If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20517 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.716867,"lon":-75.686353,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Lenox Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 149356 | |
Farm/Lease Name: STALTER 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-03-02 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.716867 | |
Longitude: -75.686353 |
Date | Event |
---|---|
2011-03-02 | New Permit Application |
2011-04-07 | Performed Spud Operation |
2011-06-21 | Drilling Completion |
2013-01-21 | Perforation |
2013-01-21 | Performed Stimulation |
2013-05-23 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-01-15 | 2013-01-15 | 7,404 | 7,067,466 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand, White, 100 mesh | Baker Hughes | Proppant | Crystalline Silica (Quartz) | 14808-60-7 | 100.0 | 0.59331 | |
Ferrotrol 300L | Baker Hughes | Iron Control | Citric Acid | 77-92-9 | 60.0 | 0.00075 | ||
Water | Operator | Carrier | Water | 7732-18-5 | 100.0 | 88.17603 | ||
FRW-18 | Baker Hughes | Friction Reducer | Petroleum Distillates | 64742-47-8 | 30.0 | 0.02904 | ||
CI-14 | Baker Hughes | Corrosion Inhibitor | Fatty Acids | Trade Secret | 10.0 | 0.00009000 | ||
GBW-15L | Baker Hughes | Breaker | Enzyme solution | Trade Secret | 100.0 | 0.00692 | ||
GW-3LDF | Baker Hughes | Gelling Agent | 1-Butoxy-2-Propanol | 5131-66-8 | 5.0 | 0.00282 | ||
BF-7L | Baker Hughes | Buffer | Potassium Carbonate | 584-08-7 | 60.0 | 0.00641 | ||
Sand, White, 40/70 | Baker Hughes | Proppant | Crystalline Silica (Quartz) | 14808-60-7 | 100.0 | 10.38427 | ||
Scaletrol 720 | Baker Hughes | Scale Inhibitor | Calcium Chloride | 10043-52-4 | 5.0 | 0.00076 | ||
Enzyme G-NE | Baker Hughes | Breaker | Hemicellulase Enzyme Concentrate | 9025-56-3 | 5.0 | 0.00029 | ||
XLW-32 | Baker Hughes | Crosslinker | Boric Acid (H3BO3) | 10043-35-3 | 30.0 | 0.00121 | ||
HCl, 10.1 - 15 | Baker Hughes | Acidizing | Hydrochloric Acid | 7647-01-0 | 15.0 | 0.0868 | ||
Alpha 1427 | Baker Hughes | Biocide | Didecyl Dimethyl Ammonium Chloride | 7173-51-5 | 10.0 | 0.00222 | ||
Poly (acrylamide-co-acrylic acid) | Trade Secret | None | 0.0290445572 | |||||
Methanol | 67-56-1 | None | 0.0008678873 | |||||
Guar Gum | 9000-30-0 | 60.0 | 0.0338 | |||||
Water | 7732-18-5 | 85.0 | 0.49184 | |||||
Ethanol | 64-17-5 | 5.0 | 0.00111 | |||||
Propargyl Alcohol | 107-19-7 | 5.0 | 0.00004000 | |||||
Quaternary Ammonium Compound | 68424-85-1 | 5.0 | 0.00111 | |||||
Salt | Trade Secret | None | 0.0048407595 | |||||
Water | 7732-18-5 | 95.0 | 0.00555 | |||||
Water | 7732-18-5 | 60.0 | 0.00641 | |||||
Ethoxylated Alcohol | Trade Secret | None | 0.0019363038 | |||||
Potassium Chloride | 7447-40-7 | None | 0.00000759 | |||||
Sorbitan Monooleate | Trade Secret | None | 0.0048407595 | |||||
Cyrstalline Silica, Quartz (SiO2) | 14808-60-7 | 5.0 | 0.00282 | |||||
Petroleum Distillates | 64742-47-8 | 30.0 | 0.0169 | |||||
Paraffinic Petroleum Distillate | 64742-55-8 | 30.0 | 0.0169 | |||||
Modified Thiorea Polymer | 68527-49-1 | None | 0.00006075 | |||||
Glutaraldehyde | 111-30-8 | 30.0 | 0.00666 | |||||
Olefin | Trade Secret | 5.0 | 0.00004000 | |||||
Methyl Borate | 121-43-7 | 30.0 | 0.00121 | |||||
Hydrochloric Acid | 7647-01-0 | None | 0.00000868 | |||||
Sodium Chloride | 7647-14-5 | None | 0.00000455 | |||||
Water | 7732-18-5 | None | 0.069829691 | |||||
Isotridecanol, ethoxylated | 9043-30-5 | 5.0 | 0.00282 | |||||
Ethylene Glycol | 107-21-1 | 30.0 | 0.00455 | |||||
Polyoxyalkylenes | Trade Secret | 30.0 | 0.00026 | |||||
Formaldehyde | 50-00-0 | None | 0.00000868 | |||||
Potassium Hydroxide | 1310-58-3 | 1.0 | 0.00011 | |||||
Polyacrylate | Trade Secret | None | 0.0030346916 | |||||
Methanol | 67-56-1 | 60.0 | 0.00242 | |||||
Ingredients shown above are subject to 29 CFR 1910.1200(i) and appear on Material Safety Data Sheets (MSDS). Ingredients shown below are Non-MSDS. |
2-Butoxy-1-Propanol | 15821-83-7 | None | 0.00004507 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-01-21 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 1,116,002.93 | 317 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 670,858.00 | 160 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 1,380,450.78 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 950,320.39 | 341 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 948,049.08 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 807,325.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 732,590.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 160.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.45 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 746.27 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 965.73 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 199.00 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Servicing Fluid | 54.02 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2012 | CABOT OIL & GAS CORP | Servicing Fluid | 29.78 Bbl | LANDFILL | 100945 |
