37-115-20517

Well Details

Well ID: 37-115-20517
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Lenox Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 149356
Farm/Lease Name: STALTER 1
License Status:
Spud Date:
Permit Date: 2011-03-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.716867
Longitude: -75.686353

For data sources see[1][2][3]

Well History

Date Event
2011-03-02 New Permit Application
2011-04-07 Performed Spud Operation
2011-06-21 Drilling Completion
2013-01-21 Perforation
2013-01-21 Performed Stimulation
2013-05-23 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-01-15 2013-01-15 7,404 7,067,466

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand, White, 100 mesh Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100.0 0.59331
Ferrotrol 300L Baker Hughes Iron Control Citric Acid 77-92-9 60.0 0.00075
Water Operator Carrier Water 7732-18-5 100.0 88.17603
FRW-18 Baker Hughes Friction Reducer Petroleum Distillates 64742-47-8 30.0 0.02904
CI-14 Baker Hughes Corrosion Inhibitor Fatty Acids Trade Secret 10.0 0.00009000
GBW-15L Baker Hughes Breaker Enzyme solution Trade Secret 100.0 0.00692
GW-3LDF Baker Hughes Gelling Agent 1-Butoxy-2-Propanol 5131-66-8 5.0 0.00282
BF-7L Baker Hughes Buffer Potassium Carbonate 584-08-7 60.0 0.00641
Sand, White, 40/70 Baker Hughes Proppant Crystalline Silica (Quartz) 14808-60-7 100.0 10.38427
Scaletrol 720 Baker Hughes Scale Inhibitor Calcium Chloride 10043-52-4 5.0 0.00076
Enzyme G-NE Baker Hughes Breaker Hemicellulase Enzyme Concentrate 9025-56-3 5.0 0.00029
XLW-32 Baker Hughes Crosslinker Boric Acid (H3BO3) 10043-35-3 30.0 0.00121
HCl, 10.1 - 15 Baker Hughes Acidizing Hydrochloric Acid 7647-01-0 15.0 0.0868
Alpha 1427 Baker Hughes Biocide Didecyl Dimethyl Ammonium Chloride 7173-51-5 10.0 0.00222
Poly (acrylamide-co-acrylic acid) Trade Secret None 0.0290445572
Methanol 67-56-1 None 0.0008678873
Guar Gum 9000-30-0 60.0 0.0338
Water 7732-18-5 85.0 0.49184
Ethanol 64-17-5 5.0 0.00111
Propargyl Alcohol 107-19-7 5.0 0.00004000
Quaternary Ammonium Compound 68424-85-1 5.0 0.00111
Salt Trade Secret None 0.0048407595
Water 7732-18-5 95.0 0.00555
Water 7732-18-5 60.0 0.00641
Ethoxylated Alcohol Trade Secret None 0.0019363038
Potassium Chloride 7447-40-7 None 0.00000759
Sorbitan Monooleate Trade Secret None 0.0048407595
Cyrstalline Silica, Quartz (SiO2) 14808-60-7 5.0 0.00282
Petroleum Distillates 64742-47-8 30.0 0.0169
Paraffinic Petroleum Distillate 64742-55-8 30.0 0.0169
Modified Thiorea Polymer 68527-49-1 None 0.00006075
Glutaraldehyde 111-30-8 30.0 0.00666
Olefin Trade Secret 5.0 0.00004000
Methyl Borate 121-43-7 30.0 0.00121
Hydrochloric Acid 7647-01-0 None 0.00000868
Sodium Chloride 7647-14-5 None 0.00000455
Water 7732-18-5 None 0.069829691
Isotridecanol, ethoxylated 9043-30-5 5.0 0.00282
Ethylene Glycol 107-21-1 30.0 0.00455
Polyoxyalkylenes Trade Secret 30.0 0.00026
Formaldehyde 50-00-0 None 0.00000868
Potassium Hydroxide 1310-58-3 1.0 0.00011
Polyacrylate Trade Secret None 0.0030346916
Methanol 67-56-1 60.0 0.00242
Ingredients shown above are subject
to 29 CFR 1910.1200(i)
and appear on Material
Safety Data Sheets (MSDS). Ingredients shown below are Non-MSDS.
2-Butoxy-1-Propanol 15821-83-7 None 0.00004507

