37-115-21990

Well Details

Well ID: 37-115-21990
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 152445
Farm/Lease Name: DECKER T 3
License Status: Active
Spud Date: 2015-05-14
Permit Date: 2015-04-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.783881
Longitude: -75.693828

For data sources see[1][2][3]

Well History

Date Event
2015-04-10 New Permit Application
2015-05-12 Performed Spud Operation
2015-06-14 Drilling Completion
2016-05-05 Perforation
2016-06-23 Perforation
2016-06-23 Performed Stage 1 of Stimulation
2016-06-24 Perforation
2016-06-24 Performed Stage 2 of Stimulation
2016-06-25 Perforation
2016-06-25 Performed Stage 3 of Stimulation
2016-06-25 Performed Stage 4 of Stimulation
2016-06-26 Perforation
2016-06-26 Performed Stage 5 of Stimulation
2016-06-27 Perforation
2016-06-27 Performed Stage 6 of Stimulation
2016-06-28 Perforation
2016-06-28 Performed Stage 7 of Stimulation
2016-06-29 Perforation
2016-06-29 Performed Stage 8 of Stimulation
2016-06-30 Perforation
2016-06-30 Performed Stage 9 of Stimulation
2016-07-01 Perforation
2016-07-01 Performed Stage 10 of Stimulation
2016-07-07 Perforation
2016-07-07 Performed Stage 11 of Stimulation
2016-07-08 Perforation
2016-07-08 Performed Stage 12 of Stimulation
2016-07-09 Perforation
2016-07-09 Performed Stage 13 of Stimulation
2016-07-10 Perforation
2016-07-10 Performed Stage 14 of Stimulation
2016-07-11 Perforation
2016-07-11 Performed Stage 15 of Stimulation
2016-07-12 Perforation
2016-07-12 Performed Stage 16 of Stimulation
2016-07-13 Perforation
2016-07-13 Performed Stage 17 of Stimulation
2016-07-14 Perforation
2016-07-14 Performed Stage 18 of Stimulation
2016-07-15 Perforation
2016-07-15 Performed Stage 19 of Stimulation
2016-07-16 Perforation
2016-07-16 Performed Stage 20 of Stimulation
2016-07-17 Perforation
2016-07-17 Performed Stage 21 of Stimulation
2016-07-18 Perforation
2016-07-18 Performed Stage 22 of Stimulation
2016-07-19 Perforation
2016-07-19 Performed Stage 23 of Stimulation
2016-07-20 Perforation
2016-07-20 Performed Stage 24 of Stimulation
2016-07-21 Perforation
2016-07-21 Performed Stage 25 of Stimulation
2016-07-22 Performed Stage 26 of Stimulation
2016-07-23 Perforation
2016-07-24 Perforation
2016-07-24 Performed Stage 27 of Stimulation
2016-07-25 Performed Stage 28 of Stimulation
2017-01-23 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-06-22 2016-07-24 7,051 10,047,000 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Plexcide 15G Chemplex Biocide Alkyl Dimethyl Benzyl Ammonium Chloride 68424-85-1 3 0.000673526 640.871
Didecyl Dimethyl Ammonium Chloride 7173-51-5 3 0.000673526 640.871
Glutaraldehyde 111-30-8 14 0.00314312 2990.73
Ethanol 64-17-5 3 0.000673526 640.871
Greenhib 679 Chemplex Friction Reducer Glycerine 56-81-5 20 0.00478952 4557.31
Proprietary Proprietary 35 0.00838166 7975.28
15% HCL Reagent Acidizing Hydrochloric Acid 7647-01-0 15 0.040821 38841.8
Water Operator Carrier/Base Fluid Water 7732-18-5 100 88.4019 84,115,800.0
Plexslick 957 Chemplex Friction Reducer Poly (acrylamide-co-acrylic acid), partial sodium salt 62649-23-4 35 0.0293958 27970.6
Ammonium Chloride 12125-02-9 5 0.0041994 3995.8
Paraffinic, Naphtehenic Solvent 64742-47-8 30 0.0251964 23974.8
Nonionic Surfactants Proprietary 1.5 0.00125982 1198.74
Chemplex 4-N-1 Chemplex Combination/Iron Control Diethanolamine 111-42-2 2 0.00003632 34.558
thiourea-formaldehyde copolymer 68527-49-1 2 0.00003632 34.558
2-Ethylhexanol 104-76-7 10 0.000181596 172.792
Acetic Acid 64-19-7 85 0.00154357 1468.73
Cocamide Diethanolamine Salt 68603-42-9 2 0.00003632 34.558
n-olefins Proprietary 1 0.00001816 17.279
Alcohol Ethoxylate Surfactants Proprietary 2 0.00003632 34.558
Propargyl Alcohol 107-19-7 1 0.00001816 17.279
Methyl Alcohol 67-56-1 10 0.000181596 172.792
Sand TSS Proppant Silica Substrate 14808-60-7 100 11.1937 10,651,000.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-06-23 1 SAND, WHITE 918,167 7,177 7,800
2016-06-24 2 SAND, WHITE 918,167 7,110 6,870
2016-06-25 3 SAND, WHITE 918,167 7,323 6,680
2016-06-25 4 SAND, WHITE 918,167 6,925 7,000
2016-06-26 5 SAND, WHITE 918,167 7,016 7,270
2016-06-27 6 SAND, WHITE 918,167 6,801 7,090
2016-06-28 7 SAND, WHITE 918,167 6,818 6,630
2016-06-29 8 SAND, WHITE 918,167 6,644 6,800
2016-06-30 9 SAND, WHITE 918,167 7,163 8,190
2016-07-01 10 SAND, WHITE 918,167 6,929 7,080
2016-07-07 11 SAND, WHITE 918,167 6,825 7,620
2016-07-08 12 SAND, WHITE 918,167 6,843 8,110
2016-07-09 13 SAND, WHITE 918,167 6,741 8,110
2016-07-10 14 SAND, WHITE 918,167 7,154 8,020
2016-07-11 15 SAND, WHITE 918,167 7,323 8,320
2016-07-12 16 SAND, WHITE 918,167 7,246 8,200
2016-07-13 17 SAND, WHITE 918,167 7,242 8,870
2016-07-14 18 SAND, WHITE 918,167 6,922 8,000
2016-07-15 19 SAND, WHITE 918,167 6,925 8,150
2016-07-16 20 SAND, WHITE 918,167 6,643 8,210
2016-07-17 21 SAND, WHITE 918,167 6,475 8,610
2016-07-18 22 SAND, WHITE 918,167 6,546 8,370
2016-07-19 23 SAND, WHITE 918,167 6,677 8,550
2016-07-20 24 SAND, WHITE 918,167 6,195 7,740
2016-07-21 25 SAND, WHITE 918,167 6,551 7,870
2016-07-22 26 SAND, WHITE 918,167 6,413 8,040
2016-07-24 27 SAND, WHITE 918,167 6,125 7,190
2016-07-25 28 SAND, WHITE 918,167 5,331 5,340