2012 | CABOT OIL & GAS CORP | Servicing Fluid | 14.81 Bbl | LANDFILL | 101571 |
2012 | CABOT OIL & GAS CORP | Servicing Fluid | 2,195.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Servicing Fluid | 21.96 Bbl | LANDFILL | 101534 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 2,535.94 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 2,526.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 855.36 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 7,078.33 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 42.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 625.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 169.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2014 | CABOT OIL & GAS CORP | Servicing Fluid | 140.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Servicing Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 568.44 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 7.38 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 295.06 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 69.41 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 181.22 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 100.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 148.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 42.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 114.93 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 256.07 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1974983 | Primary Facility | 2011-05-17 | Drilling/Alteration | No Violations Noted | Drilling depth 2552'. Drilling on air. Drillers log on site and up to date. Secondary containment in good condition. Site ID sign in place with peroper permit #. Drilling to KOP on air and then switching to water-based mud to drill to TD. 20" set at 90'. 13 3/8" set at 448'. 9 5/8" set at 1295'. |
1976935 | Primary Facility | 2011-05-26 | Drilling/Alteration | No Violations Noted | TOH at time of inspection. Spoke with Cabot engineer regarding plan for sealing off water zone encountered at 1495'. Currently waiting to get direction from Cabot. Checked cellar. No bubling observed. Casings set = 20" at 90', 13 3/8" at 448', 9 5/8" at 1295'. |
1976944 | Primary Facility | 2011-05-31 | Drilling/Alteration | No Violations Noted | Pioneer Rig 63. PAcker set at 1630. Added 30' sand on top. Squeezed 0.6 bbl of Type 1 cement. Pressured up to 200 lbs. WOC approximately 5 hours. Drilled out cement and completed fit test with 15 lbs pressure for 15 mins. Fit test indicated good seal. Drilled down to 7923'. Currently generator broke down and no drilling. Operator waiting for replacement generator. |
2009313 | Primary Facility | 2011-10-05 | Follow-up Inspection | No Violations Noted | DEP on site at 11:45. Folow up on status of wells as part of ongoing gas migration investigation. Well is shut it and has not been fracced. Vents are open and vented to poly tank. No bubbling observed in cellar. Fluid level below tops of casing strings. No personnel on site. DEP off site at 11:55. |
2059471 | Primary Facility | 2012-04-13 | Follow-up Inspection | No Violations Noted | No activity on site. Well is not online. 13 x 9" and 9 x 5" annulus vented to small poly tank. Can see gas vapors coming from top of tank. No bubbling observed in cellar. Gauge on production string reads 0 psi. |
2074514 | Primary Facility | 2012-06-06 | Drilling/Alteration | No Violations Noted | Service rig on site. have moved from Stalter 8V to Stalter 1. Ran Radial Bond Log. Currently going in hole with stinger - will pump 500 sks Standard A cement into perforations at 5290 - 5282 (4 spf). Setting cement retainer at 5260'. Company man reported they could not break circulation - think when fraccing 8V - frac'd into Stalter 1 and reason for water loss. So plan is to fill void with this cement squeeze. No violations observed at this time. |
2078806 | Primary Facility | 2012-06-21 | Drilling/Alteration | No Violations Noted | Service rig on site. Drilled cement out. Top of retainer is 5260'. Drilled out of cement at 5434'. Tested casing to 2000lbs for 30 mins - had good test. Drilled bottom retainer set at 5455'. Ran in hole to 7500' to CIBP set at 7390'. Tested casing to CIBP to 2500lbs for 30 mins. Tested good. At time of inspection in process of TOH and then will be running bond log. Pressure on 8V seems to be decreasing. |
2106870 | Primary Facility | 2012-09-25 | Follow-up Inspection | No Violations Noted | On site to perform 72 hr shut in on all annular spaces on all wells. DEP - Steve Watson and Andrea Schmid on site with flow meter. Cabot on site to facilitate collecting data and install pressure recorders on each wells. Readings on Stalter 1H = 13 x 9" - 0 psi with digital gauge, 0 flow with 1/8" plate. 9 x 5" = 0 psi with digital gauge, 0 flow with 1/8" plate. |