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2013-01-21 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 1,116,002.93 317 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 670,858.00 160 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 1,380,450.78 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 950,320.39 341 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 948,049.08 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 807,325.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 732,590.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 160.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 0.45 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drill Cuttings 746.27 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drill Cuttings 965.73 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 199.00 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Servicing Fluid 54.02 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2012 CABOT OIL & GAS CORP Servicing Fluid 29.78 Bbl LANDFILL 100945
2012 CABOT OIL & GAS CORP Servicing Fluid 14.81 Bbl LANDFILL 101571
2012 CABOT OIL & GAS CORP Servicing Fluid 2,195.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Servicing Fluid 21.96 Bbl LANDFILL 101534
2013 CABOT OIL & GAS CORP Produced Fluid 2,535.94 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 2,526.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 855.36 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Fracing Fluid Waste 7,078.33 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 42.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2014 CABOT OIL & GAS CORP Produced Fluid 625.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 169.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Servicing Fluid 140.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Servicing Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 568.44 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 7.38 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 295.06 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 69.41 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 181.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017 CABOT OIL & GAS CORP Produced Fluid 100.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 148.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 42.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018 CABOT OIL & GAS CORP Produced Fluid 114.93 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 256.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1974983 Primary Facility 2011-05-17 Drilling/Alteration No Violations Noted Drilling depth 2552'. Drilling on air. Drillers log on site and up to date. Secondary containment in good condition. Site ID sign in place with peroper permit #. Drilling to KOP on air and then switching to water-based mud to drill to TD. 20" set at 90'. 13 3/8" set at 448'. 9 5/8" set at 1295'.
1976935 Primary Facility 2011-05-26 Drilling/Alteration No Violations Noted TOH at time of inspection. Spoke with Cabot engineer regarding plan for sealing off water zone encountered at 1495'. Currently waiting to get direction from Cabot. Checked cellar. No bubling observed. Casings set = 20" at 90', 13 3/8" at 448', 9 5/8" at 1295'.
1976944 Primary Facility 2011-05-31 Drilling/Alteration No Violations Noted Pioneer Rig 63. PAcker set at 1630. Added 30' sand on top. Squeezed 0.6 bbl of Type 1 cement. Pressured up to 200 lbs. WOC approximately 5 hours. Drilled out cement and completed fit test with 15 lbs pressure for 15 mins. Fit test indicated good seal. Drilled down to 7923'. Currently generator broke down and no drilling. Operator waiting for replacement generator.
2009313 Primary Facility 2011-10-05 Follow-up Inspection No Violations Noted DEP on site at 11:45. Folow up on status of wells as part of ongoing gas migration investigation. Well is shut it and has not been fracced. Vents are open and vented to poly tank. No bubbling observed in cellar. Fluid level below tops of casing strings. No personnel on site. DEP off site at 11:55.
2059471 Primary Facility 2012-04-13 Follow-up Inspection No Violations Noted No activity on site. Well is not online. 13 x 9" and 9 x 5" annulus vented to small poly tank. Can see gas vapors coming from top of tank. No bubbling observed in cellar. Gauge on production string reads 0 psi.
2074514 Primary Facility 2012-06-06 Drilling/Alteration No Violations Noted Service rig on site. have moved from Stalter 8V to Stalter 1. Ran Radial Bond Log. Currently going in hole with stinger - will pump 500 sks Standard A cement into perforations at 5290 - 5282 (4 spf). Setting cement retainer at 5260'. Company man reported they could not break circulation - think when fraccing 8V - frac'd into Stalter 1 and reason for water loss. So plan is to fill void with this cement squeeze. No violations observed at this time.
2078806 Primary Facility 2012-06-21 Drilling/Alteration No Violations Noted Service rig on site. Drilled cement out. Top of retainer is 5260'. Drilled out of cement at 5434'. Tested casing to 2000lbs for 30 mins - had good test. Drilled bottom retainer set at 5455'. Ran in hole to 7500' to CIBP set at 7390'. Tested casing to CIBP to 2500lbs for 30 mins. Tested good. At time of inspection in process of TOH and then will be running bond log. Pressure on 8V seems to be decreasing.
