37-115-20226

Well Details

Well ID: 37-115-20226
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Dimock Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 147756
Farm/Lease Name: BAKER 3
License Status:
Spud Date:
Permit Date: 2009-11-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.744511
Longitude: -75.879614

For data sources see[1][2][3]

Well History

Date Event
2009-11-12 New Permit Application
2009-12-11 Performed Spud Operation
2010-04-09 Drilling Completion
2010-10-27 DEVIATED
2012-10-05 Perforation
2012-10-11 Performed Stimulation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-10-10 2012-10-10 7,051 6,932,352

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 10.1-15 Baker Hughes Acidizing Water 7732-18-5 85.00 0.49
Hydrochloric acid 7647-01-0 15.00 0.08
CI-14 Baker Hughes Corrosion Inhibitor Propargyl alcohol 107-19-7 5.00 0.00004000
Fatty Acids 10.00 0.00009000
Olefin 5.00 0.00004000
Polyoxyalkylenes 30.00 0.00026000
Alpha 1427 Baker Hughes Biocide Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.00 0.00114000
Ethanol 64-17-5 5.00 0.00114000
Didecyl dimethyl ammonium chloride 7173-51-5 10.00 0.00228000
Glutaraldehyde 111-30-8 30.00 0.00683000
Scaletrol 720 Baker Hughes Scale Inhibitor Calcium chloride 10043-52-4 5.00 0.00078000
Ethylene glycol 107-21-1 30.00 0.00470000
Ferrotrol 300L Baker Hughes Iron Control Citric acid 77-92-9 60.00 0.00077000
Sand, White, 100 mesh Baker Hughes Proppant Quartz 14808-60-7 100.00 0.61
FRW-18 Baker Hughes Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.01
Clay Master-5C Baker Hughes Clay Control 1,2-Ethanediaminium, N, N'-bis[2-[bis(2-hydroxyethyl)methylammonio]ethyl]-N,N'bis(2-hydroxyethyl)-N,N'-dimethyl-,tetrachlorid
e
138879-94-4 60.00 0.00036000
Sand, White, 40/70 Baker Hughes Proppant Quartz 14808-60-7 100.00 10.91
Water Operator Carrier Water 7732-18-5 100.00 87.75

