X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20478

Well Details

Well ID: 37-115-20478
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Springville Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 147743
Farm/Lease Name: AUGUSTINE 4
License Status:
Spud Date:
Permit Date: 2011-01-03
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.688617
Longitude: -75.922039

For data sources see[1][2][3]

Well History

Date Event
2011-01-03 New Permit Application
2011-08-03 Performed Spud Operation
2012-08-31 New Permit Application
2012-09-16 Drilling Completion
2012-10-06 Perforation
2012-10-28 Performed Stimulation
2014-02-13 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-10-27 2012-10-27 7,459 4,388,118

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Alpha 1427 Baker Hughes Biocide Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.00 0.00113000
Ethanol 64-17-5 5.00 0.00113000
Glutaraldehyde 111-30-8 30.00 0.00678000
Didecyl dimethyl ammonium chloride 7173-51-5 10.00 0.00226000
FRW-18 Baker Hughes Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
CI-14 Baker Hughes Corrosion Inhibitor Polyoxyalkylenes 30.00 0.00027000
Propargyl alcohol 107-19-7 5.00 0.00005000
Olefin 5.00 0.00005000
Fatty Acids 10.00 0.00009000
Ferrotrol 300L Baker Hughes Iron Control Citric acid 77-92-9 60.00 0.00078000
Scaletrol 720 Baker Hughes Scale Inhibitor Calcium chloride 10043-52-4 5.00 0.00076000
Ethylene glycol 107-21-1 30.00 0.00458000
Hydrochloric Acid 10.1-15 Baker Hughes Acidizing Hydrochloric acid 7647-01-0 15.00 0.09
Water 7732-18-5 85.00 0.51
Water Operator Carrier Water 7732-18-5 100.00 87.36
Clay Master-5C Baker Hughes Clay Control 1,2-Ethanediaminium, N, N'-bis[2-[bis(2-hydroxyethyl)methylammonio]ethyl]-N,N'bis(2-hydroxyethyl)-N,N'-dimethyl-,tetrachlorid
e
138879-94-4 60.00 0.00037000
Sand, White, 100 mesh Baker Hughes Proppant Quartz 14808-60-7 100.00 0.61
Sand, White, 40/70 Baker Hughes Proppant Quartz 14808-60-7 100.00 11.31

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-10-28 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 757,027.32 61 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 2,395,594.46 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 1,194,374.30 361 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 601,591.28 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 768,427.24 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 539,520.87 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 205,546.00 170 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 569,897.00 345 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CABOT OIL & GAS CORP Drilling Fluid Waste 70.62 Bbl LANDFILL NY STATE #32S11
2012 CABOT OIL & GAS CORP Drilling Fluid Waste 3,520.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Basic Sediment 9.90 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Drill Cuttings 734.27 Tons LANDFILL 301626
2012 CABOT OIL & GAS CORP Fracing Fluid Waste 8,648.37 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Fracturing Fluid Waste 15.49 Tons LANDFILL THR029
2012 CABOT OIL & GAS CORP Produced Fluid 1,210.41 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Drilling Fluid Waste 1,335.89 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Fracing Fluid Waste 2,422.76 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 1,201.69 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 310.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 581.76 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 353.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 8.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Synthetic Liner Materials 0.64 Tons LANDFILL 101247
2016 CABOT OIL & GAS CORP Produced Fluid 217.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 194.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 195.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 7.95 Tons REUSE (AT WELL PAD)
2017 CABOT OIL & GAS CORP Produced Fluid 137.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 77.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Waste Water Treatment Sludge 1.19 Tons REUSE (AT WELL PAD)
2018 CABOT OIL & GAS CORP Produced Fluid 47.73 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Synthetic Liner Materials 0.29 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 424.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 0.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1990349 Primary Facility 2011-07-22 Routine/Complete Inspection No Violations Noted
2007058 Primary Facility 2011-08-23 Routine/Complete Inspection No Violations Noted
2007208 Primary Facility 2011-08-29 Routine/Complete Inspection No Violations Noted
2007243 Primary Facility 2011-08-25 Routine/Complete Inspection No Violations Noted
2095395 Primary Facility 2012-08-27 Drilling/Alteration No Violations Noted check on flow back pressure on failed casing, no pressure on 5-1/2x95/8 annulus flowing at3-4 barrells an hour
2095398 Primary Facility 2012-08-28 Drilling/Alteration No Violations Noted split of 4" at 5614' remidiation in progress patch shows integrity.
2097119 Primary Facility 2012-09-04 Drilling/Alteration No Violations Noted Kevin Costello on site. Operator notified DEP of cementing issue on 9 5/8". While pumping cement well locked up with aproximately 400 bbls away. Plug did not latch. Cabot not satisfied with TOC and cement returns. Operator ran two (2) CBL's after initial cement job. Based on bond logs decided to perf and squeeze cement. Set a plug at 1870'. Perforated 1849 - 1852'. Cement retainer set at 1806'. Pumped 10 bbls into perforations and waited 24 hrs on cement. Reportedly no gas in casing at time of inspection. DEP will follow up on remedial work. No violations at this time.
2099649 Primary Facility 2012-09-06 Drilling/Alteration No Violations Noted Perk Mcdowall - Co. Man. Patterson 538. When ran csing - circulated 5 - 6 bottoms up. Didnt see any junk coming to surface at that time. Casing ran in hole with no issues. Killed gas with 10 lb mud and that was last time observed any gas show. During cement job - cement locked up with 56 bbls left to pump. When cleaned stack - saw 1 bbl cement. Preparing to run casing test no. As of 17:30 on 9/5/12 - had 12 psi on 9 x 13" annulus. Checked gauge while on site. 300 lb gauge read 0 psi. Will monitor while performing casing test. 12:30 - 13:00 ran casing test. 1000lb for 30 mins. Chart showed good consistent pressure with no deflections in graph. Monitored gauge on 9 x 13" during test - gauge read 0 psi throughout test. Operator planning to run CBL. Pending results of CBL will determine if ok to drill ahead. No violations observed at this time.
2099708 Primary Facility 2012-09-13 Drilling/Alteration No Violations Noted Patterson 538. Drilling ahead. Should TD today and run casing and cement in next 24 - 48 hrs. TD'd hole while on site at 9837'. Checked cellar. Bull plug on 9 5/8" annulus. Requested Co. Man to install gauge on annulus to check for pressure build up prior to running 5 1/2". Please report results to DEP.
2542989 Primary Facility 2016-12-08 Site Restoration No Violations Noted
2743167 Primary Facility 2018-06-18 Routine/Complete Inspection No Violations Noted This well is in production. Personnel were applying temporary stabilization BMPs to the disturbed areas during the inspection. There were no violations noted. If you have any questions, please contact me.
2757354 Primary Facility 2018-07-11 Drilling/Alteration No Violations Noted At time of inspection arrived on location at 15:30. (4) new 20" conductors, 16" mouse-holes and CellarTech units have been set on pad. Liner and drilling mats have been placed on location in preparation for future drilling activities. (4) new annular vent tanks have been placed at edge of pad with annular vents plumbed from cellars to tanks for all (4) new wells on pad.

