X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20339

Well Details

Well ID: 37-115-20339
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Jessup Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 147914
Farm/Lease Name: C ROZELL 3
License Status:
Spud Date:
Permit Date: 2010-03-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.782239
Longitude: -75.925294

For data sources see[1][2][3]

Well History

Date Event
2010-03-31 New Permit Application
2010-06-01 Performed Spud Operation
2010-06-28 Drilling Completion
2010-08-13 Perforation
2010-09-30 Performed Stimulation
2011-01-21 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-09-30 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 1,328,022.31 352 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 844,917.34 365 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 553,225.81 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 590,204.94 357 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 273,831.85 356 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 421,804.37 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 317,363.19 350 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 552,790.00 320 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 344,013.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CABOT OIL & GAS CORP Basic Sediment 2.40 Bbl LANDFILL 101534
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 199.20 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Drill Cuttings 60.30 Tons LANDFILL 101247
2010 CABOT OIL & GAS CORP Drill Cuttings 17.10 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drill Cuttings 98.10 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 119.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 1.30 Tons LANDFILL 100955
2010 CABOT OIL & GAS CORP Fracing Fluid Waste 6,257.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Drill Cuttings 98.10 Tons LANDFILL 8-4630-00010/00
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 524.98 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 107.57 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 11.67 Bbl LANDFILL 100955
2011 CABOT OIL & GAS CORP Basic Sediment 8.07 Bbl LANDFILL 101534
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 32.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 144.14 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 9.42 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 250.39 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Produced Fluid 1,489.90 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 161.00 Tons LANDFILL NY # 50S08
2011 CABOT OIL & GAS CORP Drill Cuttings 20.81 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 17.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 CABOT OIL & GAS CORP Drill Cuttings 141.32 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Drill Cuttings 0.82 Tons LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 5.04 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 1.32 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Basic Sediment 0.67 Bbl LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 6.87 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Drill Cuttings 4.35 Tons LANDFILL 132310
2012 CABOT OIL & GAS CORP Basic Sediment 3.78 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Basic Sediment 2.28 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Basic Sediment 2.92 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 29.68 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2012 CABOT OIL & GAS CORP Produced Fluid 859.37 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CABOT OIL & GAS CORP Produced Fluid 248.45 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 199.26 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 55.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2014 CABOT OIL & GAS CORP Produced Fluid 748.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 204.63 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 98.95 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 121.04 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 147.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 58.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 136.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 144.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 185.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1895974 Primary Facility 2010-06-23 Drilling/Alteration No Violations Noted Patterson 252 BOP was tested to 5000 psi. Held 30 minutes.Current depth driling @ 7174' Fresh water at 74'. Varies gas recorded on log. Cts 13-3/8" w/ 110sx 11.5ppg standard lead, 540sx tail 15.4ppg FB= 6' Noted that Longer shakers shutes were needed company man said he will get on it..
1962353 Primary Facility 2011-03-31 Routine/Complete Inspection Violation(s) Noted No activity on site. Well (2H and 3H) are online. Rathole has not been filled in on 3H. Cellar of 2H should be pumped out- has residual waste in cellar. At rear of location observed trash scattered on ground. Drilling mud observed on ground sruface near plastic.
2366604 Primary Facility 2015-05-04 Routine/Complete Inspection No Violations Noted
2450141 Primary Facility 2016-02-16 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:20 p.m., the cellar was about half full of water with no bubbling noticed, the (20x13) vent pipe was open and venting to a tank, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 553psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 13:50 p.m.

2543566 Primary Facility 2016-12-06 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 14:40p.m., the cellar was about a quarter full of water with no bubbling noticed. The (20x13) vent pipe was open and venting into a small plastic tank, the (13x9) vent pipe was open and venting into a small plastic tank, the (9x5) vent pipe was open and venting into a small plastic tank. There was 560psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 15:05p.m.

2629773 Primary Facility 2017-08-28 Routine/Complete Inspection No Violations Noted At time of inspection, the well was in production.

I took a walk around the location and there were no obvious concerns noticed.

2731719 Primary Facility 2018-05-15 Routine/Complete Inspection No Violations Noted I conducted a RTNC inspection of the Rozell pad. The wells associated with this pad are the 115-20339 and 115-20340. The wells were properly labeled.

The access road and pad surface were firm and stable.

The cut and fill slopes were gentle and well vegetated with no erosional issues noted.

There were no violations noted.

2741066 Primary Facility 2018-06-13 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2836170 Primary Facility 2019-02-06 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. The cellar was full of ice and I was unable to check for gas. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 2/5/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1962353 607912 03/31/2011 2011-03-31 78.65(1)* - Rat hole not filled Environmental Health & Safety
1962353 607913 03/31/2011 2011-03-31 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety

For data sources see[8]

References