X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20518

Well Details

Well ID: 37-115-20518
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Forest Lake Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148592
Farm/Lease Name: J HAWLEY 5
License Status:
Spud Date:
Permit Date: 2011-03-03
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.862808
Longitude: -75.964494

For data sources see[1][2][3]

Well History

Date Event
2011-03-03 New Permit Application
2011-06-11 Performed Spud Operation
2011-08-01 Drilling Completion
2011-11-19 Perforation
2011-11-19 Performed Stimulation
2012-06-22 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-11-19 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 280,920.73 341 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 256,325.60 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 151,291.84 359 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 107,501.44 359 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 116,954.60 344 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 158,878.73 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 134,559.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 120,155.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 695.78 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 1.06 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drill Cuttings 190.33 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drill Cuttings 1,021.40 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Drill Cuttings 0.88 Tons LANDFILL 100081
2011 CABOT OIL & GAS CORP Drill Cuttings 49.15 Tons LANDFILL 100945
2012 CABOT OIL & GAS CORP Fracturing Fluid Waste 1.92 Tons LANDFILL 101534
2012 CABOT OIL & GAS CORP Basic Sediment 48.28 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 7,375.24 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Basic Sediment 23.07 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Fracturing Fluid Waste 21.72 Tons LANDFILL 100081
2012 CABOT OIL & GAS CORP Fracing Fluid Waste 6,338.80 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Basic Sediment 7.48 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Produced Fluid 95.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 1,497.01 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 1,789.35 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Produced Fluid 1,620.86 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 18.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 1,173.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 12.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Synthetic Liner Materials 5.32 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Produced Fluid 648.47 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 CABOT OIL & GAS CORP Produced Fluid 770.45 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 326.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 34.33 Bbl REUSE (AT WELL PAD)
2017 CABOT OIL & GAS CORP Produced Fluid 2,785.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 307.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 66.16 Bbl REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 1,659.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 1,188.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 2,701.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 12.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1991583 Primary Facility 2011-07-26 Drilling/Alteration No Violations Noted Just starting to drill out curve on SOBM. 20" set at 101' and cemented. 13 3/8" set at 425' and cemented with 570 sks Swiftchem with 45 bbls returned. 9 5/8" set at 1535' and cemented with 340 sks Swiftchem with 20 bbls returned to surface. Drillers log on site and up to date. Secondary containment in place and in good condition. Water reported at 10' and 90' (small amounts). 97U of gas reported from 4230 - 4270'. All other gas levels were background.
2335267 Primary Facility 2015-01-09 Routine/Complete Inspection No Violations Noted The Department was on site at the Hawley J, Pad 1. to perform a Routine Complete Inspection. The wells on this site are the 2H, 3H, 4H, 5H, 6H and 7H. The Numbers, respectively, are 115-20516, 20515, 20560, 20518, 20561, and 20463. The site's last E&S inspection was on 1-7-2015. The site was adequately vegetated and stable. There were no violations.
2377232 Primary Facility 2015-06-04 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a routine complete inspection of the erosion and sedimentation controls at the J. Hawley well pad (ESX10-115-0061) on June 4, 2015. The wells associated with this pad are as follows:
2407823 Primary Facility 2015-09-17 Routine/Complete Inspection No Violations Noted
2505647 Primary Facility 2016-07-28 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 8:55a.m., the cellar was about three quarters full of water with no bubbling noticed, the (13x9) vent pipe was open and venting into a tank, the (9x5) vent pipe was open and venting into a tank, there was 557psi on the production casing. There was a crew doing remedial work on the lower side of the location, I took a walk around the location and everything looked OK.

I left the site at 9:50a.m.

2549831 Primary Facility 2017-01-05 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a routine complete inspection of the erosion and sedimentation controls for the at the J. Hawley well pad (ESX10-115-0061) on June 4, 2015. The wells associated with this pad are as follows:

5H 115-20518 6H 115-20561 7H 115-20463 2H 115-20516 3H 115-20515 4H 115-20560

The site was in production, and not under any major construction. and the site was very well vegetated (>70%) and graded well. There were no erosion and sedimentation issues on site and the access road was holding up well.


There were no violations

If there are any questions please feel free to contact me at (570)346-5539

2600898 Primary Facility 2017-06-01 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 14:05p.m.

The cellar was about half full of water with no bubbling noticed. The (13x9) annulus vent pipe was open and venting into a small plastic tank, the (9x5) annulus vent pipe was open and venting into a small plastic tank. There was 600psi on the production casing and 485psi on the production line. I took a walk around the location and there were no obvious concerns noticed. I left the site at 14:45p.m.

2648769 Primary Facility 2017-10-18 Routine/Complete Inspection No Violations Noted I inspected the J. Hawley pad for Notice of Termination on October 3, 2017. The site was well constructed and had no apparent erosional problems. The vegetation was at or exceeding 70%.

There were no violations noted.

I recommend APPROVAL of this NOT.

2709560 Primary Facility 2018-03-16 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water and ice 3.5' below grade in the cellar and there was no bubbling noticed. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2710100 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted I inspected the J. Hawley well pad on March 26, 2018. It was sunny and about 38 degrees out. The access road was solid and the pad surface was partly snow covered yet stable. The cut and fill slopes were not steep and were well vegetated. The wells associated with the site are as follows:

115-20515 115-20516 115-20518 115-20560 115-20561 115-20563

There were no apparent erosional issues. There were no violations noted.

2808821 Primary Facility 2018-11-30 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was full of water and there was no bubbling noticed. The (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 11/2/18. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

For data sources see[8]

References