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 2,285,591.91 152 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 3,065,021.07 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 1,690,716.00 352 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 1,298,952.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 CABOT OIL & GAS CORP Drill Cuttings 1,224.29 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Synthetic Liner Materials 10.55 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Fracturing Fluid Waste 8,076.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Fracturing Fluid Waste 10,630.51 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016 CABOT OIL & GAS CORP Produced Fluid 4,530.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016 CABOT OIL & GAS CORP Produced Fluid 316.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Waste Water Treatment Sludge 22.86 Tons LANDFILL 100933
2016 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.06 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2017 CABOT OIL & GAS CORP Produced Fluid 643.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 1,816.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017 CABOT OIL & GAS CORP Produced Fluid 449.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 954.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 75.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Produced Fluid 747.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 296.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 732.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2376868 Primary Facility 2015-06-08 Drilling/Alteration No Violations Noted
2379512 Primary Facility 2015-05-12 Preoperation Inspection No Violations Noted On 5/12/15, the Department conducted a Preoperational inspection of the Cabot Decker T. Pad located in Harford Township, Susquehanna County. The well pad is approximately 95% complete with all E&S BMP’s installed per plan. Major earth moving has not been started for the tank pad. All filter sock controls have been installed for the tank pad. No violations noted. The well permits that have been issued for the pad are: Decker T. 1H(115-21988), 2H(115-21989), 3H(115-21990), 5H(115-21991), and the 7H(115-21992).
2471003 Primary Facility 2016-04-01 Routine/Complete Inspection No Violations Noted
2480878 Primary Facility 2016-05-04 Drilling/Alteration No Violations Noted
2485721 Primary Facility 2016-05-18 Routine/Complete Inspection No Violations Noted
2495021 Primary Facility 2016-06-17 Drilling/Alteration No Violations Noted
2497875 Primary Facility 2016-07-01 Drilling/Alteration No Violations Noted
2500603 Primary Facility 2016-07-12 Drilling/Alteration No Violations Noted
2500604 Primary Facility 2016-07-12 Drilling/Alteration No Violations Noted
2500725 Primary Facility 2016-07-12 Routine/Complete Inspection No Violations Noted On 7/12/16, the Department conducted an inspection of the Cabot Decker T Well Pad located in Harford Township, Susquehanna County. The inspection involved reviewing the fill section of the pad that Williams is actively installing pipeline. This section of the pad looked good. Recent heavy rain events showed no impacts below the pads E&S and storm water controls. Fracking operations were observed taking place. Sand trucks were observed actively entering and leaving the pad. Water is being delivered to the pad via an above ground water line which is coming off the tank pad which has a battery of tanks on-site, located about an 1/8 of a mile away. No issues were observed from the installation and use of this line. Joe Gaboff, Department OGI was on the pad and noted that fracking of the 3H was being conducted at the time of his inspection. The other wells on this pad that are presumably being stimulated are the 1H, 2H, 5H, and 7H. No violations noted.
2507113 Primary Facility 2016-08-02 Routine/Complete Inspection No Violations Noted On 8/2/2016, the Department conducted an inspection of the COG Decker T Pad located in Harford Township, Susquehanna County. A crew from Stallion Oilfield Services is on-site conducting flow back operations. As of the inspection, the 1H and the 2H have been flowed back and are ready for production. The 3H, 5H, and the 7H are also slated to be prepped for production. Recent rain events have left some standing water on all four quadrants of the pad. Conductivity testing of the standing water in all four quadrants found no indicators that a release has occurred. During the inspection crews were actively vacuuming up excess water from almost all containment on the pad. Pad stability looks good. Pipeline tie-in to the pad looks stable. A review of the tank pad revealed all tanks and containment have been removed. Conductivity readings were also relatively low on this pad. No violations noted. The poly line has been removed that connected the tank pad to the well pad.
2510503 Primary Facility 2016-08-11 Routine/Partial Inspection No Violations Noted
2516402 Primary Facility 2016-08-29 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 9:50a.m., I spoke with well tender Jeremy Rapp and he told me the wells were turned into production on 8/22/16. They were still producing through sand separators and the fluid was going into a 500bbl flow back tank at about 34bbls per hour, the fluid was being hauled to Comtech. The cellar had water at the bottom with no bubbling noticed, the (13x9) vent pipe was open and venting into a tank, the (9x5) vent pipe was open and venting into a tank, there was 643psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 10:45a.m.

