X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22012

Well Details

Well ID: 37-115-22012
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Bridgewater Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 152606
Farm/Lease Name: WARRINER S 7
License Status: Active
Spud Date: 2015-07-25
Permit Date: 2015-06-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.858694
Longitude: -75.848461

For data sources see[1][2][3]

Well History

Date Event
2015-06-16 New Permit Application
2015-07-23 Performed Spud Operation
2015-09-09 Drilling Completion
2016-01-10 Perforation
2016-04-01 Perforation
2016-04-01 Performed Stage 1 of Stimulation
2016-04-01 Performed Stimulation
2016-04-02 Perforation
2016-04-02 Performed Stage 2 of Stimulation
2016-04-02 Performed Stage 3 of Stimulation
2016-04-03 Perforation
2016-04-03 Performed Stage 4 of Stimulation
2016-04-04 Performed Stage 5 of Stimulation
2016-04-05 Perforation
2016-04-05 Performed Stage 6 of Stimulation
2016-04-06 Perforation
2016-04-07 Perforation
2016-04-07 Performed Stage 7 of Stimulation
2016-04-08 Perforation
2016-04-08 Performed Stage 8 of Stimulation
2016-04-09 Perforation
2016-04-09 Performed Stage 9 of Stimulation
2016-04-10 Perforation
2016-04-10 Performed Stage 10 of Stimulation
2016-04-11 Perforation
2016-04-11 Performed Stage 11 of Stimulation
2016-04-12 Performed Stage 12 of Stimulation
2016-04-13 Perforation
2016-04-13 Performed Stage 13 of Stimulation
2016-04-14 Perforation
2016-04-14 Performed Stage 14 of Stimulation
2016-04-15 Perforation
2016-04-16 Perforation
2016-04-16 Performed Stage 15 of Stimulation
2016-04-17 Perforation
2016-04-17 Performed Stage 16 of Stimulation
2016-04-18 Perforation
2016-04-18 Performed Stage 17 of Stimulation
2016-04-19 Perforation
2016-04-19 Performed Stage 18 of Stimulation
2016-04-20 Performed Stage 19 of Stimulation
2016-04-21 Perforation
2016-04-21 Performed Stage 20 of Stimulation
2016-04-22 Perforation
2016-04-23 Perforation
2016-04-23 Performed Stage 21 of Stimulation
2016-04-24 Perforation
2016-04-24 Performed Stage 22 of Stimulation
2016-04-25 Perforation
2016-04-25 Performed Stage 23 of Stimulation
2016-04-26 Perforation
2016-04-26 Performed Stage 24 of Stimulation
2016-04-27 Perforation
2016-04-27 Performed Stage 25 of Stimulation
2016-04-28 Perforation
2016-04-28 Performed Stage 26 of Stimulation
2016-04-29 Perforation
2016-04-29 Performed Stage 27 of Stimulation
2016-04-30 Perforation
2016-04-30 Performed Stage 28 of Stimulation
2016-04-30 Performed Stage 29 of Stimulation
2016-05-01 Perforation
2016-05-01 Performed Stage 30 of Stimulation
2016-05-01 Performed Stage 31 of Stimulation
2016-05-02 Performed Stage 32 of Stimulation
2016-07-11 NEWLY DRILLED
2017-03-13 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-03-31 2016-05-01 6,548 11,682,700 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Plexcide 15G Chemplex Biocide Didecyl Dimethyl Ammonium Chloride 7173-51-5 3 0.000696402 768.887
Glutaraldehyde 111-30-8 14 0.00324988 3588.14
Ethanol 64-17-5 3 0.000696402 768.887
Alkyl Dimethyl Benzyl Ammonium Chloride 68424-85-1 3 0.000696402 768.887
15% HCL Reagent Acidizing Hydrochloric Acid 7647-01-0 15 0.0400325 44199.3
Sand TSS Proppant Silica Substrate 14808-60-7 100 11.0273 12,175,100.0
Water Operator Carrier/Base Fluid Water 7732-18-5 100 88.5761 97,795,600.0
Plexslick 957 Chemplex Friction Reducer Nonionic Surfactants Proprietary 1.5 0.00119903 1323.84
Paraffinic, Naphtehenic Solvent 64742-47-8 30 0.0239807 26476.7
Ammonium Chloride 12125-02-9 5 0.00399678 4412.79
Poly (acrylamide-co-acrylic acid), partial sodium salt 62649-23-4 35 0.0279775 30889.5
Chemplex 4-N-1 Chemplex Combination/Iron Control thiourea-formaldehyde copolymer 68527-49-1 2 0.00003562 39.325
Cocamide Diethanolamine Salt 68603-42-9 2 0.00003562 39.325
Alcohol Ethoxylate Surfactants Proprietary 2 0.00003562 39.325
n-olefins Proprietary 1 0.00001781 19.662
Diethanolamine 111-42-2 2 0.00003562 39.325
Methyl Alcohol 67-56-1 10 0.000178089 196.625
Propargyl Alcohol 107-19-7 1 0.00001781 19.662
Acetic Acid 64-19-7 85 0.00151375 1671.31
2-Ethylhexanol 104-76-7 10 0.000178089 196.625
Greenhib 679 Chemplex Friction Reducer Glycerine 56-81-5 20 0.00495219 5467.64
Proprietary Proprietary 35 0.00866634 9568.38

