If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20238 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.744764,"lon":-75.922467,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148155 | |
Farm/Lease Name: D BERRY 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-12-17 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.744764 | |
Longitude: -75.922467 |
Date | Event |
---|---|
2009-12-17 | New Permit Application |
2010-03-06 | Performed Spud Operation |
2010-05-31 | Drilling Completion |
2010-08-09 | Perforation |
2010-08-09 | Performed Stimulation |
2011-11-08 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-06-09 | 2011-06-09 | 6,656 | 6,250,230 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | White Sand | Proppant | 100.00 | 10.94 | ||||
CS-500 SI | Frac Tech Services (FTS) | Scale Inhibitor | No hazardous ingredients | 100.00 | 0.04 | |||
15 HCl | Frac Tech Services (FTS) | Acid Package | Hydrochloric acid | 7647-01-0 | 15.00 | 0.08 | ||
ICI-3240 | Frac Tech Services (FTS) | Antibacterial Agent | Sodium hydroxide | 1310-73-2 | 4.00 | 0.00159000 | ||
Tetrahydro-3,5-dimethyl,2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24.00 | 0.00954000 | |||||
CI-150 (Corrosion Inhibitor) | Frac Tech Services (FTS) | Acid Corrosion Inhibitor | Isopropanol | 67-63-0 | 60.00 | 0.00052000 | ||
N,N-Dimethylformamide | 68-12-2 | 10.00 | 0.00009000 | |||||
Quaternary Ammonium Compound | 10.00 | 0.00009000 | ||||||
Organic Amineresin Salt | 30.00 | 0.00026000 | ||||||
Aromatic Aldehyde | 10.00 | 0.00009000 | ||||||
FE 100L (Iron Chelator) | Frac Tech Services (FTS) | Iron Control Product | No hazardous ingredients | 100.00 | 0.00177000 | |||
Water | Carrier/Base Fluid | 100.00 | 88.82 | |||||
FRW-200 | Frac Tech Services (FTS) | Friction Reducer | No hazardous ingredients | 100.00 | 0.07 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-08-09 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 1,986,126.59 | 148 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 3,126,597.16 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 1,562,924.44 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 1,446,363.58 | 353 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 785,016.58 | 355 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 1,098,387.96 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 798,990.99 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 569,097.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 464,513.00 | 353 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | Basic Sediment | 0.80 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 79.40 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 248.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 22.50 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 129.20 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 149.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.70 Tons | LANDFILL | 100955 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 129.20 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 285.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 582.48 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.03 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 11.67 Bbl | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 1.04 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 5.70 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 165.51 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 9.42 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 287.54 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 892.58 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.64 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 54.57 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 10,014.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 0.82 Tons | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 168.00 Tons | LANDFILL | 100945 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 5.04 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011 | CABOT OIL & GAS CORP | Fracturing Fluid Waste | 13.62 Tons | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 1.32 Bbl | LANDFILL | 301626 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 6.59 Bbl | LANDFILL | 100081 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 6.87 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD014286009 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 4.35 Tons | LANDFILL | 132310 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 2.37 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 5.60 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 4.48 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 1,036.93 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 121.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 66.86 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 379.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 206.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 20.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 254.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 269.82 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 186.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 143.66 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 139.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 88.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 215.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1879575 | Primary Facility | 2010-04-13 | Drilling/Alteration | Viol(s) Noted & Immediately Corrected | Pioneer Rig 63. Drilling temporarily stopped. During drilling of surface pipe, has cuttings blow beyond the reserve pit onto adjacent bank. A hole was noticed in the liner of the pit, and springwater was flowing into pit. Operator in process of sucking out all cuttings and placing in temporary pit. Plan is to remove liner, and re-line reserve pit. I mentioned that the base of pit needs to be above seasonal high water table. Cabot using URS to determine watertable. |
1879751 | Primary Facility | 2010-04-20 | Drilling/Alteration | No Violations Noted | Co. Man notified DEP that possible poor cement job on surface casing, based on CBL run. Planning on squeezing cement at @ 440'. Have bubbles coming to surface between surface pipe and conductor. 9 5/8" set at 1500'. Cemented on 4/8/10 with 100 sks lead (11.5 lb) and 609 sks tail (14.8 lb). 40 bbls cement return reported. |