- There are also (2) existing wells on pad, the 3H and 4H. Both these wells have been temporarily shut in with night caps installed. Both wells had (2) annular vents, the (13 3/8"x 9 5/8") and (9 5/8"x 5 1/2") vents plumbed to individual vent tanks for each well. Gas checks performed at vent tank openings showed: Tank #1 = 100% LEL, 60% CH4; Tank #2 = 100% LEL, 7% CH4. Well heads were covered with protective steel plates limiting access at time of inspection. No markings were noted on these wells vent tanks to indicate which well was which. Gas checks performed 3' away from vent tanks showed 0% LEL, 0% CH4. Since no health and safety concer

2758412 Primary Facility 2018-07-24 Drilling/Alteration No Violations Noted I arrived at the site at 12:49. The weather conditions are cloudy skies, breezy and humid with rain showers and temperatures in the low to mid 70's as I arrived to the site. The rain had stopped shortly after I arrived. Precision Drilling Rig Super Single # 181 is on the location. The current drilling depth is (666) feet. I met with Will Dean, site company man, consultant of Cabot Oil and Gas and Frank Estes of Cabot Oil and Gas out of the Pittsburgh Office. Mr. Dean provided me with the following details in reference to site activities. "The rig mobilized to the site on July 19th. We are currently drilling the 9H well. The surface casing section of this well will be cemented between (720-800) feet. Thus far, the surface casing on the 11H and 13H wells has been cemented. The next well to be drilled with the surface casing cemented will be the 5H. The 3H and 4H were in production, but are currently shut in. The production fluid storage tanks have been removed from the location. Nabors Rig X 36 will dr
2807101 Primary Facility 2018-10-16 Routine/Complete Inspection No Violations Noted Jon Sassi (EPS) and I arrived on site at 1304 to conduct a FUI inspection on behalf of the Department.

Upon our arrival, we spoke with Brian Kudrick (EHS Consultant - Cabot) who directed us to the location of the release and accompanied us until his colleagues arrived. Roughly 10 minutes after beginning our inspection Steve Watson, Brody Webster, and Steve Catalfamo (all of whom were representing Cabot) arrived on site.

During our discussion with Cabot, they informed us that the liner used for drilling and well stimulation operations is 40 mil thickness layered in a felt-liner-felt arrangement as seen in photo #4. They informed us that Cabot's SOP is to inspect the liner between drilling and fracing and make any repairs as needed. They then remove any contaminants and lay it back down if it is deemed suitable for reuse. According to the aforementioned Cabot representatives we spoke with on site, 2 roll off dumpsters of material have been excavated so far containing 30 yards each.

According to Cabot, the s

2808659 Primary Facility 2018-11-21 Incident- Response to Accident or Event No Violations Noted I arrived at the site at 11:05 in response to a reported spill incident of (10) gallons of diesel fuel. The weather conditions are cloudy skies, breezy and chilly with snow flurries, and temperatures in the low 30's. Steve Watson, Environmental Health and Safety Specialist, and Herb Swiney, completions consultant, both of Cabot Oil and Gas were at the site during the inspection. Keane is the Cabot subcontractor at the site conducting hydraulic fracturing (stimulation) operations for the B Augustine 5H, 9H, 11H and 13H wells. Cabot submitted stimulation notices to the Department on 10/24/18. The comments in the notices indicate that frac operations would begin at 8 AM on 10/25/18. Frac operations are temporarily suspended today, 11/21/18, due to the Thanksgiving holiday according to Mr. Watson. Operations will resume on 11/23/18, Mr. Watson indicated. The 3H and 4H wells are the existing wells on the pad. These wells are currently shut in. The production equipment associated with these wells has been