X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20541

Well Details

Well ID: 37-115-20541
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Gibson Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 150333
Farm/Lease Name: DANIELS 1V
License Status:
Spud Date:
Permit Date: 2011-04-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.811983
Longitude: -75.563792

For data sources see[1][2][3]

Well History

Date Event
2011-04-01 New Permit Application
2011-06-04 Performed Spud Operation
2011-08-11 Drilling Completion
2013-08-02 New Permit Application
2013-11-08 Drilling Completion
2013-12-11 Perforation
2014-01-07 Performed Stimulation
2014-05-09 DEVIATED
2014-05-14 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-01-06 2014-01-21 6,870 14,176,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Plexgel 907 L EB Chemplex Viscosifier C-13 N-Alkanes 629-50-5 50 0.000728713 970.357
Petroleum Hydrotreated Light Distillate 64742-47-8 50 0.000728713 970.357
Propylene Pentamer 15220-87-8 50 0.000728713 970.357
Guar Gum 9000-30-0 0 0.00000029 0.388
Organophylic Clay Proprietary 2 0.00002915 38.814
Methyl Alcohol 67-56-1 1 0.00001457 19.407
Alcohol Ethoxylate Proprietary 1 0.00001457 19.407
C-11 N-Alkanes 1120-21-4 50 0.000728713 970.357
C-12 N-Alkanes 1120-40-3 50 0.000728713 970.357
C-14 N-Alkanes 629-59-4 50 0.000728713 970.357
Plexbreak 145 Chemplex Non-Emulsifier Methyl Alcohol 67-56-1 15 0.00013717 182.655
Diethanolamine 111-42-2 3 0.00002743 36.531
2-Butoxyethanol 111-76-2 15 0.00013717 182.655
Cocamide Based Surfactant Proprietary 10 0.00009145 121.77
Hydrochloric Acid (15%) Reagent Acidizing Hydrochloric Acid 7647-01-0 15 0.0764595 101814
Sand (Proppant) TSS Proppant Silica Substrate 14808-60-7 100 10.0078 13,326,500.0
Water Rain for Rent Carrier/Base Fluid Water 7732-18-5 100 89.3312 118,954,000.0
Greenhib 679 Chemplex Friction Reducer Glycerine 56-81-5 20 0.00490621 6533.13
Proprietary Proprietary 35 0.00858588 11433
Ferriplex 40 Chemplex Iron Control Sodium Sulfate Anhydrous 7757-82-6 2 0.00005589 74.421
Sodium Hydroxide 1310-73-2 1 0.00002794 37.21
Trisodium Nitrilotriacetate 5064-31-3 40 0.00111776 1488.41
Plexhib 256 Chemplex Acid Inhibitor Methyl Alcohol 67-56-1 60 0.000491524 654.515
Polyethoxylated Alcohol Surfactant 68951-67-7 30 0.000245762 327.258
Propargyl Alcohol 107-19-7 10 0.00008192 109.086
C-14 to C-16 Alpha Olefins 64743-02-8 5 0.00004096 54.543
Thiourea/Formaldehyde Copolymer 68527-49-1 30 0.000245762 327.258
Plexcide 15G Chemplex Biocide Alkyl Dimethyl Benzyl Ammonium Chloride 68424-85-1 3 0.000700991 933.442
Ethanol 64-17-5 3 0.000700991 933.442
Didecyl Dimethyl Ammonium Chloride 7173-51-5 3 0.000700991 933.442
Glutaraldehyde 111-30-8 14 0.00327129 4356.06
Plexslick 957 Chemplex Friction Reducer Ammonium Chloride 12125-02-9 5 0.00485784 6468.72
Poly (acrylamide-co-acrylic acid), partial sodium salt 62649-23-4 35 0.0340049 45281.1
Paraffinic, Naphtehenic Solvent 64742-47-8 30 0.0291471 38812.3
Nonionic Surfactants Proprietary 1.5 0.00145735 1940.62
Plexgel Breaker HT Chemplex Breaker Ammonium Persulfate 7727-54-0 90 0.000121828 162.227
vinylidene chloride-methyl acrylate copolymer 25038-72-6 20 0.00002707 36.05