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2012-10-11 0 0 0

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2010 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 865,033.00 73 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 3,714,851.00 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 1,982,211.00 363 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 949,612.00 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 1,200,830.00 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 917,482.00 363 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 792,123.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 617,520.00 362 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 246.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 148.40 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 78.70 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 101247
2010 CABOT OIL & GAS CORP Basic Sediment 2.96 Bbl LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drill Cuttings 21.10 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drill Cuttings 121.50 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 8-4630-00010/00
2010 CABOT OIL & GAS CORP Drill Cuttings 121.50 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drill Cuttings 1.70 Tons LANDFILL 100955
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 575.35 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 0.64 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 1.32 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Drill Cuttings 4.03 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 9.42 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 11.67 Bbl LANDFILL 100955
2011 CABOT OIL & GAS CORP Drill Cuttings 73.69 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 6.87 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Drill Cuttings 4.35 Tons LANDFILL 132310
2011 CABOT OIL & GAS CORP Drill Cuttings 0.95 Tons LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 5.04 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2012 CABOT OIL & GAS CORP Produced Fluid 1,100.22 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Basic Sediment 8.16 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Fracing Fluid Waste 2,335.74 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Produced Fluid 85.32 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2012 CABOT OIL & GAS CORP Fracturing Fluid Waste 1.55 Tons LANDFILL THR029
2012 CABOT OIL & GAS CORP Fracing Fluid Waste 1,588.43 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 700.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 517.19 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 705.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 257.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 3.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 173.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 185.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 96.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 187.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 186.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 75.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 216.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1852135 Primary Facility 2009-12-23 Drilling/Alteration No Violations Noted Arrived on site at approximately 9:00am. I met with Company Man on site Jay Theriot. At the time of inspection, operator was drilling a 12-1/4" hole on air to a depth of 1500' and then will set 9-5/8"surface casing. The Company Man indicated that cementing of the surface casing would likely occur later on this day. The drillers log was on site and up to date. The area surrounding the substructure was lined with plastic and bermed. E/S controls were in place. The reserve pit had adequate freeboard and the liner appeared to be in good condition.
1853145 Primary Facility 2009-12-31 Follow-up Inspection No Violations Noted It was reported that 30 ¿ 40 gallons of diesel fuel spilled onto the plastic liner located directly underneath the tank. Mr. Rogier stated that all of the diesel fuel was contained and none had reached the ground. At the time of inspection, there was no visible evidence of diesel spilled beyond the secondary containment. The cause of the spill was human error. A valve that was supposed to be closed during filling was left open, and subsequently, too much fuel was pumped into the tank. The spilled diesel fuel was cleaned up with absorbent rags and squeegees and was placed in containers for disposal.Based on my inspection, the spilled diesel fuel was contained in secondary containment already in place at the site. There was no evidence of diesel fuel spilling beyond the secondary containment onto the ground. No violations were identified during this inspection.
1871624 Primary Facility 2010-03-10 Drilling/Alteration Violation(s) Noted
1873022 Primary Facility 2010-03-24 Follow-up Inspection No Violations Noted Changing out motor and bit. TOOH. Follow up on cuttings spill. Area has been cleaned up. Site ID sign has also been installed. Previous violations have been corrected.
2107030 Primary Facility 2012-10-15 Drilling/Alteration No Violations Noted Frac completed ,Baker hues verbally reported no problems through 20 stages , 0 lbs. pressure on the 1-v plugged well on site
2107034 Primary Facility 2012-10-12 Drilling/Alteration No Violations Noted Site in good shape containment sufficient preparing to frac 12/20 stage ,collected records for previous stages.
2110041 Primary Facility 2012-10-16 Drilling/Alteration No Violations Noted DRILLING OUT FRAC BRIDGES
2110142 Primary Facility 2012-10-10 Drilling/Alteration No Violations Noted On site to perform Pre-frac inspection. Met with Larry Fulmer - Completions Supt. SPCC and MSDS's on site. WEnt through Engineering Study submitted by Cabot (9/24/09) and confirmed each item was present and implemented as per study. Based on my review and inspection all items proposed by Cabot in the document are in place. mr. Fulmer indicated that they will be performing a 20 stage frac, and fraccing operations will occur 24/7. At this time no violations were observed. DEP offsite 15:30.
2112270 Primary Facility 2012-10-17 Drilling/Alteration No Violations Noted hooking up to gathering line location and pad in acceptable condition, water sully lines are being taken up
2390909 Primary Facility 2015-07-20 Routine/Complete Inspection No Violations Noted
2487298 Primary Facility 2016-05-24 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 8:50 a.m., the cellar was about three quarters full of water with no bubbling noticed, the (9x5) vent pipe was open and venting to a tank, there was 590psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 9:10 a.m.

2641294 Primary Facility 2017-09-28 Site Restoration No Violations Noted I inspected the Baker pad on September 28, 2017 for Notice of Termination (NOT). The site's access road was smooth and solid, with a cornfield bordering the one side. The site itself was well vegetated and nicely maintained, mowed neatly and compact in size. The vegetation was all healthy and exceeded the 70% perennial vegetative threshold. The pad surface was smooth and not rutted and there were no erosional issues present at the time of inspection.

I recommend APPROVAL of this NOT.

There were no violations noted

2672705 Primary Facility 2017-12-19 Administrative/File Review No Violations Noted I approved a restoration report on December 19, 2017 for this well site.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1871624 583682 03/10/2010 2010-03-10 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling Administrative permit posted and cuttings cleaned up
1871624 583683 03/10/2010 2010-03-10 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used Administrative cuttings not contained within pit. overspray into adjacent wooded area

For data sources see[9]