If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20320 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.697367,"lon":-75.865619,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Springville Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 147929 | |
Farm/Lease Name: CARSON 3 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-29 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.697367 | |
Longitude: -75.865619 |
Date | Event |
---|---|
2010-03-29 | New Permit Application |
2010-05-23 | Performed Spud Operation |
2010-09-23 | Drilling Completion |
2010-10-08 | Perforation |
2010-11-01 | Performed Stimulation |
2011-01-21 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-11-01 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 362,083.00 | 41 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 1,788,679.84 | 325 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 954,754.36 | 362 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 554,896.47 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 628,921.02 | 358 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 395,981.45 | 359 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 505,049.26 | 356 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 383,213.69 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 329,758.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 300,303.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 7,515.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 229.30 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Produced Fluid | 840.53 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 113.00 Tons | LANDFILL | 8-4630-00010/00 |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.59 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 138.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 69.40 Tons | LANDFILL | 101247 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 19.60 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 44.70 Tons | LANDFILL | THR029 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 113.00 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.50 Tons | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 524.98 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 3.50 Tons | LANDFILL | NY # 50S08 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.64 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1.32 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 0.85 Bbl | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 71.98 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 9.42 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 11.67 Bbl | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 8.29 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 54.57 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 6.87 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 1,648.07 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 0.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 0.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.35 Tons | LANDFILL | 132310 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.82 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 5.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 2.96 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 1.51 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 2.64 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 533.62 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 2.08 Bbl | LANDFILL | 101534 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 171.19 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 32.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 322.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 195.96 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 3.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 128.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Waste Water Treatment Sludge | 1.28 Tons | LANDFILL | 301358 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 231.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 41.94 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 137.54 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 189.01 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 37.73 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 237.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1908992 | Primary Facility | 2010-08-23 | Follow-up Inspection | Violation(s) Noted | |
1914990 | Primary Facility | 2010-09-21 | Drilling/Alteration | No Violations Noted | Pioneer rig 63. running 5.5" casing in hole to 10131'. Will cement back up to 500' below surface level. Reserve pit at 2' freeboard level. Operator pumping down pit at time of inspection. Drillers log on site and up to date. No violations observed. |
2311278 | Primary Facility | 2014-10-07 | Incident- Response to Accident or Event | No Violations Noted | The Department was on site on 10/7/2014 at the Cabot Slocum S. Well Site to conduct a routine inspection. Well permits that have been issued for this pad are the 1H (37-115-20319) and the 3H (37-115-20320). |
2420337 | Primary Facility | 2015-10-29 | Routine/Complete Inspection | No Violations Noted | |
2601264 | Primary Facility | 2017-06-06 | Administrative/File Review | No Violations Noted | |
2725386 | Primary Facility | 2018-05-01 | Routine/Complete Inspection | No Violations Noted | Arrived on location at 09:00. Weather: Clear, Mild, ~ 60 degs. A total of (2) wells have been drilled on this pad, the Carson 1H and 3H wells. Both wells were in production at time of inspection. Both wells Prod. casing, Static and Differential pressures were being monitored by wireless sending units sending data to onsite Total Flow Control Unit "TFCU". TFCU LED readouts were located beside each wells Gas Production Units "GPU"s. Both wells (9 5/8"x 5 1/2") annuli vents were open and venting, plumbed to a common, shared poly vent tank. Gas check performed at shared poly vent tank showed 100% CH4. Since Both these wells production casing cement tops were left down beneath their intermediate casing shoes, this venting gas is expected and not a violation. Gas check performed ~ 3' away from poly vent tank showed 0% LEL, 0% CH4. Both well cellars were full of water. Water levels were above the open conductor and surface casing tops. No bubbling was noted in cellars at time of inspection. Individual well pressure |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1908992 | 594132 | 08/23/2010 | 2010-08-23 | 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table | Administrative | Due to excessive rain, liner in pit sloughed in to the pit. Potential drilling fluid went outside liner. |
1908992 | 594133 | 08/23/2010 | 2010-08-23 | 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used | Administrative | Potential Pollution on backside of pit due to pit liner failure. Further investigation will be necessary when drilling complete and fluids are removed from pit. |
For data sources see[8]