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-01-07 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 SOUTHWESTERN ENERGY PROD CO 0.00 0 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 396,082.04 33 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 2,466,232.44 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 1,433,514.71 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 1,001,393.02 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 989,990.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 812,969.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CABOT OIL & GAS CORP Drilling Fluid Waste 1,247.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Drilling Fluid Waste 218.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 450.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 186.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2013 CABOT OIL & GAS CORP Drill Cuttings 725.49 Tons LANDFILL 100933
2014 CABOT OIL & GAS CORP Fracing Fluid Waste 3,171.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Produced Fluid 1,226.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Fracing Fluid Waste 28,403.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 14,973.48 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 83.11 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 33.39 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016 CABOT OIL & GAS CORP Produced Fluid 1,158.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 1,919.86 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 930.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 967.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017 CABOT OIL & GAS CORP Produced Fluid 86.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 218.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Produced Fluid 942.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 500.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 312.45 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 1,298.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1978145 Primary Facility 2011-06-06 Drilling/Alteration No Violations Noted Falcon Rig 16. Drilling on air. Currently shut down. Encountered 300 bbl/hr water source at approx 300 '. At 90' had 6-8 bbls/hr, at 260' had 150 bbls/hr, and 300' had 300 bbls/hr. Shut down to bring in more tanks to handle water capacity. Transporting water offiste to location to be used for fraccing in Bradford County. Inspected site. Secondary containment in place and in good condition. Checked cellar - no bubbling observed. Drillers log on site and up to date.. 20" set at 65' 13 3/8" to be set at 630', and 9 5/8" to be set at 1640'. Drilling to set 9 5/8" and then rigging down. Will bring in big rig to drill out to Onondaga - conservation well.
1979444 Primary Facility 2011-06-08 Routine/Complete Inspection Violation(s) Noted NOV response submitted 7/13/2011. R Klemish had previously entered ACO on 8/27/2013 during data clean-up.
1979646 Primary Facility 2011-06-08 Drilling/Alteration No Violations Noted Falcon Rig 16. Fluid level currently @40' below surface. Currently WOC. Bumped plug at 7:30 am and float held. Will attempt to tag TOC @ 11:30 pm. O-TEX - cement contractor. Operator will call DEP when tag TOC. Checked annulus - 20 x 13 3/8". Could see fluid level. No bubbling observed. Cemented 13 3/8" with Class H - 15.6 wt. with .25 lb/bbl flake. No returns reported. Casing set at 630'. Planning on doing top job to bring cement to surface.
2000311 Primary Facility 2011-08-10 Drilling/Alteration No Violations Noted Falcon 23. Ran Gamma ray, and caliper log on intermediate string. Checked cellar - no evidence of gas at surface. Secondary containment in place. 20 " set at 60'. 13 3/8" set at 630'. 9 5/8" set at 1646. Drillers log on site and up to date. Freshwater reported at 90' = 6-8 bbls/hr. 260' = 150 bbls/hr, 300' = 250 - 300 bbl/hr. First show of gas 4700'.
2023872 Primary Facility 2011-11-22 Administrative/File Review Violation(s) Noted Failure to submit completion report w/in 30 days of completion.
2214652 Primary Facility 2013-10-17 Routine/Complete Inspection No Violations Noted The Department was on site at the Cabot Daniels Well Site to conduct a Preoperational Inspection. The site had formerly been a SWN site and does have a vertical well drilled which also has been transferred over to Cabot and is called the Daniels 1V (115-20541). Cabot has a second well permit issued for this pad, the Daniels E 3 (115-21496). The pad has been expanded from its original configuration to include a tank pad, hence the need for a preoperational inspection. The well pad is 90% complete, and the tank pad is 60% complete. The well pad is located in an exceptional value water shed, an UNT to Tunkhannock Creek. Wash rack is in place. A water truck is on site. All perimeter BMP’s in place. No violations noted.
2231057 Primary Facility 2013-12-18 Drilling/Alteration No Violations Noted
2233382 Primary Facility 2013-12-23 Drilling/Alteration No Violations Noted
2237645 Primary Facility 2014-01-15 Drilling/Alteration No Violations Noted hf 18th 0f 40 stges 100 ' intervals backside pressure 640
2237945 Primary Facility 2014-01-21 Drilling/Alteration No Violations Noted back side pressure +600#
2269669 Primary Facility 2014-05-12 Drilling/Alteration No Violations Noted
2477066 Primary Facility 2016-04-21 Routine/Complete Inspection No Violations Noted
2490226 Primary Facility 2016-06-02 Routine/Complete Inspection No Violations Noted
2544745 Primary Facility 2016-12-14 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a Routine Complete Inspection in response to the submittal of a Restoration Report. The E&S Inspection Checklist indicated that Stephen Opeka conducted the most recent inspection on 12/9/16.