2516770 Primary Facility 2016-08-30 Routine/Complete Inspection No Violations Noted On 8/30/16, the Department conducted an inspection of the COG Decker T Pad located in Harford Township, Susquehanna County. Good stabilization of the site exists. E&S BMP’s still emplaced and in good condition. Perennial vegetation appears to be well established. All 5 wells associated with this well pad have been drilled, stimulated, and appear to be in production. Most drill rig/stimulation containment has been removed. Permanent production equipment has been installed and is operational. A frac tank is located next to the permanent production fluid containment, and appears to be present to increase holding volume of initial produced fluid. 2 large roll off containers on-site, on containment with sawdust in each presumably being utilized for bulking purposes. Large number of frac tanks(20ish) still on pad on containment. A small crew was on-site removing temporary buried piping. No visible sign of a release was observed. No violations noted.
2533799 Primary Facility 2016-11-01 Routine/Complete Inspection No Violations Noted On 11/1/16, the Department conducted an inspection of the COG Decker T Well Site located in Harford Township, Susquehanna County in response to a nearby malodor complaint. The Department arrived on-site at approximately 11:00 AM. There are 5 wells drilled and in production on this pad, the 1H, 2H, 3H, 5H and the 7H. The pad is equipped with the standard equipment associated with steady state production. There was also a backhoe and a utility truck parked on the pad. No other activity is occurring at this pad. I spent approximately 5 minutes at each corner of the well pad and did not detect any malodors. No E&S issues were observed during this inspection. No violations noted.
2612739 Primary Facility 2017-07-06 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:45p.m.

The cellar was half full of water with no bubbling noticed. The (20x13) annulus vent pipe was open and venting into a small plastic tank, the (13x9) annulus vent pipe was open and venting into a small plastic tank, the (9x5) annulus vent pipe was open and venting into a small plastic tank. All the annulus vent pipes were connected to one pipe going into the same tank. There was 522psi on the production casing. I took a walk around the location and there were no obvious concerns noticed. I left the site at 13:25p.m.

2683525 Primary Facility 2018-01-17 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Site covered by about 7" of fresh snow. Well pad and access road have been plowed. No obvious E&S issues noted during the inspection. All wells drilled on pad appear to be in production. No violations noted.
2716927 Primary Facility 2018-04-10 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2774367 Primary Facility 2018-09-12 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Standing water on the pad surface was tested for conductivity with all results confirmed to be less than 215 uS. Good, permanent stability of the site exists. No violations noted.
2819660 Primary Facility 2018-12-27 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 7' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar with a MSA Altair 5X multi gas detector that was calibrated on 12/3/18. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 12/3/18. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2826143 Primary Facility 2019-01-11 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. All five wells appear to be in production. Overall the site has good Stabilization. No E&S issues identified. No violations noted.
2856644 Primary Facility 2019-03-20 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted.

For data sources see[9]

References