37-115-20227

Well Details

Well ID: 37-115-20227
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Springville Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 146558
Farm/Lease Name: TEEL UNIT 1H
License Status:
Spud Date:
Permit Date: 2009-10-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.711647
Longitude: -75.886864

For data sources see[1][2][3]

Well History

Date Event
2009-10-02 New Permit Application
2009-12-10 Performed Spud Operation
2010-01-15 Drilling Completion
2010-03-15 Perforation
2010-03-15 Performed Stimulation
2012-12-07 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-03-15 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2010 CHIEF OIL & GAS LLC 1,264,432.00 195 0.00 0 0.00 0
2011 CHIEF OIL & GAS LLC 815,402.00 329 0.00 0 0.00 0
2012 CHIEF OIL & GAS LLC 527,950.61 355 0.00 0 0.00 0
2013 CHIEF OIL & GAS LLC 459,859.00 363 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 557,288.00 365 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 354,169.67 361 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 294,732.43 366 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 268,138.41 342 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 208,010.12 364 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 163,633.55 362 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CHIEF OIL & GAS LLC Produced Fluid 130.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CHIEF OIL & GAS LLC Produced Fluid 293.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2010 CHIEF OIL & GAS LLC Drilling Fluid Waste 1,809.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2010 CHIEF OIL & GAS LLC Produced Fluid 512.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CHIEF OIL & GAS LLC Fracing Fluid Waste 3,556.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2012 CHIEF OIL & GAS LLC Produced Fluid 132.30 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHIEF OIL & GAS LLC Produced Fluid 161.10 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Produced Fluid 453.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHIEF OIL & GAS LLC Produced Fluid 207.25 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid 175.05 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 55.88 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Produced Fluid 12.84 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CHIEF OIL & GAS LLC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHIEF OIL & GAS LLC Produced Fluid 63.16 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 31.15 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1845595 Primary Facility 2009-10-26 Routine/Complete Inspection No Violations Noted
1845597 Primary Facility 2009-10-26 Routine/Complete Inspection No Violations Noted
1845636 Primary Facility 2009-11-04 Routine/Complete Inspection No Violations Noted
1852129 Primary Facility 2009-12-16 Drilling/Alteration No Violations Noted I arrived on Site at 14:00 on 12/16/09. I met with the Tool Pusher on location who indicated the Company Man was offsite at that time. Drill Rig on site was Patterson 251. At the time of inspection, drilling depth was at 1974¿. Hole was being drilled on air. I completed a site inspection and was accompanied by the Toolpusher. I indicated to the Toolpusher that the plastic lining underneath the equipment should be rolled up to contain any potential spilled fluids. At the time of inspection, the plastic lining I observed was laying flat on the ground.
1852640 Primary Facility 2009-11-18 Routine/Complete Inspection No Violations Noted
1855897 Primary Facility 2010-01-07 Drilling/Alteration No Violations Noted I arrived on Site at 9:00 on 1/07/10. I met with the Tool Pusher on location who indicated the Company Man was offsite at that time. Drill Rig on site was Patterson 251. At the time of inspection, drilling depth was at TD of 9924¿. The Tool Pusher indicated that they were making runs in and out of the hole to clean it out prior to setting production casing. The reserve pit had approximately 8¿ of freeboard and the liner appeared to be in good condition. Plastic was down around the substructure to contain any spills of fluid. I indicated to the Tool Pusher that secondary containment should be installed around the mud storage tank.
1871628 Primary Facility 2010-03-20 Drilling/Alteration Violation(s) Noted
1873578 Primary Facility 2010-03-23 Follow-up Inspection Violation(s) Noted
1881331 Primary Facility 2010-04-30 Follow-up Inspection Violation(s) & Outstanding Violations previously cited for cutting blown beyond reserve pit. cuttings have not been cleaned up which is continuing violation of 25Pa section 78.54. Observed tear in reserve pit liner approx. 8" above fluid level. This is violation of 78.56 a(2). No company man on site at time of inspection.
1899612 Primary Facility 2010-07-21 Follow-up Inspection Outstanding Violations - No Viols Req'd During an inspection completed on 4/30/10, I observed a large tear in the liner of the pit and cuttings that were blown beyond the limits of the pit. Since then, the cuttings that were blown beyond the pit have been scraped off the adjacent slope and place within the reserve pit. The cuttings have been place directly over the area of the pit where the tear was observed. According the to the Operator, the tear in the liner was repaired. In order to determine that the pit has been repaired, the cuttings in this area must be scraped off the sidewall of the pit so that a complete inspection of the repaired liner can be performed. Please arrange to have this work completed and the liner exposed. Notify DEP at the time the soil is to be removed and the liner exposed.
1912239 Primary Facility 2010-08-16 Follow-up Inspection No Violations Noted At time of instpection M. R. Dirt reclaiming pit. Cuttings and liner were removed and disposed of oof site. Pit is approx. 1/2 complete. Well has well tag. Well is online. Site ID sign is present. No violations were observed. Previous vilolations cited have been corrected.
2685266 Primary Facility 2018-01-19 Routine/Complete Inspection No Violations Noted There was no activity occurring at the site during the inspection. The entrance gate was unsecured. There were no violations noted. If you have any questions, please contact me.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1871628 583685 03/20/2010 2010-03-20 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used Administrative violation=overspray of cuttings beyond reserve pit
1873578 584216 03/23/2010 2010-03-23 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used Administrative Failure to manage residual waste 6018.301
1873578 584217 03/23/2010 2010-03-23 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used Administrative Potential pollution to waters of the Commonwealth 402
1873578 584218 03/23/2010 2010-03-23 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used Administrative Failure to contain a pollutional substance in a lined pit or tank 78.56a
1881331 586250 04/30/2010 2010-04-30 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative tear in liner observed 8" from fluid level.
1881331 586251 04/30/2010 2010-04-30 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used Administrative continuing violation. cuttings blown beyond reserve pit were no cleaned up. previously cited for violation.

For data sources see[8]

References