If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20151 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.713093,"lon":-75.590695,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Clifford Township | |
Operator Name: EXCO RESOURCES PA INC | |
Well Pad ID: 145873 | |
Farm/Lease Name: LOPATOFSKY 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2009-05-07 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.713093 | |
Longitude: -75.590695 |
Date | Event |
---|---|
2009-05-07 | New Permit Application |
2009-07-15 | Performed Spud Operation |
2009-08-13 | Drilling Completion |
2009-11-30 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | EXCO RESOURCES PA INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | EXCO RESOURCES PA INC | Brine | 2,238.00 Bbl | Other | |
2010 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 576.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0027057 |
2010 | EXCO RESOURCES PA INC | Drilling Fluid Waste | 543.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2010 | EXCO RESOURCES PA INC | Fracing Fluid Waste | 8,473.20 Bbl | REUSE OTHER THAN ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1813853 | Primary Facility | 2009-07-01 | Routine/Complete Inspection | No Violations Noted | |
1813855 | Primary Facility | 2009-07-15 | Routine/Complete Inspection | No Violations Noted | |
1817523 | Primary Facility | 2009-07-30 | Drilling/Alteration | No Violations Noted | At time of inspection I met with the Company Man Chester Phillips. The drilling contractor is Union with rig UDI-46.According to Company Man, the drilling contractor was in the process of testing the BOP system the previous day, and inserted the test plug upside down into an 11¿ 5000x 8-5/8 Slip on Wellhead (SOW). As a result, the plug became stuck and could not be retrieved. The contractor had to cut off the wellhead, and at the time of inspection was in the process of installing and testing the new SOW. Once installed, the BOP test will be completed. |
1820611 | Primary Facility | 2009-08-13 | Drilling/Alteration | No Violations Noted | At time of inspection I met with the Company Man Mike Taylor. The drilling contractor is Union Drilling with rig UDI-46. According to Mr. Taylor, depth of drilling was at 8055¿. Mr. Taylor indicated that they were in the process of washing out the hole with mud due to excess shale fragments being generated. Once cleaned out, drilling will resume to a TD of 8065¿. Mr. Taylor further stated that 4-1/2¿ production casing is scheduled to be set at approximately 8055¿. |
1841249 | Primary Facility | 2009-10-02 | Routine/Complete Inspection | No Violations Noted | At time of inspection I met with Mark Goodwin, Completion Supervisor for EXCO. Mr. Goodwin indicated they were in the process of pulling tubing out of the well in order to change out the tools with a ¿jet pack¿. The jet pack will be used to remove the excessive water in the hole and hopefully increase the gas flow. The well was flowing back at a rate of 5 to 6 bbls/hr during inspection. All flowback water was being contained in frac tanks. |
1912359 | Primary Facility | 2010-09-02 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Service rig on location. Well is planned to be plugged. NOI to plug well has been recieved. |
For data sources see[7]