2106877 | Primary Facility | 2012-09-28 | Follow-up Inspection | No Violations Noted | On site to complete 72 hour shut test. Started test on 9/25/12. Shut in 13 x 9" and 9 x 5". Cabot installed digital pressure recorders for test. Pressure readings were collected prior to ending test. 13 x 9" annulus showed 1.6 psi, and 9 x 5" annulus showed 43.3 psi. Cabot disconnected recorders and will submit data to DEP. Also collected data from Stalter 2H and 8V. |
2113602 | Primary Facility | 2012-11-06 | Routine/Complete Inspection | No Violations Noted | Preparing to run packer to approx 6572' to pressure test plug previously set at 7390' |
2115101 | Primary Facility | 2012-11-09 | Drilling/Alteration | No Violations Noted | set packer at approx. 6700 ft |
2124438 | Primary Facility | 2012-12-17 | Drilling/Alteration | No Violations Noted | packer hung up during test at 6618 |
2128080 | Primary Facility | 2013-01-03 | Drilling/Alteration | No Violations Noted | drilling plugs on 1h with coil tubing6630' patches tested at 9000# |
2130298 | Primary Facility | 2013-01-14 | Drilling/Alteration | No Violations Noted | DEP on site at 12 pm to perform pre-frac inspection. Met with Larry Fulmer - Co. Man on site. Going through checklist from Engineering Study submitted by Cabot (9/24/09). Will monitor 8V and 2H with transducers on both 5 1/2" and 9 x 5" annuli. Went through checklist items under 4.2 Engineering Corrective Measures identifed in Study. All items (A through L) have been instituted. Will be fraccing 1H first and then will frac 2H. Fraccing scheduled to start tomorrow morning around 6 am. At this time no violations observed. |
2132592 | Primary Facility | 2013-01-17 | Drilling/Alteration | No Violations Noted | Currently fraccing well. Just completed Stage 7 this morning. Currently shooting perforations for Stage 8. 20 stages total for this well. Pressures on Backsides = 1H - 144 psi (9x5). 8V - 0 psi (9x5), 2H - 11 psi (9x5). Stage 7 High pressure was 8696 psi. 8910 has been highest recorded at this point throughout frac job. |
2135080 | Primary Facility | 2013-01-24 | Drilling/Alteration | No Violations Noted | Met Mr. Edward lornezo - Co. man on site. Currently rigging up to drill out frac plugs on 1H and 2H. Will flowback as plugs are drilled out. Will not require flaring. Pressures on backside are 0 psi. Secondary containment in place. No violations observed. |
2219275 | Primary Facility | 2013-11-06 | Routine/Complete Inspection | No Violations Noted | no pressure or flow detected |
2244816 | Primary Facility | 2013-12-11 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Wells shut in 6:57AM, opened at 9AM to obtain samples. |
2322397 | Primary Facility | 2014-11-18 | Drilling/Alteration | No Violations Noted | |
2443724 | Primary Facility | 2016-01-07 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2475913 | Primary Facility | 2016-04-15 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2475959 | Primary Facility | 2016-04-05 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2476102 | Primary Facility | 2016-04-06 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2476480 | Primary Facility | 2016-04-13 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2498679 | Primary Facility | 2016-07-05 | Site Restoration | No Violations Noted | On 7/5/16, the Department conducted an inspection of the Cabot Stalter D Pad 1 in response to Cabot’s submittal of a Notice of Termination form for this site. The Department finds that the site is permanently stabilized, and that the record drawings dated 10/15/2010 match the as-built drawings which reflect conditions on the ground as observed by the Department. 3 wells have been drilled on this pad, the 1H (115-20517) and 2H (115-20496) both appear to be in production, while the 8V (115-20457) is not tied into production. There are 3 other wells associated with this well pad, the 3H (115-20506), the 4H (115-20497, and the 6H (115-20522), none of which have been drilled. I recommend this notice of termination be approved. |
2516962 | Primary Facility | 2016-09-06 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2518800 | Primary Facility | 2016-09-13 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2519783 | Primary Facility | 2016-09-15 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2519824 | Primary Facility | 2016-09-19 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2520346 | Primary Facility | 2016-09-20 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2530736 | Primary Facility | 2016-09-22 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2530750 | Primary Facility | 2016-09-26 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2530773 | Primary Facility | 2016-10-13 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2551733 | Primary Facility | 2017-01-10 | Routine/Complete Inspection | No Violations Noted | |
2555139 | Primary Facility | 2017-01-23 | Routine/Complete Inspection | In Compliance with Policy |
For data sources see[9]