X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20473

Well Details

Well ID: 37-115-20473
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Forest Lake Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148373
Farm/Lease Name: FRASER 3
License Status:
Spud Date:
Permit Date: 2010-11-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.864367
Longitude: -75.944981

For data sources see[1][2][3]

Well History

Date Event
2010-11-19 New Permit Application
2011-01-21 Performed Spud Operation
2011-04-12 Drilling Completion
2011-07-18 Perforation
2011-07-18 Performed Stimulation
2011-12-09 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-07-29 2011-07-29 6,402 5,160,666

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Clay Master-5C BJ Services Company Clay Stabilization No hazardous ingredients 0.00062000
Sand (Proppant) Proppant 100.00 11.51
Scaletrol 720 BJ Services Company Scale Inhibitor Ethylene glycol 107-21-1 35.00 0.00388000
Diethylene glycol 111-46-6 5.00 0.00055000
15 HCl BJ Services Company Acid Package Hydrochloric acid 7647-01-0 15.00 0.09
GBW-15C BJ Services Company Breaker Sodium chloride 7647-14-5 15.00 0.00003000
Water Carrier/Base Fluid 100.00 88.27
GW-3LD Green BJ Services Company Gellant Naphtha, petroleum, hydrotreated heavy 64742-48-9 60.00 0.02
Guar gum 9000-30-0 60.00 0.02
BF-7L BJ Services Company High pH Buffer Carbonic acid, dipotassium salt 584-08-7 50.00 0.00909000
CI-14 BJ Services Company Corrosion Inhibitor Methanol 67-56-1 68.00 0.00064000
Propargyl alcohol 5.00 0.00005000
FRW-18 BJ Services Company Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Alpha 1427 BJ Services Company Antibacterial Agent Glutaraldehyde 111-30-8 30.00 0.00726000
Ethanol 64-17-5 5.00 0.00121000
Didecyl dimethyl ammonium chloride 7173-51-5 10.00 0.00242000
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 7.00 0.00170000
XLW-32 BJ Services Company Crosslinker Methanol 67-56-1 90.00 0.00759000
Boric oxide 1303-86-2 20.00 0.00169000
Ferrotrol 300L BJ Services Company Iron Control Product Citric acid 77-92-9 70.00 0.00095000

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2011-07-18 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 116,223.59 43 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 698,188.87 364 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 553,396.91 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 408,145.22 353 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 358,656.55 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 382,004.98 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 353,705.04 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 329,563.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 306,022.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 532.10 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 533.67 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 47.15 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 81.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Produced Fluid 1,259.26 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 1.51 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drill Cuttings 416.08 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 5,791.76 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Fracturing Fluid Waste 13.89 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Basic Sediment 1.15 Bbl LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 93.00 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Basic Sediment 13.88 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Fracturing Fluid Waste 2.22 Tons LANDFILL 100081
2012 CABOT OIL & GAS CORP Fracturing Fluid Waste 12.65 Tons LANDFILL 100945
2012 CABOT OIL & GAS CORP Basic Sediment 19.67 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Basic Sediment 27.23 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 136.65 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2012 CABOT OIL & GAS CORP Fracturing Fluid Waste 1.83 Tons LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 5,248.94 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Fracing Fluid Waste 1,086.52 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CABOT OIL & GAS CORP Produced Fluid 73.75 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 1,328.84 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 15.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 2,742.57 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 1,540.57 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 4.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 691.70 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 32.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 335.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 CABOT OIL & GAS CORP Produced Fluid 148.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 554.81 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Waste Water Treatment Sludge 1.00 Tons REUSE (AT WELL PAD)
2017 CABOT OIL & GAS CORP Produced Fluid 16.78 Bbl REUSE (AT WELL PAD)
2017 CABOT OIL & GAS CORP Produced Fluid 109.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 1.09 Tons LANDFILL 101247
2017 CABOT OIL & GAS CORP Produced Fluid 1,591.24 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 797.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Other Oil & Gas Wastes 0.21 Tons LANDFILL 100933
2018 CABOT OIL & GAS CORP Produced Fluid 645.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 22.42 Bbl REUSE (AT WELL PAD)
2019 CABOT OIL & GAS CORP Produced Fluid 1,344.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 6.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1939552 Primary Facility 2010-12-29 Routine/Complete Inspection No Violations Noted
1960373 Primary Facility 2011-03-16 Follow-up Inspection Violation(s) Noted Met with Co. Man. Pioneer Rig 61. Follow up on report of two separate spills. Received call from Jerry Dugas. First spill occurred near dryer shakers. Reported 3 bbls of cutting lost due to overfill of pan under shaker. All cuttings were reportedly contained on plastic. Observed some residual mud in the area. Second spill occured while moving used oil tank (500 gal cap.) did not observe any spilled oil during inspection. Reportedly all oil cleaned up with vac. All violations immediately corrected.
2018890 Primary Facility 2011-11-09 Routine/Complete Inspection No Violations Noted Dep on site 11:30. Well tenders on site doing production work. Well is online. Vents are open. 6" water in cellar - no bubbling observed. Well tag present. Site id sign present. Four other wells drilled and completed on site. 1V (not online at time of inspection), and 5H, 7H and 8H which are online. No violations observed.
2045897 Primary Facility 2012-02-13 Incident- Response to Accident or Event No Violations Noted Violations and specifics associated with this inspection report can be referred to in the Fraser 1 inspection report for 2-13-12 Permit number is 115-20447
2052538 Primary Facility 2012-03-13 Follow-up Inspection No Violations Noted Violations and specifics associated with this inspection report can be referred to in the Fraser 1 3-13-12 inspection report. Permit number is 115-20447.
2354522 Primary Facility 2015-03-24 Routine/Complete Inspection No Violations Noted
2377266 Primary Facility 2015-06-04 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a routine complete inspection of the erosion and sedimentation controls at the Fraser E. well pad (ESX10-115-0020) on June 4, 2015. The wells associated with this pad are as follows:
2422216 Primary Facility 2015-11-04 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 11:20, the cellar was full of water, the (20x13) vent pipe was open and venting to a tank, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there were no pressure gauges on the well, I took a walk around the location and everything looked OK.
2502280 Primary Facility 2016-07-13 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a routine complete inspection of the erosion and sedimentation controls at the Fraser E. well pad (ESX10-115-0020) on June 4, 2015. The wells associated with this pad are as follows:

