X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20475

Well Details

Well ID: 37-115-20475
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Springville Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID:
Farm/Lease Name: AUGUSTINE 1
License Status:
Spud Date:
Permit Date: 2010-12-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.688678
Longitude: -75.922183

For data sources see[1][2][3]

Well History

Date Event
2010-12-01 New Permit Application
2011-11-30 Permit Renewal Application

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2807309 Primary Facility 2018-10-16 Routine/Complete Inspection No Violations Noted Jon Sassi (EPS) and I arrived on site at 1304 to conduct a FUI inspection on behalf of the Department.

Upon our arrival, we spoke with Brian Kudrick (EHS Consultant - Cabot) who directed us to the location of the release and accompanied us until his colleagues arrived. Roughly 10 minutes after beginning our inspection Steve Watson, Brody Webster, and Steve Catalfamo (all of whom were representing Cabot) arrived on site.

During our discussion with Cabot, they informed us that the liner used for drilling and well stimulation operations is 40 mil thickness layered in a felt-liner-felt arrangement as seen in photo #4. They informed us that Cabot's SOP is to inspect the liner between drilling and fracing and make any repairs as needed. They then remove any contaminants and lay it back down if it is deemed suitable for reuse. According to the aforementioned Cabot representatives we spoke with on site, 2 roll off dumpsters of material have been excavated so far containing 30 yards each.

According to Cabot, the s

For data sources see[6]

References