Well ID: 37-115-20861 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.646467,"lon":-75.961686,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 149402 | |
Farm/Lease Name: T FLOWER 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-02-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.646467 | |
Longitude: -75.961686 |
Date | Event |
---|---|
2012-02-07 | New Permit Application |
2012-08-11 | Performed Spud Operation |
2012-10-20 | Drilling Completion |
2012-11-01 | Perforation |
2012-11-09 | Performed Stimulation |
2014-03-13 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-11-08 | 2012-11-08 | 7,559 | 12,525,280 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ICI-3240 | Fisher Technical Services Inc. (FTSI) | Biocide | Sodium hydroxide | 1310-73-2 | 4.00 | 0.00100000 | |
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00599000 | |||||
Hydrochloric Acid 10.1-15 | Fisher Technical Services Inc. (FTSI) | Acidizing | Water | 7732-18-5 | 85.00 | 0.44 | ||
Hydrochloric acid | 7647-01-0 | 15.00 | 0.07 | |||||
CS-500 SI | Fisher Technical Services Inc. (FTSI) | Scale Inhibitor | Ethylene glycol | 107-21-1 | 10.00 | 0.00246000 | ||
Water | Carrier/Base Fluid | Water | 7732-18-5 | 100.00 | 88.12 | |||
40/70 White | Fisher Technical Services Inc. (FTSI) | Proppant | Crystalline Silica | 100.00 | 10.62 | |||
CI-150 (Corrosion Inhibitor) | Fisher Technical Services Inc. (FTSI) | Corrosion Inhibitor | Aromatic aldehyde | 10.00 | 0.00010000 | |||
Isopropanol | 67-63-0 | 60.00 | 0.00058000 | |||||
Quaternary ammonium compound | 10.00 | 0.00010000 | ||||||
Organic Amineresin Salt | 30.00 | 0.00029000 | ||||||
N,N-Dimethylformamide | 68-12-2 | 10.00 | 0.00010000 | |||||
100 Mesh | Fisher Technical Services Inc. (FTSI) | Proppant | Crystalline Silica | 100.00 | 0.60 | |||
FRW-200 | Fisher Technical Services Inc. (FTSI) | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 26.00 | 0.01 | ||
FE 100L (Iron Chelator) | Fisher Technical Services Inc. (FTSI) | Iron Control Product | Citric acid | 77-92-9 | 55.00 | 0.00096000 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-11-09 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | 663,697.04 | 22 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 8,411,155.14 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 4,120,721.80 | 358 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 3,058,998.28 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 2,823,233.36 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 1,864,296.23 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 698,242.00 | 223 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 512,777.00 | 351 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | Produced Fluid | 2,562.79 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,210.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 20.14 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 26,569.31 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 46.72 Tons | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 585.94 Tons | LANDFILL | 101247 |
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 999.40 Tons | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,179.54 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 7,599.49 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 1,570.31 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 2,697.43 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 13.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 1,580.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 81.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 748.59 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 426.88 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 445.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 461.55 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 309.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 380.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Other Oil & Gas Wastes | 23.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 127.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 381.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 4.70 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 3.87 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2105633 | Primary Facility | 2012-09-19 | Drilling/Alteration | No Violations Noted | Patterson 263. Running 13 3/8" casing now. Walked site with Co. man. Secondary containment in place and in good condition. Having safety meeting while on site prior to running casing. Haliburton on standby to cement. No violations observed at this time. |
2115091 | Primary Facility | 2012-11-07 | Drilling/Alteration | No Violations Noted | Walked pad pre-frac suggested enhaced containment |
2125271 | Primary Facility | 2012-12-05 | Routine/Complete Inspection | No Violations Noted | Production crews on site. Flow back of wells is complete. Crews on site are breaking down flow back equipment. Secondary containment in place. Well tags are present. Site Id sign correct. No violations observed. |
2246179 | Primary Facility | 2014-02-04 | Incident- Response to Accident or Event | Pending | Arrived at the site at 13:45 in response to a spill of (15) gallons of production fluid. The spill occurred as a result of the dump line freezing. |
2271279 | Primary Facility | 2014-05-16 | Administrative/File Review | Viol(s) Noted & Immediately Corrected | |
2691995 | Primary Facility | 2018-01-29 | Routine/Complete Inspection | No Violations Noted | Arrived on location at 11:30. Accompanied by DEP OGI, Ulyana Trynovich. Weather: Clear, cold, ~ 25 degs. (2) existing wells were present and in production, the Flower, T. 1H and 2H. Both wells (13x9) and (9x5) annuli were open and venting, plumbed to a common, shared vent tank. A Gas check performed at vent tank showed 100% LEL, 20% CH4. *Due to the commingling of the (13x9) and (9x5) annular vents to these vent tanks, a follow-up inspection will need to be scheduled with Operator to check the (13x9) cemented annuli for any sustained presence of gas. Please contact me when these (13x9) vents can be separated or isolated and rechecked. (kenkennedy@pa.gov). Both wells Prod. casing, Static and Differential pressures were being monitored by wireless sending units sending data to onsite Total Flow Control Unit "TFCU". See individual well pressures and flow rates listed below:
(CP= prod. casing press., SP= static press., DP= differential press.) - 1H: CP= 573.2 psi., SP= 557.3 psi., DP= 94.2 psi. - 2H: CP= 581.2 |
2697689 | Primary Facility | 2018-02-14 | Follow-up Inspection | No Violations Noted | Arrived on location at 08:15. Weather: Overcast, cold, ~ 32 degs. (2) existing wells were present and in production, the Flower, T. 1H and 2H. Onsite in follow up to previous insp. performed on 1/29/18. Upon arrival I met with Cabot Rep., Aaron Onks. As requested in previous inspection, Mr. Onks had isolated both wells (13x9) and (9x5) annuli and opened vents to atmosphere at ~ 8:00 this morning. Gas checks performed at these annular vents showed:
- Flower, T. 1H: (13x9): Initial check 100% LEL, 2% CH4, diminishing to a Final check of 0% LEL, 0% CH4. (9x5): 0% LEL, 0% CH4. - Flower, T. 2H: (13x9): Initial check 100% LEL, 4% CH4, diminishing to a Final check of 0% LEL, 0% CH4. (9x5): 100% LEL, 100% CH4 sustained. It appears the initial gas hits detected at both wells (13x9) annuli were from remnant, commingled, gas trapped within common vent lines which was sourced by the Flower, T. 2H wells (9x5) actively venting annulus. The gas venting at this (9x5) annulus is expected due to the production casing ceme |
2713984 | Primary Facility | 2018-03-22 | Drilling/Alteration | No Violations Noted | Matt Shope, DEP O&G WQS and I arrived at the site at 11:23 to conduct an inspection. The weather conditions were partly cloudy skies, quite breezy and cold with temps in the upper 30's. Precision Drilling Rig # 548 is at the site. Mr. Shope and I went inside of the company man trailer in search of the company man shortly after arrival. He was not inside the trailer. According to the white board on the wall in the trailer, Precision is currently drilling the T Flower 008 well at depth of (2,805.20) feet. Shortly after reviewing the board and computer screen containing information relevant to drilling of the well and reviewing drill cuttings waste manifests, Mr. Shope and I proceeded to conduct an inspection of the site. We had observed that a portion of the secondary containment liner was not secured in (3) separate areas of the site. See photos. We eventually met Marcus Cormier, site company man, consultant of Cabot. We had a brief discussion regarding our site inspection near the rig and where additional we |
2723274 | Primary Facility | 2018-04-20 | Routine/Complete Inspection | No Violations Noted | I was accompanied by Ken Kennedy (OGI) and Casey Baldwin (WQS/ET). Precision Drilling Rig 546 is currently operating at the site. Prior to conducting the inspection, we met with Marcus Cormir (Company Man). The 12H well was being drilled at time of the inspection. There were no violations noted. If you have any questions, please contact me. |
2756222 | Primary Facility | 2018-07-11 | Routine/Complete Inspection | No Violations Noted | I conducted the inspection accompanied by Jon Sassi (EPS) and Casey Baldwin (WQS/ET). At the time of the inspection, the 11H Well plugs were being drilled out, a Coil Tubing Unit was on the 6H Well, and another service rig was being prepared for the 3H Well. Additional information related to this inspection may be referenced in e-Facts Inspection ID: 2751430. If you have any questions, please contact me. |
2798834 | Primary Facility | 2018-10-16 | Incident- Response to Accident or Event | Viol(s) Noted & Immediately Corrected | Casey Baldwin, DEP O&GWQS out of the Scranton District Office and I arrived at the site 11:46 in response to a reported spill of an unknown volume and time of a spill of hydraulic fluid to the pad surface. The weather conditions are mostly sunny skies, breezy and brisk, with temperatures in the mid 40's. On 10/16/18 at 8:56, Brody Webster, Environmental Health and Safety Supervisor of Cabot Oil and Gas contacted me to report the spill incident. He stated the following during our phone conversation. "A well tender discovered staining on the pad surface earlier this morning , 10/16/18, as a result of a spill of hydraulic fluid. A coil tube unit recently performed clean out operations on the T Flower 2H well. Hydraulic fluid was released out of the unit and impacted the pad surface. We are not able to calculate the actual volume of the fluid released at this time, but believe it is not more than (5) gallons, and consider this a small spill. GasSearch Drilling Services (GDS) is at the site in the process of |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2271279 | 695972 | 05/16/2014 | 2014-05-16 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | Potential for pollutional substances to enter the waters of the commonwealth |
2271279 | 695973 | 05/16/2014 | 2014-05-16 | 78.57 - Failure to post pit approval number | Administrative | Failure to collect the brine and other fluids produced during the operation and service of the well in a tank, pit or a series of pits or tanks, or other device approved by DEP. |
2271279 | 695974 | 05/16/2014 | 2014-05-16 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | Failure to properly store, transport, process or dispose of a residual waste. |
2798834 | 832614 | 2018-10-16 | 2018-10-16 | CSL 402(b) | Environmental Health & Safety | The violation is cited due to the hydraulic fluid spill impacting the pad surface in the general vicinity of the T Flower 1H and 2H well. |
2798834 | 832615 | 2018-10-16 | 2018-10-16 | 78a56(a) | Environmental Health & Safety | The violation is cited due to the hydraulic fluid spill impacting the pad surface in the general vicinity of the T Flower 1H and 2H well. |
2798834 | 832616 | 2018-10-16 | 2018-10-16 | SWMA 301 | Environmental Health & Safety | The violation is cited due to the hydraulic fluid spill impacting the pad surface in the general vicinity of the T Flower 1H and 2H well. |
For data sources see[9]