If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20478 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.688617,"lon":-75.922039,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 147743 | |
Farm/Lease Name: AUGUSTINE 4 | |
License Status: | |
Spud Date: | |
Permit Date: 2011-01-03 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.688617 | |
Longitude: -75.922039 |
Date | Event |
---|---|
2011-01-03 | New Permit Application |
2011-08-03 | Performed Spud Operation |
2012-08-31 | New Permit Application |
2012-09-16 | Drilling Completion |
2012-10-06 | Perforation |
2012-10-28 | Performed Stimulation |
2014-02-13 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-10-27 | 2012-10-27 | 7,459 | 4,388,118 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Alpha 1427 | Baker Hughes | Biocide | Quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.00 | 0.00113000 | |
Ethanol | 64-17-5 | 5.00 | 0.00113000 | |||||
Glutaraldehyde | 111-30-8 | 30.00 | 0.00678000 | |||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 10.00 | 0.00226000 | |||||
FRW-18 | Baker Hughes | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.01 | ||
CI-14 | Baker Hughes | Corrosion Inhibitor | Polyoxyalkylenes | 30.00 | 0.00027000 | |||
Propargyl alcohol | 107-19-7 | 5.00 | 0.00005000 | |||||
Olefin | 5.00 | 0.00005000 | ||||||
Fatty Acids | 10.00 | 0.00009000 | ||||||
Ferrotrol 300L | Baker Hughes | Iron Control | Citric acid | 77-92-9 | 60.00 | 0.00078000 | ||
Scaletrol 720 | Baker Hughes | Scale Inhibitor | Calcium chloride | 10043-52-4 | 5.00 | 0.00076000 | ||
Ethylene glycol | 107-21-1 | 30.00 | 0.00458000 | |||||
Hydrochloric Acid 10.1-15 | Baker Hughes | Acidizing | Hydrochloric acid | 7647-01-0 | 15.00 | 0.09 | ||
Water | 7732-18-5 | 85.00 | 0.51 | |||||
Water | Operator | Carrier | Water | 7732-18-5 | 100.00 | 87.36 | ||
Clay Master-5C | Baker Hughes | Clay Control | 1,2-Ethanediaminium, N, N'-bis[2-[bis(2-hydroxyethyl)methylammonio]ethyl]-N,N'bis(2-hydroxyethyl)-N,N'-dimethyl-,tetrachlorid e |
138879-94-4 | 60.00 | 0.00037000 | ||
Sand, White, 100 mesh | Baker Hughes | Proppant | Quartz | 14808-60-7 | 100.00 | 0.61 | ||
Sand, White, 40/70 | Baker Hughes | Proppant | Quartz | 14808-60-7 | 100.00 | 11.31 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-10-28 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 757,027.32 | 61 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 2,395,594.46 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,194,374.30 | 361 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 601,591.28 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 768,427.24 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 539,520.87 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 205,546.00 | 170 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 569,897.00 | 345 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 70.62 Bbl | LANDFILL | NY STATE #32S11 |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 3,520.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 9.90 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Drill Cuttings | 734.27 Tons | LANDFILL | 301626 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 8,648.37 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 15.49 Tons | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 1,210.41 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,335.89 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 2,422.76 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 1,201.69 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 310.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 581.76 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 353.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 8.25 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 0.64 Tons | LANDFILL | 101247 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 217.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 194.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 195.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 7.95 Tons | REUSE (AT WELL PAD) | |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 137.40 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 77.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 1.19 Tons | REUSE (AT WELL PAD) | |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 47.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 0.29 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 424.54 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 0.98 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1990349 | Primary Facility | 2011-07-22 | Routine/Complete Inspection | No Violations Noted | |
2007058 | Primary Facility | 2011-08-23 | Routine/Complete Inspection | No Violations Noted | |
2007208 | Primary Facility | 2011-08-29 | Routine/Complete Inspection | No Violations Noted | |
2007243 | Primary Facility | 2011-08-25 | Routine/Complete Inspection | No Violations Noted | |
2095395 | Primary Facility | 2012-08-27 | Drilling/Alteration | No Violations Noted | check on flow back pressure on failed casing, no pressure on 5-1/2x95/8 annulus flowing at3-4 barrells an hour |
2095398 | Primary Facility | 2012-08-28 | Drilling/Alteration | No Violations Noted | split of 4" at 5614' remidiation in progress patch shows integrity. |
2097119 | Primary Facility | 2012-09-04 | Drilling/Alteration | No Violations Noted | Kevin Costello on site. Operator notified DEP of cementing issue on 9 5/8". While pumping cement well locked up with aproximately 400 bbls away. Plug did not latch. Cabot not satisfied with TOC and cement returns. Operator ran two (2) CBL's after initial cement job. Based on bond logs decided to perf and squeeze cement. Set a plug at 1870'. Perforated 1849 - 1852'. Cement retainer set at 1806'. Pumped 10 bbls into perforations and waited 24 hrs on cement. Reportedly no gas in casing at time of inspection. DEP will follow up on remedial work. No violations at this time. |