1879772 | Primary Facility | 2010-04-21 | Follow-up Inspection | No Violations Noted | Follow up on squeeze job on surface casing. Co. man on site said they perf'd casing and could not squeeze any additional cement into backside. Drilling has continued at this point. Operator stil discussing posible solutions to stop surface bubbling. Mud loggers provided DEP with copy of mud log. |
1879781 | Primary Facility | 2010-04-22 | Follow-up Inspection | No Violations Noted | Jay Theriot on site- Co. Man. Drilling on air - depth at 4785'. Planning to set plug at 440' with 30' of sand on top. Plan to use 24 gram shot to do second perforation of 2' section of 9 5/8" casing. 4 shots/ft for total of 8 shots. Top of perf- 388, bottom at 390. Will then try to squeeze add'l cement into backside. Have service companies coming to site to run gamma log and CBL. |
1879792 | Primary Facility | 2010-04-25 | Follow-up Inspection | No Violations Noted | Met with Bruce Jankura-DEP. Co. Man on site - Jay Theriot. Well is pressured up to 2400 lbs. Checked gauge while on site and has bled off to 1900lbs. Additional cement was squeezed downhole. As of 6:00 pm on 4/24, bubbling has stopped in cellar. Operator continues to monitor for bubbling. At 3:00 pm today, plan is to drill out and set plug to run another CBL, and possibly additional logs if necessary. There was no bubbling in cellar at time of inspection. |
1879794 | Primary Facility | 2010-04-27 | Follow-up Inspection | No Violations Noted | Co. man on site Jay Theriot. Completed CBL as of 3:00 am today. At time of inspeciton there was no bubbling in cellar. Crew was TOH and continue to monitor cellar. |
1881314 | Primary Facility | 2010-04-29 | Drilling/Alteration | No Violations Noted | Jay Theriot-co. man on site. washed over 9 5/8" pipe in between 16' with 12 1/2" shoe down to 75 kb. (52'). superior well services on site to provide cementing services. plan to use 1" trmie to add cement in between casing and then WOC at least 4 hours. Will call DEP upon completion of cementing to update status of well. |
1881367 | Primary Facility | 2010-05-03 | Drilling/Alteration | No Violations Noted | Pioneer Rig 63. TOH and putting hamer bit on to resume drilling. On 4/30, superior pumped cement in between conductor and surface pipe using 1" tremie pipes. Pumped 60 sks of cement and had returns throughout entire job. Cement was in place at 17:00 hours. Driler stated they waited on cement approximately 14 hours before proceeding. Bubbling has stopped in cellar. |
1884490 | Primary Facility | 2010-01-06 | Routine/Complete Inspection | No Violations Noted | |
1886587 | Primary Facility | 2010-05-18 | Drilling/Alteration | No Violations Noted | Cal Elton - Company Man on site. Depth of drilling 8730'. I inspected cellar of well and did not see any evidence of bubbling. There was standing water in the cellar at the time of inspection. I asked the company man to notify us if any bubbling became present in the future. Freeboard in the reserve pit was @4'. The liner appeared to be in good condition. The site was lined with plastic. No spills observed. No violations cited. |
1981837 | Primary Facility | 2011-06-16 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | |
2066936 | Primary Facility | 2012-05-10 | Routine/Complete Inspection | No Violations Noted | Routine Inspection of well condition. Well is online. Cellar full of water. No bubbling observed. All annuli open and vented. No activity on site. No violations observed. |
2244114 | Primary Facility | 2014-02-04 | Incident- Response to Accident or Event | Violation(s) Noted | Inspection conducted with Brody Webster on 2/4/2014 of the Berry, D. Pad 1 small spill which was identified on 2/1/2014 and called in by Brody Webster on that same day at 5:30 AM. The spill occurred when a dump line froze which caused a hammer joint to loosen and subsequently release production fluid to the ground. Reported spill volume was 42 gallons. Excess liquid was removed with a vac truck. The impacted site has been covered with plastic. All dump lines are covered with plastic which, when used in conjunction with external heaters, is used to thaw out the dump lines. NERO EC&B Act 2 ROL granted 6/30/14, closed. |
2261875 | Primary Facility | 2014-04-14 | Administrative/File Review | No Violations Noted | This administrative inspection has been created to document Cabot’s response letter related to a spill on the D Berry Pad documented in the 2/4/14 NOV/inspection record # 2244114 and the associated enforcement record # 307457. |
2391361 | Primary Facility | 2015-07-21 | Routine/Complete Inspection | No Violations Noted | |
2422102 | Primary Facility | 2015-10-22 | Site Restoration | No Violations Noted | Inspection of the Berry D P1 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit. |
2494284 | Primary Facility | 2016-06-20 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 13:20p.m., the cellar was empty with no gas detected at the perimeter of the cellar, the (9x5) vent pipe was open and venting to a tank, there was 519psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 14:00p.m. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1879575 | 585822 | 04/13/2010 | 2010-04-13 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | overspray of drill cuttings was immediatly cleaned up. violation of 78.54...control of drill cuttings ....has been immediately corrected. |
1981837 | 613912 | 06/16/2011 | 2011-06-16 | 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. | Administrative | |
2244114 | 688551 | 02/04/2014 | 2014-02-04 | 402CSL - Failure to adopt pollution prevention measures required or prescribed by DEP by handling materials that create a danger of pollution. | Environmental Health & Safety | NERO EC&B Act 2 ROL granted 6/30/14, closed. |
2244114 | 688553 | 02/04/2014 | 2014-02-04 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | NERO EC&B Act 2 ROL granted 6/30/14, closed. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
688551 | 307457 | NOV - Notice of Violation | Comply/Closed | 2014-06-30 | |||
688553 | 307457 | NOV - Notice of Violation | Comply/Closed | 2014-06-30 |
For data sources see[9]