1V 115-20447 2H 115-20477 3H 115-20473 4H 115-20493 5H 115-20463 7H 115-20464 8H 115-20474

The site was in production, and not under any major construction at this time and the site was very well vegetated (>70%) and graded well. Surrounding the site active agriculture (haying operation) was occurring. There were no erosion and sedimentation issues on site and the access road was holding up well.


There were no violations

If there are any questions please feel free to contact me at (570)346-5539.

2516409 Primary Facility 2016-08-30 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 9:30a.m., the cellar was full of water with no bubbling noticed, the (20x13) vent pipe was open and venting into a tank, the (13x9) vent pipe was open and venting into a tank, the (9x5) vent pipe was open and venting into a tank. There was 573psi on the production casing and 176psi on the production line. I took a walk around the location and everything looked OK.

I left the site at 10:15a.m.

2549889 Primary Facility 2017-01-05 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a routine complete inspection of the erosion and sedimentation controls at the Fraser E. well pad (ESX10-115-0020) on June 4, 2015. The wells associated with this pad are as follows:

1V 115-20447 2H 115-20477 3H 115-20473 4H 115-20493 5H 115-20463 7H 115-20464 8H 115-20474

The site was in production, and not under any major construction at this time and the site was very well vegetated (>70%) and graded well. The vegetation surrounding the site has been mowed, and is in great shape. There were no erosion and sedimentation issues on site and the access road was holding up well.


There were no violations

If there are any questions please feel free to contact me at (570)346-5539.

2568310 Primary Facility 2017-02-23 Routine/Complete Inspection No Violations Noted The Department was on site to conduct a Routine Complete Inspection. This well site's ESCGP permit number is 5809802. I reviewed the E&S Inspection Log to find that Mike Brilla (TEC) conducted the most recent inspection on 2-14-17. He identified it as a post precipitation inspection.
2596327 Primary Facility 2017-05-17 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:20a.m.

There was a service crew on site to run 2¿ tubing in the wells to enhance production. I met with company man Jim Restly of Restly Oil & Gas Consulting. The tubing was pulled out of the 1V well and will be run in the 5H well. The 3H well has tubing in it and an additional 300' to 400' will be added. The 7H and 8H wells do not have tubing in them but will have new tubing run in them. The production units are also being refurbished. I took a walk around the location and there were no obvious concerns noticed. I left the site at 11:25a.m.

2703561 Primary Facility 2018-03-06 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was snow and ice 1' below grade in the cellar and was unable to check for gas. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2710118 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted I inspected the site on March 26, 2018. The weather was sunny and approximately 40 degrees. The access road was solid and stable. The pad surface was solid and the cut and fill slopes were well vegetated and stable. The wells were labeled clearly. The wells associated with this site were as follows:

115-20447 115-20463 115-20464 115-20473 115-20474 115-20477 115-20493 (plugged)

2740436 Primary Facility 2018-06-12 Routine/Complete Inspection No Violations Noted I performed a RTNC inspection of the Fraser Pad. The wells associated with this are the 115-20447, 115-20463, 115-20464, 115-20473, 115-20474, 115-20477 (plugged), 115-20493 (plugged). The wells were properly labeled.

The access road was solid and stable as was the pad surface. There was no puddling onsite. There did not appear to be any issues of concern with the site stability.

The cut slope as well as the fill slope was stable and well vegetated. They were gently sloped and there did not appear to be any erosional issues.

There were no violations.

2800716 Primary Facility 2018-11-08 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 4' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 11/2/18. There were five 55 gallon drums on containment (see photo) marked paint waste, a crew from Covanta Environmental Solutions arrived on site to remove the drums as I was about to leave. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1960373 607486 03/16/2011 2011-03-16 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety violations immediatly corrected

For data sources see[9]

References