37-115-20181

Well Details

Well ID: 37-115-20181
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Dimock Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148386
Farm/Lease Name: G SHIELDS 4H SE
License Status:
Spud Date:
Permit Date: 2009-07-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.717128
Longitude: -75.943761

For data sources see[1][2][3]

Well History

Date Event
2009-07-01 New Permit Application
2009-08-27 Performed Spud Operation
2009-10-21 Drilling Completion
2010-03-17 Perforation
2010-03-17 Performed Stimulation
2011-03-04 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-03-17 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2010 CABOT OIL & GAS CORP 814,752.00 193 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 1,124,430.15 358 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 868,844.98 364 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 529,641.72 359 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 543,388.39 330 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 339,517.76 355 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 376,796.52 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 330,554.85 360 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 281,475.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 251,230.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 CABOT OIL & GAS CORP Drilling 1,100.00 Bbl Municipal Sewage Treatment Plant PA0026034
2009 CABOT OIL & GAS CORP Drilling 357.00 Bbl Brine or Industrial Waste Treatment Plt PAR9000009
2010 CABOT OIL & GAS CORP Basic Sediment 2.96 Bbl LANDFILL 101534
2010 CABOT OIL & GAS CORP Drill Cuttings 72.60 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 101247
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 239.70 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Produced Fluid 728.33 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Drill Cuttings 20.50 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drill Cuttings 118.10 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 144.30 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 1.50 Tons LANDFILL 100955
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 330.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD085690592
2010 CABOT OIL & GAS CORP Drill Cuttings 118.10 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 8-4630-00010/00
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Basic Sediment 2.08 Bbl LANDFILL 101534
2011 CABOT OIL & GAS CORP Produced Fluid 569.12 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Basic Sediment 0.37 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Basic Sediment 0.66 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Basic Sediment 0.42 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Basic Sediment 0.86 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 177.83 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CABOT OIL & GAS CORP Produced Fluid 87.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 7.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 90.64 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 283.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 3.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 108.77 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 4.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 57.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 65.58 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 52.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 69.77 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Synthetic Liner Materials 0.79 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Produced Fluid 118.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 63.65 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 72.84 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1841144 Primary Facility 2009-10-19 Drilling/Alteration No Violations Noted At time of inspection, I met with Jim Spalding (Company Man). Depth of drilling was at TD -10568¿. Operator set 13 packers on 5-1/2¿ production string. Freeboard in reserve pit was approximately 10¿.
2405545 Primary Facility 2015-09-09 Routine/Complete Inspection No Violations Noted
2496278 Primary Facility 2016-06-27 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 10:00a.m., the cellar was full of gravel with no gas detected at the perimeter of the cellar, the (9x4) vent pipe was open and venting to a tank, there was 557psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 10:35a.m.

2516838 Primary Facility 2016-09-01 Site Restoration No Violations Noted The Department was on site to conduct a Notice of Termination (NOT) for the Shields G P2 well site, permit number 58-09-802. The wells associated with this site are as follows:

115-20181

The site was constructed according to plan, the vegetation was perennial, at or above the 70% vegetative standard and there were no erosional actions occuring at this time. All BMPs have been removed. I recommend APPROVAL of this Notice of Termination.

If there are any questions please feel free to contact me at (570) 346-5539

2705256 Primary Facility 2018-03-08 Routine/Complete Inspection No Violations Noted Arrived at location at 09:45. Weather: Overcast, cold, ~ 25 degs. (2) wells were present on location, the Shields, G. 2H and 4H. Both wells were producing at time of inspection. Both wells production pressures were being monitored by remote monitors sending data to Total Flow Control Units "TFCU"s with LED readouts located by production units. Each well had (1) annular vent plumbed to a shared poly vent tank. Both vents were labeled (9 5/8" x 5 1/2") and were open and venting to vent tank. A gas check performed at the shared vent tank opening showed: 100% LEL, 100% CH4. Gas check performed 3' away from vent tank showed 0% LEL, 0% CH4.

- Review of well history showed that a previous 72 hr. pressure build up tests "PBUT" had been performed on these wells on (10/29 - 11/1/11). The PBUT showed the 4H, (9x5) press. built to 166 psi. and the 2H, (9x5) showed no press. build up. - Further review of well history revealed that these wells are part of an ongoing gas migration investigation initiated by the Dept. on 1

2709444 Primary Facility 2018-03-19 Routine/Complete Inspection No Violations Noted Arrived at location at 09:10. Weather: Clear, cold, ~ 30 degs. (2) wells were present on location, the Shields, G. 2H and 4H. Both wells were producing at time of inspection. Onsite to witness start of the 72hr. press. build up test "PBUT" being performed on both wells surface x production casing annuli. Upon arrival met with Cabot O&G Reps., Adam, Aaron, Brody and Steve onsite. Both wells surface x production casing annuli were equipped with pressure logging units tied into Cabot's cygnet monitoring system. Adam confirmed communication with loggers through cynet system. These annuli were shut in at 09:15. We will return to site on Thursday, March 22 at 09:15 for conclusion of the 72 hr. PBUT.

Wells pressures were taken off LED readouts mounted at production units. (Prod. Casing Press. = CP, Static Press. = SP, Differential Press. = DP.) Shields, G. 2H: CP = 461.6 psi., SP = 474.4 psi., DP = 25.2 psi. Shields, G. 4H: CP = 473.6 psi., SP = 476.2 psi., DP = 92.4 psi.

No obvious concerns or additional viola

2710033 Primary Facility 2018-03-22 Routine/Complete Inspection No Violations Noted Arrived at location at 09:45. Weather: Clear, cold, ~ 30 degs. Onsite for the conclusion of the 72hr. press. build up test "PBUT" being performed on both wells surface x production casing annuli. The PBUT was started on 3/19/18 at 09:15. Upon arrival met with Cabot O&G Reps., Adam Vogt & Aaron Onks and (3) Selman & Assoc. Reps. Both wells surface x production casing annuli were equipped with pressure logging units tied into Cabot's cygnet monitoring system. The PBUT ending pressures were:

- 2H: (9 5/8"x 5 1/2") = 49 psi. - 4H: (9 5/8"x 5 1/2") = 84 psi. Gas checks performed by the Dept. and Selman showed: 100% CH4. The Dept. and Selman collected gas samples off both these annuli at approx. 09:50. Both wells annuli were bleed down and opened back up to poly vent tank. Post PBUT, water samples were collected at area resident by Eric Rooney, D.E.P. Geologist and Moody & Associates prior to bleeding pressures off of gas wells. - Review of well record for the 4H well showed the 5 1/2" prod. casing cement top was

For data sources see[8]