2106870 Primary Facility 2012-09-25 Follow-up Inspection No Violations Noted On site to perform 72 hr shut in on all annular spaces on all wells. DEP - Steve Watson and Andrea Schmid on site with flow meter. Cabot on site to facilitate collecting data and install pressure recorders on each wells. Readings on Stalter 1H = 13 x 9" - 0 psi with digital gauge, 0 flow with 1/8" plate. 9 x 5" = 0 psi with digital gauge, 0 flow with 1/8" plate.
2106877 Primary Facility 2012-09-28 Follow-up Inspection No Violations Noted On site to complete 72 hour shut test. Started test on 9/25/12. Shut in 13 x 9" and 9 x 5". Cabot installed digital pressure recorders for test. Pressure readings were collected prior to ending test. 13 x 9" annulus showed 1.6 psi, and 9 x 5" annulus showed 43.3 psi. Cabot disconnected recorders and will submit data to DEP. Also collected data from Stalter 2H and 8V.
2113602 Primary Facility 2012-11-06 Routine/Complete Inspection No Violations Noted Preparing to run packer to approx 6572' to pressure test plug previously set at 7390'
2115101 Primary Facility 2012-11-09 Drilling/Alteration No Violations Noted set packer at approx. 6700 ft
2124438 Primary Facility 2012-12-17 Drilling/Alteration No Violations Noted packer hung up during test at 6618
2128080 Primary Facility 2013-01-03 Drilling/Alteration No Violations Noted drilling plugs on 1h with coil tubing6630' patches tested at 9000#
2130298 Primary Facility 2013-01-14 Drilling/Alteration No Violations Noted DEP on site at 12 pm to perform pre-frac inspection. Met with Larry Fulmer - Co. Man on site. Going through checklist from Engineering Study submitted by Cabot (9/24/09). Will monitor 8V and 2H with transducers on both 5 1/2" and 9 x 5" annuli. Went through checklist items under 4.2 Engineering Corrective Measures identifed in Study. All items (A through L) have been instituted. Will be fraccing 1H first and then will frac 2H. Fraccing scheduled to start tomorrow morning around 6 am. At this time no violations observed.
2132592 Primary Facility 2013-01-17 Drilling/Alteration No Violations Noted Currently fraccing well. Just completed Stage 7 this morning. Currently shooting perforations for Stage 8. 20 stages total for this well. Pressures on Backsides = 1H - 144 psi (9x5). 8V - 0 psi (9x5), 2H - 11 psi (9x5). Stage 7 High pressure was 8696 psi. 8910 has been highest recorded at this point throughout frac job.
2135080 Primary Facility 2013-01-24 Drilling/Alteration No Violations Noted Met Mr. Edward lornezo - Co. man on site. Currently rigging up to drill out frac plugs on 1H and 2H. Will flowback as plugs are drilled out. Will not require flaring. Pressures on backside are 0 psi. Secondary containment in place. No violations observed.
2219275 Primary Facility 2013-11-06 Routine/Complete Inspection No Violations Noted no pressure or flow detected
2244816 Primary Facility 2013-12-11 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Wells shut in 6:57AM, opened at 9AM to obtain samples.
2322397 Primary Facility 2014-11-18 Drilling/Alteration No Violations Noted
2443724 Primary Facility 2016-01-07 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2475913 Primary Facility 2016-04-15 Follow-up Inspection Outstanding Violations - No Viols Req'd
2475959 Primary Facility 2016-04-05 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2476102 Primary Facility 2016-04-06 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2476480 Primary Facility 2016-04-13 Follow-up Inspection Outstanding Violations - No Viols Req'd
2498679 Primary Facility 2016-07-05 Site Restoration No Violations Noted On 7/5/16, the Department conducted an inspection of the Cabot Stalter D Pad 1 in response to Cabot’s submittal of a Notice of Termination form for this site. The Department finds that the site is permanently stabilized, and that the record drawings dated 10/15/2010 match the as-built drawings which reflect conditions on the ground as observed by the Department. 3 wells have been drilled on this pad, the 1H (115-20517) and 2H (115-20496) both appear to be in production, while the 8V (115-20457) is not tied into production. There are 3 other wells associated with this well pad, the 3H (115-20506), the 4H (115-20497, and the 6H (115-20522), none of which have been drilled. I recommend this notice of termination be approved.
2516962 Primary Facility 2016-09-06 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2518800 Primary Facility 2016-09-13 Follow-up Inspection Outstanding Violations - No Viols Req'd
2519783 Primary Facility 2016-09-15 Follow-up Inspection Outstanding Violations - No Viols Req'd
2519824 Primary Facility 2016-09-19 Follow-up Inspection Outstanding Violations - No Viols Req'd
2520346 Primary Facility 2016-09-20 Follow-up Inspection Outstanding Violations - No Viols Req'd
2530736 Primary Facility 2016-09-22 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2530750 Primary Facility 2016-09-26 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2530773 Primary Facility 2016-10-13 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2551733 Primary Facility 2017-01-10 Routine/Complete Inspection No Violations Noted
2555139 Primary Facility 2017-01-23 Routine/Complete Inspection In Compliance with Policy

For data sources see[9]