37-115-20936

Well Details

Well ID: 37-115-20936
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Bridgewater Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148266
Farm/Lease Name: E BUNNELL 6
License Status:
Spud Date:
Permit Date: 2012-06-07
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.780661
Longitude: -75.847158

For data sources see[1][2][3]

Well History

Date Event
2012-06-07 New Permit Application
2012-06-09 Performed Spud Operation
2012-08-18 Drilling Completion
2012-10-04 Perforation
2012-10-04 Performed Stimulation
2013-05-01 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-09-27 2012-09-27 6,628 5,180,826
2 2012-09-06 2012-09-06 6,628 1,402,884

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FRW-18 Baker Hughes Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Alpha 1427 Baker Hughes Biocide Glutaraldehyde 111-30-8 0.30 0.00679900
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 0.05 0.00113300
Ethanol 64-17-5 0.05 0.00113300
Didecyl dimethyl ammonium chloride 7173-51-5 0.10 0.00226600
GW-3LDF Baker Hughes Gelling Agent Quartz 14808-60-7 5.00 0.00040900
Isotridecanol, ethoxylated 9043-30-5 5.00 0.00040900
Guar gum 9000-30-0 0.60 0.00490700
Distillates, petroleum, hydrotreated light paraffinic 64742-55-8 0.30 0.00245400
1-Butoxy-2-propanol 5131-66-8 0.05 0.00040900
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.00245400
Sand, White, 40/70 Baker Hughes Proppant Quartz 14808-60-7 100.00 10.88
Hydrochloric Acid 10.1-15 Baker Hughes Acidizing Water 7732-18-5 0.85 0.50
Hydrochloric acid 7647-01-0 0.15 0.08
CI-14 Baker Hughes Corrosion Inhibitor Propargyl alcohol 107-19-7 0.05 0.00004400
Olefin 0.05 0.00004400
Polyoxyalkylenes 30.00 0.00026500
Fatty Acids 0.10 0.00008800
Ferrotrol 300L Baker Hughes Iron Control
Water Operator Carrier Water 7732-18-5 1.00 87.68
Enzyme G-NE Baker Hughes Breaker Hemicellulase Enzyme Concentrate 9025-56-3 0.05 0.00006500
Water 7732-18-5 0.95 0.00123800
Ferrotrol 300L Hughes Iron Control
Citric acid 77-92-9 0.60 0.00076800
Sand, White, 100 mesh Baker Hughes Proppant Quartz 14808-60-7 1.00 0.66
Scaletrol 720 Baker Hughes Scale Inhibitor Ethylene glycol 107-21-1 0.30 0.00452000
Calcium chloride 10043-52-4 5.00 0.00075300
Clay Master-5C Baker Hughes Clay Control 1,2-Ethanediaminium, N, N'-bis[2-[bis(2-hydroxyethyl)methylammonio]ethyl]-N,N'bis(2-hydroxyethyl)-N,N'-dimethyl-,tetrachlorid
e
138879-94-4 0.60 0.00035900
2 Super TSC LT Superior Well Services Paraffin & Scale Additive Proprietary 50.00 0.01
Proprietary 15.00 0.00373800
0.00373800
Water 7732-18-5 60.00 0.01
Proprietary 15.00
Iron Acid 10M (12.6-18.0) Superior Well Services Acid Blend Water 7732-18-5 84.10 0.50
Hydrochloric acid 7647-01-0 15.80 0.09
Proprietary 1.20 0.00720300
WFR-3B Superior Well Services Friction Reducer 1,2-Propylene glycol 57-55-6 40.00 0.04
Water 7732-18-5 40.00 0.04
Ethoxylated C12-16 alcohols 68551-12-2 15.00 0.01
1,2-Propylene glycol 57-55-6 15.00 0.01
Distillates, petroleum, hydrotreated light 64742-47-8 50.00 0.05
Poly(oxy-1,2-ethanediyl), .alpha.,.alpha.'-[[(9Z)-9-octadecenylimino]di-2,1-ethanediyl]bis[.omega.-hydroxy
-
26635-93-8 5.00 0.00549000
Microparticle 1.00 0.00109800
KR-153SL Superior Well Services Biocide 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.00545900
Water 7732-18-5 80.00 0.02
PA Specific 40/70 mesh Sand Superior Well Services Sand - Bulk - Pennsylvania Alumina 1344-28-1 1.10 0.12
Ferric oxide 1309-37-1 0.10 0.01
Quartz 14808-60-7 99.90 10.91
Titanium dioxide 13463-67-7 0.10 0.01
Acid Inhibitor 2 (AI-2) Superior Well Services Acid Corrosion Inhibitor Propargyl alcohol 107-19-7 20.00 0.00020200
Tar bases, quinoline derivatives,
benzyl chloride-quaternized
72480-70-7 10.00 0.00010100
Poly(oxy-1,2-ethanediyl), alpha-(nonylphenyl)-omega-hydroxy-

,
branched

68412-54-4 13.00 0.00013100
Water 7732-18-5 40.00 0.00040300
Isopropanol 67-63-0 15.00 0.00015100
Glycol Ethers 20.00 0.00020200
PA Specific 100 mesh Sand Superior Well Services Sand - Bulk - Pennsylvania Alumina 1344-28-1 1.10 0.00647400
Quartz 14808-60-7 99.90 0.58
Titanium dioxide 13463-67-7 0.10 0.00058900
Ferric oxide 1309-37-1 0.10 0.00058900
Water Carrier/Base Fluid 100.00 87.48