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-04-01 1 SAND WHITE 5,546 6,844 0
2016-04-02 2 SAND WHITE 5,546 7,280 7,200
2016-04-02 3 SAND WHITE 5,546 7,247 6,870
2016-04-03 4 SAND WHITE 5,546 7,446 6,630
2016-04-04 5 SAND WHITE 5,546 8,277 6,870
2016-04-05 6 SAND WHITE 5,546 6,947 6,530
2016-04-07 7 SAND WHITE 5,546 7,879 7,150
2016-04-08 8 SAND WHITE 5,546 7,959 7,330
2016-04-09 9 SAND WHITE 5,546 7,698 5,670
2016-04-10 10 SAND WHITE 5,546 7,350 6,850
2016-04-11 11 SAND WHITE 5,546 7,686 6,950
2016-04-12 12 SAND WHITE 5,546 7,145 6,970
2016-04-13 13 SAND WHITE 5,546 7,195 5,980
2016-04-14 14 SAND WHITE 5,546 7,141 5,820
2016-04-16 15 SAND WHITE 5,546 7,552 6,840
2016-04-17 16 SAND WHITE 5,546 7,406 6,240
2016-04-18 17 SAND WHITE 5,546 6,669 5,930
2016-04-19 18 SAND WHITE 5,546 6,857 6,860
2016-04-20 19 SAND WHITE 5,546 6,885 6,800
2016-04-21 20 SAND WHITE 5,546 6,668 6,970
2016-04-23 21 SAND WHITE 5,546 6,699 6,340
2016-04-24 22 SAND WHITE 5,546 6,663 5,260
2016-04-25 23 SAND WHITE 5,546 7,088 7,440
2016-04-26 24 SAND WHITE 5,546 6,610 7,280
2016-04-27 25 SAND WHITE 5,546 6,968 6,870
2016-04-28 26 SAND WHITE 5,546 7,101 6,910
2016-04-29 27 SAND WHITE 5,546 6,851 6,980
2016-04-30 28 SAND WHITE 5,546 6,981 7,930
2016-04-30 29 SAND WHITE 5,546 6,740 7,070
2016-05-01 30 SAND WHITE 5,546 6,285 5,940
2016-05-01 31 SAND WHITE 5,546 6,119 7,630
2016-05-02 32 SAND WHITE 5,546 5,843 6,780

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 2,196,388.55 219 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 2,599,589.60 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 1,856,277.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 1,363,896.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CABOT OIL & GAS CORP Drilling Fluid Waste 63.99 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CABOT OIL & GAS CORP Drill Cuttings 1,318.55 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Fracturing Fluid Waste 2,522.06 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CABOT OIL & GAS CORP Produced Fluid 1,508.38 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CABOT OIL & GAS CORP Synthetic Liner Materials 0.54 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Produced Fluid 32.29 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016 CABOT OIL & GAS CORP Produced Fluid 11,686.58 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Waste Water Treatment Sludge 16.92 Tons LANDFILL 301358
2016 CABOT OIL & GAS CORP Produced Fluid 580.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 CABOT OIL & GAS CORP Produced Fluid 4,251.62 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Fracturing Fluid Waste 12,063.56 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 1,728.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 1,095.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 37.45 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 62.52 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 2,270.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 1,308.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 2,967.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2392129 Primary Facility 2015-07-23 Preoperation Inspection No Violations Noted The Department was on site on 7/24/2015 at the Warriner S. Pad 1 to conduct a preoperational inspection. The wells associated with this pad are as follows:
2392833 Primary Facility 2015-07-27 Routine/Complete Inspection No Violations Noted
2404889 Primary Facility 2015-09-04 Drilling/Alteration No Violations Noted
2471261 Primary Facility 2016-04-05 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:15 p.m., met with the company man Rafael Rodriguez, Nine Energy Service was running a plug and perforation on a wire line into the 4H. Pumpco Services was on site and getting ready to stimulate stage 6 on the 3H. I took a walk around the location and everything looked OK.

