X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20818

Well Details

Well ID: 37-115-20818
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Dimock Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148993
Farm/Lease Name: P WALDENBERGER 4
License Status:
Spud Date:
Permit Date: 2012-01-05
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.742936
Longitude: -75.966597

For data sources see[1][2][3]

Well History

Date Event
2012-01-05 New Permit Application
2012-06-26 Performed Spud Operation
2012-07-09 Drilling Completion
2012-08-23 Perforation
2012-09-04 Performed Stimulation
2014-02-13 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-09-03 2012-09-03 7,042 4,302,270

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Operator Carrier Water 7732-18-5 100.00 88.94
CI-150 (Corrosion Inhibitor) Fisher Technical Services Inc. (FTSI) Corrosion Inhibitor Organic Amineresin Salt 30.00 0.00027000
Aromatic aldehyde 10.00 0.00009000
N,N-Dimethylformamide 68-12-2 10.00 0.00009000
Isopropanol 67-63-0 60.00 0.00054000
Quaternary ammonium compound 10.00 0.00009000
40/70 White Fisher Technical Services Inc. (FTSI) Proppant Crystalline Silica 100.00 9.86
FE 100L (Iron Chelator) Fisher Technical Services Inc. (FTSI) Iron Control Product Citric acid 77-92-9 55.00 0.00088000
FRW-200 Fisher Technical Services Inc. (FTSI) Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 26.00 0.01
ICI-3240 Fisher Technical Services Inc. (FTSI) Biocide Sodium hydroxide 1310-73-2 4.00 0.00163000
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione 533-74-4 24.00 0.00979000
100 Mesh Fisher Technical Services Inc. (FTSI) Proppant Crystalline Silica 100.00 0.55
Hydrochloric Acid 10.1-15 Fisher Technical Services Inc. (FTSI) Acidizing Water 7732-18-5 85.00 0.00317000
Hydrochloric acid 7647-01-0 15.00 0.07
CS-500 SI Fisher Technical Services Inc. (FTSI) Scale Inhibitor Ethylene glycol 107-21-1 10.00 0.00507000

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-09-04 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 1,865,165.53 179 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 1,795,048.46 362 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 821,248.10 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 834,771.37 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 594,935.47 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 515,757.00 361 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 474,235.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CABOT OIL & GAS CORP Drill Cuttings 1,106.42 Tons LANDFILL NY STATE #32S11
2012 CABOT OIL & GAS CORP Drilling Fluid Waste 770.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Fracing Fluid Waste 7,474.95 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Fracturing Fluid Waste 18.57 Tons LANDFILL THR029
2012 CABOT OIL & GAS CORP Drill Cuttings 129.68 Tons LANDFILL 101247
2012 CABOT OIL & GAS CORP Drill Cuttings 75.04 Tons LANDFILL THR029
2012 CABOT OIL & GAS CORP Drilling Fluid Waste 362.93 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Fracing Fluid Waste 2,034.01 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 1,295.26 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 1,856.94 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 42.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 413.58 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 4.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 253.16 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 144.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 105.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 43.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 1.20 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 248.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 74.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 351.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2078832 Primary Facility 2012-06-18 Routine/Complete Inspection No Violations Noted During the inspection it was noted that the rock construction entrance had been installed and appeared to be maintained per the plan. The channels were lined with the double net coir lining. At the time of the inspection, the channel lining was anchored by placing stones along the top edge. While on site the Department requested that the operator consult the engineer who developed the plan for the proper anchoring technique being that a detail was not found in the E&S plan.T he disturbed areas along the access road have been hydroseeded. High visibility safety fence was noted to have been installed to the east of the well site.
2219343 Primary Facility 2013-10-29 Routine/Complete Inspection Pending Sign at Access Road incorrect. Well in production - no visible bubbling.
2392038 Primary Facility 2015-07-23 Routine/Complete Inspection No Violations Noted
2491154 Primary Facility 2016-06-07 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:40 p.m., the cellar was about three quarter full of water with no bubbling noticed, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 489psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 13:15 p.m.

For data sources see[9]

References