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-10-04 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CABOT OIL & GAS CORP 1,084,087.08 78 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 3,451,309.43 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 1,884,718.19 349 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 1,029,054.21 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 1,339,657.20 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 965,397.69 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 896,465.00 349 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 706,214.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CABOT OIL & GAS CORP Drill Cuttings 718.97 Tons LANDFILL NY STATE #32S11
2012 CABOT OIL & GAS CORP Drilling Fluid Waste 95.11 Bbl LANDFILL NY STATE #32S11
2012 CABOT OIL & GAS CORP Drilling Fluid Waste 3,190.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Basic Sediment 26.46 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Fracturing Fluid Waste 10.88 Tons LANDFILL THR029
2012 CABOT OIL & GAS CORP Fracing Fluid Waste 6,644.74 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Drill Cuttings 83.46 Tons LANDFILL 101247
2012 CABOT OIL & GAS CORP Produced Fluid 45.75 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2012 CABOT OIL & GAS CORP Drill Cuttings 472.64 Tons LANDFILL THR029
2012 CABOT OIL & GAS CORP Produced Fluid 3,263.04 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Drilling Fluid Waste 1,820.08 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Fracing Fluid Waste 2,977.14 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 4,014.31 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 605.79 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 74.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2014 CABOT OIL & GAS CORP Produced Fluid 652.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 314.68 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 185.38 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 230.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 228.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 108.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 196.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 89.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 170.52 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2119744 Primary Facility 2012-11-26 Incident- Response to Accident or Event Viol(s) Noted & Immediately Corrected Arrived at the site at 10:00 in response to a release of approximately (20) gallons of production fluid that occurred on 11-21-12 at 4:30 AM. Mr. Webster reported the spill to the Department on 11/21/12 at 12:54 PM. According to the incident report, the result of the release was due to a hammer union coming apart on the line to the production tank associated with the E Bunnell 6H Well. Cabot was able to determine the quantity of the release based on the alarm and the amount of fluid that has been sent to the production fluid tank. G.L Parrish, Cabot and Resource Environmental Inc. arrived at 6AM on 11/21/12 to rig down the GPU. GDS began excavation at 2PM on 11/21/12 under the supervision of Resource. A total of (20) cubic yards of impacted material has been removed from the site. The impacted material was placed into (2) roll-off containers, each half full.
2124217 Primary Facility 2012-10-03 Incident- Response to Accident or Event No Violations Noted
2125850 Primary Facility 2012-11-26 Incident- Response to Accident or Event No Violations Noted Cabot consultant noted a stained area around the production tanks. At this time the consultant took soil conductivity readings which were noted to be “suspect.” Production tanks were rigged down and moved. The production tanks are now situated on liner. On 11/23/12 the stained area was excavated and samples were collected. The excavation measured an approximate 34’X25’X3.5”. A total of 30 cubic yards of material were removed. The waste disposal will be handled by Diaz and it will be taken to Tunnel Hill Landfill in Ohio. Cabot employees suspect the issue occurred due to hoses that were rigged on the top of the production tanks to offload the fluid. Possible that the lines were not being cleared sufficiently, and fluid left in the lines had been dripping over time in the area causing the stain.Mr. Webster stated that Cabot Oil & Gas removed the hoses from the top of the tank and will now have the truck drivers attach the hose upon arrival and remove the hose at departure to prevent future occurrences. Violations attached to (115-20935)
2304148 Primary Facility 2014-08-28 Routine/Partial Inspection No Violations Noted
2367428 Primary Facility 2015-05-06 Routine/Complete Inspection No Violations Noted
2438826 Primary Facility 2016-01-07 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:00 p.m., the cellar was full of water and ice with no bubbling noticed, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 739psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 13:30 p.m.

2440731 Primary Facility 2015-09-08 Routine/Complete Inspection No Violations Noted Inspection in conjunction with the notice of termination inspection of the Vandermark Pipeline. No issued observed at the time of the inspection.
2489060 Primary Facility 2016-05-26 Site Restoration No Violations Noted Inspection of the Bunnell E P2 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit.

The restored pad size is consistent with the PCSM/Site Restoration Plan. Post construction storm water management devices are in place according to approved plans and appear to be functioning properly.

However, it appears all temporary erosion and sedimentation BMPs have not been removed from the site - a triple filter sock sediment trap remains on the east side of the pad. There are also areas that are not meeting the permanent stabilization requirements and are a cause for concern regarding erosion:

1. The former access road from the well pad to the restored tank pad has little to no vegetation and is sloped enough to be a concern regarding erosion. 2. The south fill slope is sparsely vegetated in areas and has tracks with no vegetation from some type of heavy equipment running from the well pad surface to the bottom of the slope in several areas. The spa

2541671 Primary Facility 2016-12-05 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:30p.m., the cellar was about half full of water with no bubbling noticed. The (13x9) vent pipe was open and venting into a small plastic tank, the (9x5) vent pipe was open and venting into a small plastic tank. There was 609psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 14:05p.m.

2557863 Primary Facility 2017-02-02 Routine/Complete Inspection No Violations Noted The Department was on site in response to the receipt of a Restoration Report. At the time of the inspection, the Department noted that the E&S Inspection Log indicated that Jeff Look (TEC) conducted the most recent inspection on1/4/2016 and that it was a post precipitation inspection.

PCSM BMP's included a vegetated filter strip south of the well site. The site appears to be stable.

2743314 Primary Facility 2018-06-18 Routine/Complete Inspection No Violations Noted There was no activity occurring at the site during the inspection. There were no violations noted. If you have any questions, please contact me.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2119744 654812 11/26/2012 2012-11-26 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. Environmental Health & Safety
2119744 654813 11/26/2012 2012-11-26 78.57 - Failure to post pit approval number Administrative Failure to collect the brine and other fluids produced during the operation and service of the well in a tank, pit or a series of pits or tanks, or other device approved by the Department for subsequent disposal or reuse.
2119744 654815 11/26/2012 2012-11-26 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety