If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20201 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.738839,"lon":-75.885567,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148406 | |
Farm/Lease Name: GESFORD 5H NW | |
License Status: | |
Spud Date: | |
Permit Date: 2009-08-13 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.738839 | |
Longitude: -75.885567 |
Date | Event |
---|---|
2009-08-13 | New Permit Application |
2009-08-25 | Performed Spud Operation |
2009-12-13 | Perforation |
2009-12-14 | Drilling Completion |
2010-03-26 | Performed Stimulation |
2010-10-01 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-03-26 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 506,484.50 | 221 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 360,229.12 | 342 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 189,260.82 | 303 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 245,255.83 | 364 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 208,637.76 | 353 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 125,491.08 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 163,792.47 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 135,786.37 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 123,490.00 | 364 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 110,770.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 210.20 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Produced Fluid | 1,686.45 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.59 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 126.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 63.60 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 18.00 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 103.60 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 323.10 Tons | LANDFILL | THR029 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 103.60 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 119.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.30 Tons | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 9.22 Tons | LANDFILL | NY # 50S08 |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 0.90 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 5.11 Tons | LANDFILL | 101247 |
2011 | CABOT OIL & GAS CORP | Drill Cuttings | 202.13 Tons | LANDFILL | THR029 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 2.93 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 650.86 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 254.17 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.57 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 1.01 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 1.21 Bbl | LANDFILL | 101534 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 69.93 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 101.90 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 526.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 30.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 137.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 3.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 161.55 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 214.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 198.39 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 197.47 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 252.37 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 91.99 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 216.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1825892 | Primary Facility | 2009-08-27 | Drilling/Alteration | No Violations Noted | An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road. It was noted to the Company Man that the site ID sign still has "Permit Pending" under well Gesford 5H. I indicated to the Company Man to update the sign with the appropriate permit number. |
1833456 | Primary Facility | 2009-09-25 | Follow-up Inspection | No Violations Noted | An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road. |
1845066 | Primary Facility | 2009-11-10 | Follow-up Inspection | No Violations Noted | I inspected the well head for evidence of leakage. There was no standing water present in the cellar and no visible bubbling observed. The well is currently on-line. |
1846469 | Primary Facility | 2009-11-24 | Drilling/Alteration | No Violations Noted | At the time of inspection I met with Company Man Randy Short. Drill rig on site is SWJ - 14. Mr. Short indicated that the previous rig that was on location (GDS-9) lost a hammer bit downhole at approximately 5610'. The hole was cemented back up to 4973. An open-hole sidetrack is being drilled around the lost tools. At approximately 5174', drilling was back within the formation. Kickoff depth is approximately 5982. TVD is approximately 6618', and TD is proposed to be 9289'. |
1864356 | Primary Facility | 2010-02-17 | Routine/Complete Inspection | No Violations Noted | Inspected well as per DEP COA issued to Operator. Operator planning to frac. Based in DEP inspection, no violations were observed. |
1871622 | Primary Facility | 2010-03-04 | Drilling/Alteration | No Violations Noted | |
1902101 | Primary Facility | 2010-07-27 | Follow-up Inspection | No Violations Noted | |
1959425 | Primary Facility | 2011-03-22 | Routine/Complete Inspection | Violation(s) Noted | |
1971623 | Primary Facility | 2011-05-03 | Follow-up Inspection | No Violations Noted | |
2175559 | Primary Facility | 2013-06-03 | Incident- Response to Accident or Event | Violation(s) Noted | Friday 5/31/13, the operator had excavated an area that was approximately 30’X30’X5.5” deep; totaling 15.25 yards of potentially impacted material removed. The same day, the operator had a consultant collect confirmatory samples and background samples that should be completed in one week’s time. The estimated volume of fluid released from the Gesford 5H was determined to be 12 bbl. During the inspection, five (5) roll off containers were situated on site. Four (4) of which contained approximately fifteen (15) tons of recovered fill material each. The 500bbl tank was in place of the production tanks which had been removed to facilitate the excavation of the contaminated fill material. At the time of the release, the production tanks were located in an earthen berm on site. Currently the 500bbl tank is situated on makeshift plastic containment. The excavation was covered in plastic at the time of the inspection. |
2484669 | Primary Facility | 2016-05-11 | Routine/Partial Inspection | No Violations Noted | The Department, Jon Sassi (DEP-EPS) and I were on site to conduct a Routine Partial Inspection. At the time of the inspection, it was noted that the well site appears to meet temporary stabilization requirements. The Department noted that one of the production tanks has significantly more rust colored staining on it than the other. Please investigate the origin of the staining on the production equipment. |
2509188 | Primary Facility | 2016-08-04 | Complaint Inspection | No Violations Noted | At time of inspection, arrived on site at 11:55a.m. pertaining to a complaint called into the department about a backhoe and a dumpster being hauled onto the site and unknown activity. There was no activity on this site at time of inspection. There was no backhoe on site but there were two role off containers on the Castello J Pad 1 site. The marks on the entrance road indicated that the containers have recently been dropped off.
I left the site at 12:05p.m. |
2625965 | Primary Facility | 2017-08-16 | Routine/Complete Inspection | No Violations Noted | The Gesford access road was in good shape, but the Cabot locks on the gate did not fit the key the Department has. The pad surface is in good shape and solid. The cut and fill slopes were stable and well vegetated with perennial vegetation. There was no bubbling in the well cellars and there were no erosional issues noted.
There were no violations observed. |
2642778 | Primary Facility | 2017-10-02 | Site Restoration | No Violations Noted | I inspected the Gesford K, P1 well site on October 2, 2017. It is situated at the end of a long access road. The road was solid and stable as was the pad surface. The cut and fill slopes were well vegetated, although just outside the LOD the landowner was installing fence and regrading things a bit. These activities were not affecting the pad stability. There did not appear to be any erosional issues at this time.
I recommend APPROVAL of this NOT. There were no violations noted. |
2672655 | Primary Facility | 2017-12-19 | Administrative/File Review | No Violations Noted | I approved a site restoration report for this well on December 19, 2017. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1959425 | 607172 | 03/22/2011 | 2011-03-22 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1959425 | 607173 | 03/22/2011 | 2011-03-22 | 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. | Administrative | |
2175559 | 670614 | 06/03/2013 | 2013-06-03 | 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used | Administrative | 9/2/14 NERO EC&B ARP memo to operator, more info needed, scheduled resolution. 402-potential pollution |
2175559 | 670615 | 06/03/2013 | 2013-06-03 | 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution | Environmental Health & Safety | 9/2/14 NERO EC&B ARP memo to operator, more info needed, scheduled resolution. |
2175559 | 670616 | 06/03/2013 | 2013-06-03 | 78.57 - Failure to post pit approval number | Administrative | 9/2/14 NERO EC&B ARP memo to operator, more info needed, scheduled resolution. |
2175559 | 670617 | 06/03/2013 | 2013-06-03 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | 9/2/14 NERO EC&B ARP memo to operator, more info needed, scheduled resolution. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
670614 | 298805 | NOV - Notice of Violation | Administrative Close Out | 2014-09-22 | |||
670615 | 298805 | NOV - Notice of Violation | Administrative Close Out | 2014-09-22 | |||
670616 | 298805 | NOV - Notice of Violation | Administrative Close Out | 2014-09-22 | |||
670617 | 298805 | NOV - Notice of Violation | Administrative Close Out | 2014-09-22 |
For data sources see[8]