If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20265 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.715653,"lon":-75.972408,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Auburn Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148817 | |
Farm/Lease Name: MAIOLINI 3 | |
License Status: | |
Spud Date: | |
Permit Date: 2010-03-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.715653 | |
Longitude: -75.972408 |
Date | Event |
---|---|
2010-03-17 | New Permit Application |
2011-03-14 | Permit Renewal Application |
2011-06-29 | Performed Spud Operation |
2011-07-27 | Drilling Completion |
2011-11-08 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-09-22 | 2011-09-22 | 7,196 | 4,993,170 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | FE 100L (Iron Chelator) | Frac Tech Services (FTS) | Iron Control Product | No hazardous ingredients | 100.00 | 0.00179000 | ||
ICI-3240 | Frac Tech Services (FTS) | Antibacterial Agent | Sodium hydroxide | 1310-73-2 | 4.00 | 0.00162000 | ||
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00973000 | |||||
Sand (Proppant) | Proppant | 100.00 | 10.97 | |||||
Water | Carrier/Base Fluid | 100.00 | 88.80 | |||||
CI-150 (Corrosion Inhibitor) | Frac Tech Services (FTS) | Acid Corrosion Inhibitor | Isopropanol | 67-63-0 | 60.00 | 0.00053000 | ||
Aromatic Aldehyde | 10.00 | 0.00009000 | ||||||
Quaternary Ammonium Compound | 10.00 | 0.00009000 | ||||||
Organic Amineresin Salt | 30.00 | 0.00027000 | ||||||
N,N-Dimethylformamide | 68-12-2 | 10.00 | 0.00009000 | |||||
FRW-200 | Frac Tech Services (FTS) | Friction Reducer | No hazardous ingredients | 100.00 | 0.06 | |||
CS-500 SI | Frac Tech Services (FTS) | Scale Inhibitor | No hazardous ingredients | 100.00 | 0.04 | |||
15 HCl | Frac Tech Services (FTS) | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.08 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 1,247,369.67 | 81 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 3,877,432.90 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 1,813,194.26 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,675,292.33 | 363 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 817,062.16 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 1,041,716.52 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 949,952.07 | 364 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 758,103.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 607,587.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 0.24 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,179.78 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1.07 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 12.89 Bbl | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.83 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 1,056.02 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 1,058.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 29.53 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 2.19 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 9,459.69 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 4.90 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 1,123.23 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 2.65 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 5.60 Bbl | LANDFILL | 100081 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 332.24 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 55.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 561.62 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 731.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 63.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 230.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 50.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 205.62 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 129.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 164.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 78.03 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 194.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 83.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 192.74 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1984609 | Primary Facility | 2011-06-27 | Routine/Complete Inspection | No Violations Noted | |
1989159 | Primary Facility | 2011-07-18 | Drilling/Alteration | No Violations Noted | Patterson 252. At drilling depth 498'. Drillers log on site and up to date. Indications of water at 84' and 105'. Both 13 3/8" and 9 5/8" casing and cement jobs show good returns. 13 3/8" set at 424'. 9 5/8" set at 1540 '. Used Halliburton Swiftchem cement blends on both. Conductor set at 175' (kb). |
2002008 | Primary Facility | 2011-08-01 | Routine/Complete Inspection | No Violations Noted | |
2009130 | Primary Facility | 2011-09-15 | Routine/Complete Inspection | Violation(s) Noted | |
2283487 | Primary Facility | 2014-05-28 | Routine/Partial Inspection | No Violations Noted | After an administrative review of the Department’s files, it was noted that the Maiolini 2H (115-20277) was in “proposed but never materialized” status. The Maiolini 3H (115-20265) was spud on 6/22/2011 and drilling was completed on 7/27/11. The Maiolini 4H (115-20372) was spud on 6/30/2011 and drilling was completed on 8/15/11. According to the Department’s records, this is a violation of 58 PA C.S. § 601.206. |
2373077 | Primary Facility | 2015-05-18 | Site Restoration | No Violations Noted | The Department (Scott Kuchta- WQS, Jon Sassi-EPS, and I) was on site in response to the submittal of a Well Site Restoration Report in response to the Department's Notice of Violation. At the time of the inspection, the E&S Plan was on site. The Department reviewed the E&S revised Restoration Plan and determined that it appeared as though the site conditions were reflective of the plan map. The restored areas of the well site are temporarily stabilized (mostly with erosion control blanket) but they have yet to achieve permanent stabilization. |
2430945 | Primary Facility | 2015-12-04 | Site Restoration | No Violations Noted | Inspection of the Maiolini R P2 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit. |
2535057 | Primary Facility | 2016-10-25 | Routine/Complete Inspection | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2009130 | 621789 | 09/15/2011 | 2011-09-15 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | |
2009130 | 621790 | 09/15/2011 | 2011-09-15 | 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used | Administrative | 402 |
2009130 | 621791 | 09/15/2011 | 2011-09-15 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety |
For data sources see[8]