X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20147

Well Details

Well ID: 37-115-20147
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Dimock Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148562
Farm/Lease Name: HUBBARD 6H
License Status:
Spud Date:
Permit Date: 2009-04-27
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.749638
Longitude: -75.874510

For data sources see[1][2][3]

Well History

Date Event
2009-04-27 New Permit Application
2009-05-07 Performed Spud Operation
2009-08-02 Drilling Completion
2009-09-07 Perforation
2009-09-07 Performed Stimulation
2010-10-01 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2009-09-07 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CABOT OIL & GAS CORP 594756.00 107 0.00 0 0.00 0
2010 CABOT OIL & GAS CORP 1,003,815.50 328 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 403,228.00 339 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 219,277.42 330 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 327,238.28 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 244,005.47 348 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 98,493.70 338 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 185,499.02 358 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 154,597.11 362 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 141,716.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 119,448.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 CABOT OIL & GAS CORP Drilling 300.00 Bbl Brine or Industrial Waste Treatment Plt PA0027057
2009 CABOT OIL & GAS CORP Drilling 1,540.00 Bbl Municipal Sewage Treatment Plant PA0026034
2009 CABOT OIL & GAS CORP Drilling 400.00 Bbl Brine or Industrial Waste Treatment Plt PAR9000009
2010 CABOT OIL & GAS CORP Basic Sediment 2.22 Bbl LANDFILL 101534
2010 CABOT OIL & GAS CORP Drill Cuttings 57.80 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 101247
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 190.80 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Produced Fluid 267.26 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Drill Cuttings 16.30 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 1,980.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010 CABOT OIL & GAS CORP Drill Cuttings 94.00 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 114.80 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 1.20 Tons LANDFILL 100955
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 504.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD085690592
2010 CABOT OIL & GAS CORP Drill Cuttings 94.00 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 8-4630-00010/00
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 479.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Basic Sediment 1.48 Bbl LANDFILL 101534
2011 CABOT OIL & GAS CORP Produced Fluid 168.36 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CABOT OIL & GAS CORP Basic Sediment 0.40 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Basic Sediment 0.58 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Produced Fluid 104.76 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CABOT OIL & GAS CORP Produced Fluid 32.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 13.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2013 CABOT OIL & GAS CORP Produced Fluid 54.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 81.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 33.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 3.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 33.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 54.97 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 51.32 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CABOT OIL & GAS CORP Produced Fluid 47.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 106.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 35.21 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 0.26 Tons LANDFILL 101247
2019 CABOT OIL & GAS CORP Produced Fluid 67.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1799552 Primary Facility 2009-05-20 Drilling/Alteration No Violations Noted At time of inspection, no drilling was occurring. Crew was in the process or replacing rams.
1799967 Primary Facility 2009-05-01 Routine/Complete Inspection No Violations Noted
1822424 Primary Facility 2009-08-18 Drilling/Alteration No Violations Noted Rig on site was GDS-15. Chris Loman was company man on site. At time of inspection they wer cementing betwen 4" and 7" casing. Schlumberger on site to do coementing. Mr. Loman indicated they will be pumping 390 sks of 35/65 Pos. cement. There are three pits on site. All three pits had more than the required 2' freeboard.
1833438 Primary Facility 2009-09-25 Follow-up Inspection No Violations Noted An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road.
1845089 Primary Facility 2009-11-10 Follow-up Inspection No Violations Noted I inspected the well head for evidence of leakage. There was no visible bubbling observed. At the time of inspection the well was on-line.
1976042 Primary Facility 2011-05-25 Routine/Complete Inspection No Violations Noted
2481854 Primary Facility 2016-04-27 Routine/Partial Inspection No Violations Noted

The Department was on site at the Hubbard P1 Well Site to conduct a Routine Partial Inspection. At the time of the inspection, the E&S Inspection Log indicated that Mike Brilla (TEC) conducted a Post Rain Event Inspection on 4/27/16. The Department noted that the site appears to meet temporary stabilization requirements.

2516777 Primary Facility 2016-09-01 Site Restoration No Violations Noted The Department was on site to conduct a Notice of Termination (NOT) for the Hubbard G P1

115-20147


The site was constructed according to plan, and there are existing pits located on site. The vegetation was perennial, at or above the 70% vegetative standard and there were no erosional actions occuring at this time. All BMPs have been removed. I recommend APPROVAL of this Notice of Termination.

If there are any questions please feel free to contact me at (570) 346-5539

2674287 Primary Facility 2017-12-22 Administrative/File Review No Violations Noted I approved a restoration report on December 19, 2017 for this well site.

For data sources see[8]

References