If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20843 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.769322,"lon":-75.638342,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Gibson Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148384 | |
Farm/Lease Name: G DAVIS 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-01-18 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.769322 | |
Longitude: -75.638342 |
Date | Event |
---|---|
2012-01-18 | New Permit Application |
2012-05-25 | Performed Spud Operation |
2012-08-12 | Drilling Completion |
2013-01-06 | Perforation |
2013-01-06 | Performed Stimulation |
2013-04-10 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-01-03 | 2013-01-03 | 7,296 | 4,374,594 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 100 Mesh | FTSI | Proppant | Crystalline Silica | NA | 100.0 | 0.59204 | |
HCl, 10.1 - 15 | FTSI | Acidizing | Hydrochloric Acid | 7647-01-0 | 15.0 | 0.07816 | ||
Sodium Hydroxide | 1310-73-2 | 4.0 | 0.00101 | |||||
Water | 7732-18-5 | 85.0 | 0.44288 | |||||
Dimethylformamide | 68-12-2 | 10.0 | 0.0001 | |||||
Aromatic aldehyde | Proprietary | 10.0 | 0.0001 | |||||
Quaternary ammonium compound | Proprietary | 10.0 | 0.0001 | |||||
Organic Amineresin Salt | Proprietary | 30.0 | 0.00029 | |||||
ICI-3240 | FTSI | Biocide | Dazomet | 533-74-4 | 24.0 | 0.00607 | ||
FE-100L | FTSI | Iron Control Product | Citric Acid | 77-92-9 | 55.0 | 0.00094 | ||
CS-500 SI | FTSI | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 10.0 | 0.0025 | ||
40/70 White | FTSI | Proppant | Crystalline Silica | NA | 100.0 | 10.36887 | ||
FRW-200 | FTSI | Friction Reducer | Petroleum Distillate Hydrotrea | 64742-47-8 | 26.0 | 0.01698 | ||
CI-150 | FTSI | Corrosion Inhibitor | Isopropanol | 67-63-0 | 60.0 | 0.00057 | ||
Water | Operator | Carrier | Water | 7732-18-5 | 100.0 | 88.39976 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-01-06 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 1,702,166.78 | 250 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,161,617.19 | 351 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 727,925.22 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 540,308.09 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 653,746.17 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 301,383.00 | 347 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 264,299.00 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 19.84 Tons | LANDFILL | 101247 |
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 545.47 Tons | LANDFILL | NY STATE #32S11 |
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 292.33 Tons | LANDFILL | THR029 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 9,130.84 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1,313.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 1,754.98 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 1,838.73 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 1,934.24 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 62.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 927.56 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 3.89 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 433.34 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE004 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 713.34 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 311.89 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 302.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 723.60 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 226.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 90.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 285.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 78.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 94.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 501.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2072142 | Primary Facility | 2012-05-23 | Routine/Complete Inspection | No Violations Noted | Pre-operations inspection |
2074529 | Primary Facility | 2012-06-07 | Drilling/Alteration | No Violations Noted | Conductor set. Cellar not dug out yet. No activity on site. Pad not yet completed. Appears to be some finish work left on pad surface. Site ID sign posted with proper information. Permit #'s posted for 2H and 3H. Two conductors set. No violations observed at this time. |
2485747 | Primary Facility | 2016-05-18 | Routine/Complete Inspection | No Violations Noted | |
2501542 | Primary Facility | 2016-07-15 | Routine/Complete Inspection | No Violations Noted | |
2542220 | Primary Facility | 2016-12-07 | Routine/Complete Inspection | No Violations Noted | The Department was on site, to conduct a Routine Complete Inspection, in response to the submittal of a Restoration Report. The E&S Inspection Log indicated that Stephen P. Opeka conducted the most recent inspection on 12/1/16 and it was a Post-Precipitation Inspection. The receiving waters are an unnamed tributary to Bell Creek which is designated CWF.
A well tender was on site at the time of the Department's arrival. He appeared to be checking the various tanks on location. He explained that the 1H well has been shut in for a frac job on another site. The Department contacted Mike Pirner (Cabot OG) while on site to inquire about the third party disturbance. He explained that it was pipeline work. |
2552401 | Primary Facility | 2017-01-04 | Site Restoration | No Violations Noted | On 1/4/2017, the Department conducted an inspection of the COG Davis G P1 Well Site located in Gibson Township, Susquehanna County. The inspection was conducted in response to COG’s submittal of a Notice of Termination form for this site. The Department finds that the site is permanently stabilized and that PCSM BMP’s have been emplaced. There are 2 wells located on this site, the 2H(115-20843) and the 3H(115-20844). Both wells appear to be in production. I recommend this Notice of Termination be approved. |
2581112 | Primary Facility | 2017-04-10 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 8:50a.m.
The cellar was full of water with no bubbling noticed. The (13x9) annulus vent pipe was open and venting into the production tank, the (9x5) annulus vent pipe was open and venting into the production tank. There was 473psi on the production casing and 582psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 9:10a.m. |
2686475 | Primary Facility | 2018-01-25 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. The cellar was full of ice and unable to check for gas. The (20x13) annulus was below the ice level. The (13x9) and (9x5) annuli vent pipes were connected together and venting to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2751375 | Primary Facility | 2018-06-26 | Routine/Complete Inspection | No Violations Noted | I arrived at the site at 12:43. The weather conditions are mostly sunny skies and light winds with temperatures in the low to mid 70's. The was no activity and no Cabot personnel on-site during the inspection. The G Davis 2H and 3H wells are in production. I met with John Bankus, asset integrity specialist of Williams. He informed me that he was at the site to conduct an inspection of the Williams pipeline for cathodic protection and corrosion control. I used a Hanna HI 9831 Soil Test EC & Temp meter, a Hanna HI 9831 Groline Soil Test meter and an Oakton meter to conduct specific conductance (conductivity) screening in water in the sump for the G Davis Gas Production Units (GPU's) and containment unit for the production fluid storage tanks. Elevated conductivity readings were recorded in water in the gas production unit sump for the G Davis 3H well. See photos. I departed from the site at 13:41. |
2785803 | Primary Facility | 2018-10-09 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
The well was in production. There was water .5' below grade in the cellar and there was no bubbling noticed. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same production tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2849692 | Primary Facility | 2019-03-04 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as a routine inspection. As the photo's show, the site is snow covered. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted. |
For data sources see[9]