Well ID: 37-115-22284 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.727764,"lon":-75.687525,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Harford Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 150754 | |
Farm/Lease Name: HERBERT UNIT 4H | |
License Status: | |
Spud Date: | |
Permit Date: 2017-03-15 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.727764 | |
Longitude: -75.687525 |
Date | Event |
---|---|
2017-03-15 | New Permit Application |
2017-12-11 | Permit Renewal Application |
2018-04-16 | Performed Spud Operation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CHIEF OIL & GAS LLC | 403,189.55 | 42 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2018 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,072.42 Tons | LANDFILL | 100933 |
2018 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 370.78 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 300.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 16,377.29 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2687762 | Primary Facility | 2018-01-22 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as a routine inspection. Site snow covered. Plowing has occurred since last snow fall. No E&S issues observed. No violations noted. |
2719031 | Primary Facility | 2018-04-17 | Drilling/Alteration | No Violations Noted | At time of inspection.
Met with company man Chris Davis and driller Steven Hostetler. Express Energy Service was on site and drilling the hole for the conductor pipe on the 4H well. They were at a depth of 78' at time of inspection. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2732136 | Primary Facility | 2018-05-21 | Drilling/Alteration | No Violations Noted | At time of inspection.
Met with company man Trey Villarreal. H&P 513 was on site and drilling the lateral section of the well. The proposed TD for the well is 13,421'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2764057 | Primary Facility | 2018-08-09 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as a routine inspection. No E&S issues were observed. No violations noted. |
2831889 | Primary Facility | 2019-01-25 | Follow-up Inspection | No Violations Noted | Today's inspection was conducted as a follow-up inspection. This inspection found that the violations noted in the Department inspection conducted on 10/22/18 and 11/30/18 and documented in Inspection Record #'s 2796240 and 2808752 respectively have been corrected. Drilling has been completed on the 1H and 4H. No stimulation has occurred yet. Overall the site has good stabilization. No E&S issues identified. No violations noted. |
For data sources see[7]