If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20368 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.74465,"lon":-75.922319,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148155 | |
Farm/Lease Name: D BERRY 5 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-07-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.744650 | |
Longitude: -75.922319 |
Date | Event |
---|---|
2010-07-27 | New Permit Application |
2010-10-06 | Performed Spud Operation |
2010-11-10 | Drilling Completion |
2011-02-10 | Perforation |
2011-02-10 | Performed Stimulation |
2011-11-08 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-06-03 | 2011-06-03 | 6,884 | 3,221,064 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Carrier/Base Fluid | 100.00 | 88.92 | ||||
FRW-200 | Frac Tech Services (FTS) | Friction Reducer | No hazardous ingredients | 100.00 | 0.07 | |||
ICI-3240 | Frac Tech Services (FTS) | Antibacterial Agent | Sodium hydroxide | 1310-73-2 | 4.00 | 0.00158000 | ||
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00951000 | |||||
CI-150 (Corrosion Inhibitor) | Frac Tech Services (FTS) | Acid Corrosion Inhibitor | N,N-Dimethylformamide | 68-12-2 | 10.00 | 0.00009000 | ||
Organic Amineresin Salt | 30.00 | 0.00027000 | ||||||
Aromatic Aldehyde | 10.00 | 0.00009000 | ||||||
Quaternary Ammonium Compound | 10.00 | 0.00009000 | ||||||
Isopropanol | 67-63-0 | 60.00 | 0.00054000 | |||||
15 HCl | Frac Tech Services (FTS) | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.08 | ||
White Sand | Proppant | 100.00 | 10.85 | |||||
FE 100L (Iron Chelator) | Frac Tech Services (FTS) | Iron Control Product | No hazardous ingredients | 100.00 | 0.00182000 | |||
CS-500 SI | Frac Tech Services (FTS) | Scale Inhibitor | No hazardous ingredients | 100.00 | 0.04 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-02-10 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 994,954.41 | 149 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 1,298,499.15 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 697,396.74 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 636,860.64 | 351 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 357,765.55 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 449,849.22 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 371,965.47 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 243,919.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 231,180.00 | 353 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 203.40 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.59 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 122.40 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 65.70 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 18.60 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 106.90 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 209.28 Tons | LANDFILL | THR029 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 106.90 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 550.92 Tons | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 7.57 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 582.48 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.64 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1.32 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 2.07 Bbl | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.03 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 9.42 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 11.67 Bbl | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 54.57 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 3.19 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 6.87 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 572.84 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.35 Tons | LANDFILL | 132310 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.82 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 5,570.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 5.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 5.70 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 468.03 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 1.06 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 2.69 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 1.80 Bbl | LANDFILL | 101534 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 106.76 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 80.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 311.24 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 109.85 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 48.76 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 39.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 57.30 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 74.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 48.35 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 31.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 113.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1924142 | Primary Facility | 2010-10-28 | Drilling/Alteration | No Violations Noted | Patterson 252. Circulating hol. Depth of drilling 153. Will be setting 9 5/8" later today and cementing. Have set 13 3/8" and had 68 bbls cement returns. Drillers log on site and up to date. No violations observed. Closed loop system. |
1981845 | Primary Facility | 2011-06-16 | Routine/Complete Inspection | No Violations Noted | |
2066931 | Primary Facility | 2012-05-10 | Routine/Complete Inspection | No Violations Noted | Routine Inspection of well condition. Well is online. Cellar full of water. No bubbling observed. All annuli vented. no activity onsite. No violations observed. |
2244133 | Primary Facility | 2014-02-04 | Routine/Complete Inspection | No Violations Noted | Refer to inspection ID 2244114 |
2261888 | Primary Facility | 2014-04-14 | Administrative/File Review | No Violations Noted | refer to inspection record 2261875 |
2391368 | Primary Facility | 2015-07-21 | Routine/Complete Inspection | No Violations Noted | |
2422105 | Primary Facility | 2015-10-22 | Site Restoration | No Violations Noted | Inspection of the Berry D P1 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit. |
2494290 | Primary Facility | 2016-06-20 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:20p.m., the cellar had water at the bottom with no bubbling noticed, the (20x13) vent pipe was open and venting to a tank, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 490psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 14:00p.m. |
For data sources see[9]