stage 22 out of 65 stages on the 2H when I arrived. The 1H and 3H were both completed with 48 stages. There were 21 stages completed out of 69 stages on the 4H. There were 22 stages completed out of 67 stages on the 6H. The 8H wasn't started yet but will have 32 stages when completed. I took a walk around the location there were no obvious concerns noticed. There were no violations noted.

2719974 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection of the Tsourous well site on April 13, 2018 (Photo 1). The site had its last E&S inspection on April 13,2018 (Photo 16). The site had sediment being tracked from the site as well as running from the access road onto Lutz road. Lutz Road and Youngs Road were very muddy from truck traffic to the site and had a considerable amount of sediment pushed off the side (Photos 2, 18). This was in contrast to Lutz road beyond the access road to the well pad where the sediment was not nearly such a preponderance of sediment (Photo 17). The access road leading to the site was beset with problems. The entrance showed evidence of sediment leaving the site (Photo 2). The first culvert up the access road was occluded with sediment on both ends (Photo 4 and 5). There was also an unprotected topsoil pile near the entrance area (Photo 3). The slopes of the access road had sediment running off and accumulating around and beyond the filter sock BMPs (Photos 6,7,8,9,10). The sediment ran arou
2733246 Primary Facility 2018-05-21 Follow-up Inspection No Violations Noted I performed a follow up inspection of the Tsourous well site. The wells associated with this site are as follows: 115-22297, 115-22298, 115-22286, 115-22288, 115-22299, 115-22287. The areas of concern noted in the previous inspection have been addressed and repaired. There did not appear to be any additional erosional issues at the time of inspection. There were no violations noted.
2738771 Primary Facility 2018-06-06 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently completed and put in production. The well tag was on the well and correct. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. Fluid is going in a 500bbl flow back tank that is on containment and the containment appeared to be in good condition. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2765273 Primary Facility 2018-08-02 Routine/Complete Inspection No Violations Noted I arrived at the site at 12:10. The weather conditions are cloudy skies, and breezy with light rain falling, with temperatures in the low to mid 70's as I arrived. Shortly after I arrived, light rain evolved into a moderate, steady rainfall. There was no activity or personnel at the site. All permitted wells listed on the Site ID sign are in production. I observed trash and debris scattered in some areas of the well pad and tank pad surface. The trash was most likely deposited on the ground surface of the site during completions operations, which have concluded in a relatively recent time frame. I departed from the site at 12:53.
2809103 Primary Facility 2018-11-29 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection of the Tsourous well site. The well site is extensive and has a separate tank pad. The access road is quite long and steep but was plowed. The last E&S inspection was November 27, 2018.
    The weather was overcast and there was light snowfall the previous evening.  The  temperature was about 34 degrees.
    The road (Lutz Road) leading to the site was snowy and slushy.  There didn't appear to be any runoff along the roadside.
     The tank pad surface was snow covered and stable.  The infiltration basin, fill slope and topsoil pile all had good vegetation visible through the snow on them.  There didn't appear to be any erosional problems at the tank pad area.
    The well pad was expansive but had good growth on all slopes, visible through the snowcover.  The pad surface was mostly hard and partially plowed, with a few slushy areas.  The infiltration basin was mostly empty and appeared stable and growth was visible around it.  
    The wells were properly labeled and the
2835866 Primary Facility 2019-02-05 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was empty and there was no gas detected. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 1/2/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]

References