X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20336

Well Details

Well ID: 37-115-20336
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Dimock Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 146210
Farm/Lease Name: K STOCKHOLM 2
License Status:
Spud Date:
Permit Date: 2010-03-31
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.763972
Longitude: -75.973133

For data sources see[1][2][3]

Well History

Date Event
2010-03-31 New Permit Application
2010-08-30 Performed Spud Operation
2010-10-15 Drilling Completion
2010-10-29 Perforation
2010-11-18 Performed Stimulation
2011-01-21 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-11-18 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 1,308,239.99 329 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 912,441.00 365 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 585,549.00 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 712,151.00 363 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 300,500.00 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 532,378.00 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 403,642.00 364 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 282,834.00 364 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 303,795.00 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CABOT OIL & GAS CORP Basic Sediment 2.59 Bbl LANDFILL 101534
2010 CABOT OIL & GAS CORP Drill Cuttings 68.00 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 101247
2010 CABOT OIL & GAS CORP Drill Cuttings 254.60 Tons LANDFILL THR029
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 224.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Drill Cuttings 19.20 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drill Cuttings 110.60 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 135.10 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 887.30 Tons LANDFILL 100955
2010 CABOT OIL & GAS CORP Fracing Fluid Waste 9,361.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Drill Cuttings 110.60 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 8-4630-00010/00
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 524.98 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 290.37 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 11.62 Bbl LANDFILL 100955
2011 CABOT OIL & GAS CORP Basic Sediment 9.93 Bbl LANDFILL 101534
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 79.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 CABOT OIL & GAS CORP Drill Cuttings 4.12 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 1,086.35 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 9.42 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 1,887.23 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Produced Fluid 2,909.28 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 397.50 Tons LANDFILL NY # 50S08
2011 CABOT OIL & GAS CORP Drill Cuttings 0.64 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 43.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 CABOT OIL & GAS CORP Drill Cuttings 73.23 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Drill Cuttings 0.82 Tons LANDFILL 100081
2011 CABOT OIL & GAS CORP Drill Cuttings 71.33 Tons LANDFILL 100945
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 5.04 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 1.32 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Basic Sediment 2.52 Bbl LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 6.87 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Drill Cuttings 4.35 Tons LANDFILL 132310
2012 CABOT OIL & GAS CORP Basic Sediment 2.35 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Basic Sediment 3.49 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Basic Sediment 5.34 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 12.06 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2012 CABOT OIL & GAS CORP Produced Fluid 991.20 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CABOT OIL & GAS CORP Produced Fluid 153.07 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 284.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 945.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 25.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 199.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 3.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 258.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 168.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 227.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 168.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019 CABOT OIL & GAS CORP Produced Fluid 50.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1976941 Primary Facility 2011-05-27 Routine/Complete Inspection No Violations Noted Well in production. Well tag in place. Cellar full of rainwater. No evidence of gas bubbling around well head. No activity on site. Vents are open. One Adler open-top tank on pad which is full of cuttings/water/ and some trash. Recommend this be properly removed and disposed of ASAP.
2361396 Primary Facility 2015-04-15 Routine/Complete Inspection No Violations Noted
2482930 Primary Facility 2016-05-11 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:55 a.m., the cellar was full of water with no bubbling noticed, the (13x9) vent pipe was open and venting to a tank, the (9x5) vent pipe was open and venting to a tank, there was 647psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 11:20 a.m.

For data sources see[8]

References