The 3H-had 5 stages completed out of 19 and was stimulating stage 6 when I left. The 4H-had 1 stage completed out of 23. The 7H-had 5 stages completed out of 32. The 8H-had 5 stages completed out of 30. I left the site at 13:30 p.m.

2487475 Primary Facility 2016-05-12 Routine/Complete Inspection No Violations Noted I conducted an inspection of the site accompanied by Briana Cunningham, PADEP O&G WQS. Cabot submitted stimulation notices to the Department on 3/31/16 indicating hydraulic fracturing operations would commence on 3/31/16. We met with Don Griffith, site company man. Mr. Griffith informed us the following. "Flowback operations commneced at 5AM, today, 5-12-16. The S Warriner 3H, 4H, 7H and 8H wells are in the process of being flowed back simultanoeusly. Erick Flowback Services is the Cabot subcontractor conducting the flowback process. At this point, the wells are only flowing back water, no gas has been encountered. Rain for Rent frac tanks on containment in the tank battery in the tank pad section of the site are not being used to contain flowback water from the wells. The tanks were used during hydraulic fracturing. Flowback water is being stored in gas buster and frac tanks on containment near the wells. The other work crew on-site is in the process of setting up the wells for production."

There w

2497402 Primary Facility 2016-06-29 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:25a.m., the wells were in production with the production line going through a sand separator and the fluid going to a five hundred barrel gas buster tank. The cellar had water at the bottom with no bubbling noticed, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 590psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 12:05p.m.

2500406 Primary Facility 2016-06-27 Routine/Complete Inspection No Violations Noted
2548778 Primary Facility 2016-12-12 Follow-up Inspection No Violations Noted The Department was on hand to conduct a Follow Up inspection of the Warriner Pad (ESX29-115-0011) The wells associated with this pad are as follows:

3H (115-22010) novio 4H (115-22011) pend 7H (115-22012) novio 8H (115-22013) novio

The Department, represented by Jon Sassi and Frank Hoehle were previously on site December 9, 2016 to inspect a release which occurred December 8, 2016.

The brine tanks which had issues had been switched out with other tanks on site, and there was fresh gravel under all brine tanks on site. All piping to tanks had evidence of recent maintenance (fresh teflon tape) and there were no unusual conductivity readings surrounding tank area. The rolloff container which had been on site has been removed and the tank from which the release occurred now sits idle at the east side of the tank battery. All residue of release has been cleaned up and removed from site.

There were no violations.


If there are any questions please feel free to contact me at (570)346-5539.

2586476 Primary Facility 2017-04-24 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:45p.m.

The cellar had water at the bottom with no bubbling noticed. The (20x13) annulus vent pipe was open and venting into a small plastic tank, the (13x9) annulus vent pipe was open and venting into a small plastic tank, the (9x5) annulus vent pipe was open and venting into a small plastic tank. There was 533psi on the production casing. I took a walk around the location and there were no obvious concerns noticed. I left the site at 13:30p.m.

2661647 Primary Facility 2017-11-14 Routine/Complete Inspection No Violations Noted On November 14,2017 I inspected the Warriner S P1 pad for a routine E&S inspection. The pad was located at the end of a relatively long access road which was solid and stable. The pad itself was solid with a bit of ponding due to recent rains. The fill slope and all vegetated areas were in good shape and well stabilized. There did not appear to be any erosional issues at the time of inspection.

There were no violations noted.

2693015 Primary Facility 2018-02-08 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2792497 Primary Facility 2018-10-22 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 7' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[9]

References