2099649 | Primary Facility | 2012-09-06 | Drilling/Alteration | No Violations Noted | Perk Mcdowall - Co. Man. Patterson 538. When ran csing - circulated 5 - 6 bottoms up. Didnt see any junk coming to surface at that time. Casing ran in hole with no issues. Killed gas with 10 lb mud and that was last time observed any gas show. During cement job - cement locked up with 56 bbls left to pump. When cleaned stack - saw 1 bbl cement. Preparing to run casing test no. As of 17:30 on 9/5/12 - had 12 psi on 9 x 13" annulus. Checked gauge while on site. 300 lb gauge read 0 psi. Will monitor while performing casing test. 12:30 - 13:00 ran casing test. 1000lb for 30 mins. Chart showed good consistent pressure with no deflections in graph. Monitored gauge on 9 x 13" during test - gauge read 0 psi throughout test. Operator planning to run CBL. Pending results of CBL will determine if ok to drill ahead. No violations observed at this time. |
2099708 | Primary Facility | 2012-09-13 | Drilling/Alteration | No Violations Noted | Patterson 538. Drilling ahead. Should TD today and run casing and cement in next 24 - 48 hrs. TD'd hole while on site at 9837'. Checked cellar. Bull plug on 9 5/8" annulus. Requested Co. Man to install gauge on annulus to check for pressure build up prior to running 5 1/2". Please report results to DEP. |
2542989 | Primary Facility | 2016-12-08 | Site Restoration | No Violations Noted | |
2743167 | Primary Facility | 2018-06-18 | Routine/Complete Inspection | No Violations Noted | This well is in production. Personnel were applying temporary stabilization BMPs to the disturbed areas during the inspection. There were no violations noted. If you have any questions, please contact me. |
2757354 | Primary Facility | 2018-07-11 | Drilling/Alteration | No Violations Noted | At time of inspection arrived on location at 15:30. (4) new 20" conductors, 16" mouse-holes and CellarTech units have been set on pad. Liner and drilling mats have been placed on location in preparation for future drilling activities. (4) new annular vent tanks have been placed at edge of pad with annular vents plumbed from cellars to tanks for all (4) new wells on pad.
- There are also (2) existing wells on pad, the 3H and 4H. Both these wells have been temporarily shut in with night caps installed. Both wells had (2) annular vents, the (13 3/8"x 9 5/8") and (9 5/8"x 5 1/2") vents plumbed to individual vent tanks for each well. Gas checks performed at vent tank openings showed: Tank #1 = 100% LEL, 60% CH4; Tank #2 = 100% LEL, 7% CH4. Well heads were covered with protective steel plates limiting access at time of inspection. No markings were noted on these wells vent tanks to indicate which well was which. Gas checks performed 3' away from vent tanks showed 0% LEL, 0% CH4. Since no health and safety concer |
2758412 | Primary Facility | 2018-07-24 | Drilling/Alteration | No Violations Noted | I arrived at the site at 12:49. The weather conditions are cloudy skies, breezy and humid with rain showers and temperatures in the low to mid 70's as I arrived to the site. The rain had stopped shortly after I arrived. Precision Drilling Rig Super Single # 181 is on the location. The current drilling depth is (666) feet. I met with Will Dean, site company man, consultant of Cabot Oil and Gas and Frank Estes of Cabot Oil and Gas out of the Pittsburgh Office. Mr. Dean provided me with the following details in reference to site activities. "The rig mobilized to the site on July 19th. We are currently drilling the 9H well. The surface casing section of this well will be cemented between (720-800) feet. Thus far, the surface casing on the 11H and 13H wells has been cemented. The next well to be drilled with the surface casing cemented will be the 5H. The 3H and 4H were in production, but are currently shut in. The production fluid storage tanks have been removed from the location. Nabors Rig X 36 will dr |
2807101 | Primary Facility | 2018-10-16 | Routine/Complete Inspection | No Violations Noted | Jon Sassi (EPS) and I arrived on site at 1304 to conduct a FUI inspection on behalf of the Department.
Upon our arrival, we spoke with Brian Kudrick (EHS Consultant - Cabot) who directed us to the location of the release and accompanied us until his colleagues arrived. Roughly 10 minutes after beginning our inspection Steve Watson, Brody Webster, and Steve Catalfamo (all of whom were representing Cabot) arrived on site. During our discussion with Cabot, they informed us that the liner used for drilling and well stimulation operations is 40 mil thickness layered in a felt-liner-felt arrangement as seen in photo #4. They informed us that Cabot's SOP is to inspect the liner between drilling and fracing and make any repairs as needed. They then remove any contaminants and lay it back down if it is deemed suitable for reuse. According to the aforementioned Cabot representatives we spoke with on site, 2 roll off dumpsters of material have been excavated so far containing 30 yards each. According to Cabot, the s |
2808659 | Primary Facility | 2018-11-21 | Incident- Response to Accident or Event | No Violations Noted | I arrived at the site at 11:05 in response to a reported spill incident of (10) gallons of diesel fuel. The weather conditions are cloudy skies, breezy and chilly with snow flurries, and temperatures in the low 30's. Steve Watson, Environmental Health and Safety Specialist, and Herb Swiney, completions consultant, both of Cabot Oil and Gas were at the site during the inspection. Keane is the Cabot subcontractor at the site conducting hydraulic fracturing (stimulation) operations for the B Augustine 5H, 9H, 11H and 13H wells. Cabot submitted stimulation notices to the Department on 10/24/18. The comments in the notices indicate that frac operations would begin at 8 AM on 10/25/18. Frac operations are temporarily suspended today, 11/21/18, due to the Thanksgiving holiday according to Mr. Watson. Operations will resume on 11/23/18, Mr. Watson indicated. The 3H and 4H wells are the existing wells on the pad. These wells are currently shut in. The production equipment associated with these wells has been |
For data sources see[9]