When the Department arrived on site it was noted that it was covered in a significant amount of snow. The Department was unable to verify if the Daniels Well Site met stabilization requirements. The Departments dug two smalls areas to the ground and determined that those areas appeared to meet stabilization requirements, therefore the Department plans to return after the snow melts to conduct a Follow-Up Inspection.

2559727 Primary Facility 2017-02-07 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:35a.m., the cellar was empty. There was cement between the (20x13) casing and the (13x9) casing. The (9x5) annulus vent pipe was open and venting into a small plastic tank. There was 655psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 11:30a.m.

2651522 Primary Facility 2017-10-24 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. All the annuli vent pipes were connected together and going to the same tank. There was no bubbling noticed in the cellar. I took a walk around the location and there were no obvious concerns noticed.

2651772 Primary Facility 2017-10-23 Site Restoration No Violations Noted This inspection was conducted to confirm Cabot's assessment that the project meets the minimum requirements for permanent stabilization. The Department's determination is that the site meets the requirements for permit termination.
2752817 Primary Facility 2018-07-17 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 1' below grade in the cellar and there was no bubbling noticed. The (9x5) annulus vent pipe was going to the a poly vent tank. There was gas detected at the poly vent tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2853288 Primary Facility 2019-03-13 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water and ice 1' below grade in the cellar and there was no bubbling noticed. The (9x5) annulus vent pipe was connected together with the (13x9) and (9x5) annuli vent pipes of the 3H and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 3/4/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1979444 613159 06/08/2011 2011-06-08 102.4INADPLN - E&S Plan not adequate Administrative E&S plan required redline changes to multiple aspects of the plan including siltsock installation, culvert installation and installation of silt sock outside of LOD. NOV response submitted 7/13/2011. R Klemish had previously entered ACO on 8/27/2013 during data clean-up.
1979444 613160 06/08/2011 2011-06-08 102.5NPDES - Failure to obtain an NPDES Permit for Stormwater Discharges Associated With a Construction Activity. Administrative This violation is for a violation of 102.5(C) for failure to obtain ESCGP-1 for an O&G activity with disturbance >5 acres. NOV response submitted 7/13/2011. R Klemish had previously entered ACO on 8/27/2013 during data clean-up.
1979444 613161 06/08/2011 2011-06-08 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Topsoil Piles and Diversion ditch slumping. NOV response submitted 7/13/2011. R Klemish had previously entered ACO on 8/27/2013 during data clean-up.
2023872 626040 11/22/2011 2011-11-22 212WELLRCD - Failure to submit well record within 30 days of completion of drilling Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
613159 272878 NOV - Notice of Violation Administrative Close Out 2013-08-27
613160 272878 NOV - Notice of Violation Administrative Close Out 2013-08-27
613161 272878 NOV - Notice of Violation Administrative Close Out 2013-08-27
626040 278001 NOV - Notice of Violation Administrative Close Out 2012-12-26

For data sources see[9]

References