37-115-21339

Well Details

Well ID: 37-115-21339
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Lenox Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 145740
Farm/Lease Name: SPENCER UNIT 4H
License Status: INACTIVE
Spud Date:
Permit Date: 2013-07-30
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.660206
Longitude: -75.755383

For data sources see[1][2][3]

Well History

Date Event
2013-07-30 New Permit Application
2013-09-07 Performed Spud Operation
2013-09-18 Drilling Completion
2014-06-05 Drilling Completion
2014-07-27 Perforation
2014-07-27 Performed Stimulation
2015-01-12 DEVIATED
2015-01-13 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-07-27 2014-07-31 7,632 8,193,070

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FR-66 Halliburton Friction Reducer Hydrotreated Light Petroleum Distillate 64742-47-8 30 0.02 0
Hydrochloric Acid 10-30% Halliburton Acid Hydrochloric Acid 7647-01-0 30 0.05 0
Water Provided by Customer Base Fluid Fresh Water 0000-00-0 100 99.9 0
MCS-2510T MULTI-CHEM Scale Inhibitor ETHYLENE GLYCOL 107-21-1 60 0.004 0
MCB-8614 MULTI-CHEM BIOCIDE GLUTARALDEHYDE 111-30-8 30 0.02 0
ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE 68424-85-1 5 0.003 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-07-27 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 3,867.46 13 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 329,558.41 353 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 238,974.51 333 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 212,762.65 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CHIEF OIL & GAS LLC Drilling Fluid Waste 770.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC006
2013 CHIEF OIL & GAS LLC Drill Cuttings 216.44 Tons LANDFILL 100933
2013 CHIEF OIL & GAS LLC Drilling Fluid Waste 957.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste 693.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 CHIEF OIL & GAS LLC Drill Cuttings 873.89 Tons LANDFILL 100933
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 13,091.76 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 1,200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste 853.43 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 1,591.24 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste 55.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2015 CHIEF OIL & GAS LLC Fracing Fluid Waste 23,117.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Produced Fluid 9.30 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Fracing Fluid Waste 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 CHIEF OIL & GAS LLC Produced Fluid 3,793.84 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 8,082.03 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Produced Fluid 240.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017 CHIEF OIL & GAS LLC Produced Fluid 4,588.79 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CHIEF OIL & GAS LLC Produced Fluid 3,720.72 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 3,823.45 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2215681 Primary Facility 2013-09-16 Drilling/Alteration No Violations Noted
2284315 Primary Facility 2014-05-20 Drilling/Alteration No Violations Noted orion 15 - Currently at 1002'. moved in on May 12th, started drilling 5/13. 13 3/8 set at 555'. 95/8 dry sy 1505'
2284379 Primary Facility 2014-05-07 Routine/Complete Inspection No Violations Noted Well drilled. No visible bubbling. Crews onsite laying liner and boards
2326478 Primary Facility 2014-12-03 Routine/Complete Inspection No Violations Noted The site had adequate vegetation and was stabilized. The last E&S inspection took place on 11/28/2014. E&S plans were on site and adequate.
2336757 Primary Facility 2015-01-14 Routine/Complete Inspection No Violations Noted On 1/14/15, the Department was on site at the Chief Spencer Well Pad to conduct an inspection. The well permits that have been issued for this site are the Spencer 1H (115-21336), 2H (115-21337), 3H (115-21338), 4H (115-21339), 5H (115-21433), 6H (115-21568), and the 7H (115-21569). Well site stability is good. E & S inspections up-to-date. A crew is on-site conducting flow back operations of the 4H, the only well drilled on this site. The purpose of the flow back operation is to conduct production logging. There are no plans to place this well into production in the near future. A tank farm and flare stack are in place and are being utilized as part of this operation. Containment looks good. No violations noted.
2337705 Primary Facility 2015-01-16 Follow-up Inspection No Violations Noted An Integrated Production Services coil tubing unit is on the location. Flowback procedures are still in progress for the Spencer Unit 4H well. While in the process of surveying secondary containment, the equipment and frac tanks associated with the flowback procedures and the ground surface of the Pad, the Department observed (2) light towers and a heating unit staged on containment systems which are not completely secure. Frac Sand was also observed on the pad surface near the flare stack and on the fill slope of the pad. We inquired with the company man the reason as to why the frac sand was on the pad surface and fill slope. He stated that the sand was used during hydraulic fracturing operations for the Spencer Unit 4H well and remnants of the sand were left at the site. The Department had suspected the possibility a slug of fluid mixed with the sand may have escaped out of the top of the flare stack during natural gas flaring of the well during flowback operations. The company man informed us that this did not occur.
2437327 Primary Facility 2015-11-24 Routine/Complete Inspection No Violations Noted Inspection in conjunction with Hickory Ridge Pipeline NOT inspection. No issues observed.
2467887 Primary Facility 2016-03-22 Routine/Complete Inspection No Violations Noted
2500347 Primary Facility 2016-07-11 Routine/Complete Inspection No Violations Noted
2542836 Primary Facility 2016-11-18 Routine/Complete Inspection No Violations Noted 11/18/16, the Department conducted an inspection of the Chief Spencer Well Pad located in Lenox Township, Susquehanna County. The inspection was in response to a complaint that gas well venting was occurring on this pad. The Department arrived on site and found no active activity occurring on this pad beyond steady state operations. Of the seven wells that have been permitted for this site, only 2 wells have been drilled on this pad, the 3H (115-21338) and the 4H (115-21339). The 3H has only had the Surface and Intermediate casings installed, with inactive status granted on 5/9/16. The 4H has been drilled, stimulated, flowed back, and appears ready to be placed into production, with all associated production equipment installed on-site and tied in. The 4H appeared to be shut in during this inspection. Both wells have their annuluses vented to a single poly tank, with no obvious venting occurring on the pad. As the first photograph shows, an enclosed, fenced in area next to the pad on the well connect
2736459 Primary Facility 2018-05-31 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. No E&S issues were observed. No violations noted.
2766492 Primary Facility 2018-08-20 Routine/Complete Inspection No Violations Noted This inspection was conducted to confirm Chief's assessment that the project meets the minimum requirements for permit termination. The Department’s determination is that the site meets the requirements for permit termination. I recommend the NOT be approved.

For data sources see[9]

References