If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20181 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.717128,"lon":-75.943761,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148386 | |
Farm/Lease Name: G SHIELDS 4H SE | |
License Status: | |
Spud Date: | |
Permit Date: 2009-07-01 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.717128 | |
Longitude: -75.943761 |
Date | Event |
---|---|
2009-07-01 | New Permit Application |
2009-08-27 | Performed Spud Operation |
2009-10-21 | Drilling Completion |
2010-03-17 | Perforation |
2010-03-17 | Performed Stimulation |
2011-03-04 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2010-03-17 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 814,752.00 | 193 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 1,124,430.15 | 358 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 868,844.98 | 364 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 529,641.72 | 359 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 543,388.39 | 330 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 339,517.76 | 355 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 376,796.52 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 330,554.85 | 360 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 281,475.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 251,230.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | Drilling | 1,100.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2009 | CABOT OIL & GAS CORP | Drilling | 357.00 Bbl | Brine or Industrial Waste Treatment Plt | PAR9000009 |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.96 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 72.60 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 239.70 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Produced Fluid | 728.33 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 20.50 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 118.10 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 144.30 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.50 Tons | LANDFILL | 100955 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 330.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 119.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD085690592 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 118.10 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 119.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 2.08 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 569.12 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 0.37 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.66 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.42 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.86 Bbl | LANDFILL | 101534 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 177.83 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 87.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 7.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 90.64 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 283.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 3.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 108.77 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 4.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 57.54 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 65.58 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 52.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 69.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 0.79 Tons | LANDFILL | 101247 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 118.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 63.65 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 72.84 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1841144 | Primary Facility | 2009-10-19 | Drilling/Alteration | No Violations Noted | At time of inspection, I met with Jim Spalding (Company Man). Depth of drilling was at TD -10568¿. Operator set 13 packers on 5-1/2¿ production string. Freeboard in reserve pit was approximately 10¿. |
2405545 | Primary Facility | 2015-09-09 | Routine/Complete Inspection | No Violations Noted | |
2496278 | Primary Facility | 2016-06-27 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 10:00a.m., the cellar was full of gravel with no gas detected at the perimeter of the cellar, the (9x4) vent pipe was open and venting to a tank, there was 557psi on the production casing. I took a walk around the location and everything looked OK.
I left the site at 10:35a.m. |
2516838 | Primary Facility | 2016-09-01 | Site Restoration | No Violations Noted | The Department was on site to conduct a Notice of Termination (NOT) for the Shields G P2 well site, permit number 58-09-802. The wells associated with this site are as follows:
115-20181 The site was constructed according to plan, the vegetation was perennial, at or above the 70% vegetative standard and there were no erosional actions occuring at this time. All BMPs have been removed. I recommend APPROVAL of this Notice of Termination. If there are any questions please feel free to contact me at (570) 346-5539 |
2705256 | Primary Facility | 2018-03-08 | Routine/Complete Inspection | No Violations Noted | Arrived at location at 09:45. Weather: Overcast, cold, ~ 25 degs. (2) wells were present on location, the Shields, G. 2H and 4H. Both wells were producing at time of inspection. Both wells production pressures were being monitored by remote monitors sending data to Total Flow Control Units "TFCU"s with LED readouts located by production units. Each well had (1) annular vent plumbed to a shared poly vent tank. Both vents were labeled (9 5/8" x 5 1/2") and were open and venting to vent tank. A gas check performed at the shared vent tank opening showed: 100% LEL, 100% CH4. Gas check performed 3' away from vent tank showed 0% LEL, 0% CH4.
- Review of well history showed that a previous 72 hr. pressure build up tests "PBUT" had been performed on these wells on (10/29 - 11/1/11). The PBUT showed the 4H, (9x5) press. built to 166 psi. and the 2H, (9x5) showed no press. build up. - Further review of well history revealed that these wells are part of an ongoing gas migration investigation initiated by the Dept. on 1 |
2709444 | Primary Facility | 2018-03-19 | Routine/Complete Inspection | No Violations Noted | Arrived at location at 09:10. Weather: Clear, cold, ~ 30 degs. (2) wells were present on location, the Shields, G. 2H and 4H. Both wells were producing at time of inspection. Onsite to witness start of the 72hr. press. build up test "PBUT" being performed on both wells surface x production casing annuli. Upon arrival met with Cabot O&G Reps., Adam, Aaron, Brody and Steve onsite. Both wells surface x production casing annuli were equipped with pressure logging units tied into Cabot's cygnet monitoring system. Adam confirmed communication with loggers through cynet system. These annuli were shut in at 09:15. We will return to site on Thursday, March 22 at 09:15 for conclusion of the 72 hr. PBUT.
Wells pressures were taken off LED readouts mounted at production units. (Prod. Casing Press. = CP, Static Press. = SP, Differential Press. = DP.) Shields, G. 2H: CP = 461.6 psi., SP = 474.4 psi., DP = 25.2 psi. Shields, G. 4H: CP = 473.6 psi., SP = 476.2 psi., DP = 92.4 psi. No obvious concerns or additional viola |
2710033 | Primary Facility | 2018-03-22 | Routine/Complete Inspection | No Violations Noted | Arrived at location at 09:45. Weather: Clear, cold, ~ 30 degs. Onsite for the conclusion of the 72hr. press. build up test "PBUT" being performed on both wells surface x production casing annuli. The PBUT was started on 3/19/18 at 09:15. Upon arrival met with Cabot O&G Reps., Adam Vogt & Aaron Onks and (3) Selman & Assoc. Reps. Both wells surface x production casing annuli were equipped with pressure logging units tied into Cabot's cygnet monitoring system. The PBUT ending pressures were:
- 2H: (9 5/8"x 5 1/2") = 49 psi. - 4H: (9 5/8"x 5 1/2") = 84 psi. Gas checks performed by the Dept. and Selman showed: 100% CH4. The Dept. and Selman collected gas samples off both these annuli at approx. 09:50. Both wells annuli were bleed down and opened back up to poly vent tank. Post PBUT, water samples were collected at area resident by Eric Rooney, D.E.P. Geologist and Moody & Associates prior to bleeding pressures off of gas wells. - Review of well record for the 4H well showed the 5 1/2" prod. casing cement top was |
For data sources see[8]