If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20147 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.749638,"lon":-75.87451,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148562 | |
Farm/Lease Name: HUBBARD 6H | |
License Status: | |
Spud Date: | |
Permit Date: 2009-04-27 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.749638 | |
Longitude: -75.874510 |
Date | Event |
---|---|
2009-04-27 | New Permit Application |
2009-05-07 | Performed Spud Operation |
2009-08-02 | Drilling Completion |
2009-09-07 | Perforation |
2009-09-07 | Performed Stimulation |
2010-10-01 | DEVIATED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2009-09-07 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 594756.00 | 107 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 1,003,815.50 | 328 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 403,228.00 | 339 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 219,277.42 | 330 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 327,238.28 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 244,005.47 | 348 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 98,493.70 | 338 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 185,499.02 | 358 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 154,597.11 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 141,716.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 119,448.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | Drilling | 300.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0027057 |
2009 | CABOT OIL & GAS CORP | Drilling | 1,540.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2009 | CABOT OIL & GAS CORP | Drilling | 400.00 Bbl | Brine or Industrial Waste Treatment Plt | PAR9000009 |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 2.22 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 57.80 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 190.80 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Produced Fluid | 267.26 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 16.30 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 1,980.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 94.00 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 114.80 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.20 Tons | LANDFILL | 100955 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 504.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD085690592 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 94.00 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 479.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 1.48 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 168.36 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.40 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 0.58 Bbl | LANDFILL | 100081 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 104.76 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 32.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 13.33 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 54.67 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 81.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 33.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 3.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 33.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 54.97 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 51.32 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 47.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 106.27 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 35.21 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Synthetic Liner Materials | 0.26 Tons | LANDFILL | 101247 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 67.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1799552 | Primary Facility | 2009-05-20 | Drilling/Alteration | No Violations Noted | At time of inspection, no drilling was occurring. Crew was in the process or replacing rams. |
1799967 | Primary Facility | 2009-05-01 | Routine/Complete Inspection | No Violations Noted | |
1822424 | Primary Facility | 2009-08-18 | Drilling/Alteration | No Violations Noted | Rig on site was GDS-15. Chris Loman was company man on site. At time of inspection they wer cementing betwen 4" and 7" casing. Schlumberger on site to do coementing. Mr. Loman indicated they will be pumping 390 sks of 35/65 Pos. cement. There are three pits on site. All three pits had more than the required 2' freeboard. |
1833438 | Primary Facility | 2009-09-25 | Follow-up Inspection | No Violations Noted | An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road. |
1845089 | Primary Facility | 2009-11-10 | Follow-up Inspection | No Violations Noted | I inspected the well head for evidence of leakage. There was no visible bubbling observed. At the time of inspection the well was on-line. |
1976042 | Primary Facility | 2011-05-25 | Routine/Complete Inspection | No Violations Noted | |
2481854 | Primary Facility | 2016-04-27 | Routine/Partial Inspection | No Violations Noted |
The Department was on site at the Hubbard P1 Well Site to conduct a Routine Partial Inspection. At the time of the inspection, the E&S Inspection Log indicated that Mike Brilla (TEC) conducted a Post Rain Event Inspection on 4/27/16. The Department noted that the site appears to meet temporary stabilization requirements. |
2516777 | Primary Facility | 2016-09-01 | Site Restoration | No Violations Noted | The Department was on site to conduct a Notice of Termination (NOT) for the Hubbard G P1
115-20147
If there are any questions please feel free to contact me at (570) 346-5539 |
2674287 | Primary Facility | 2017-12-22 | Administrative/File Review | No Violations Noted | I approved a restoration report on December 19, 2017 for this well site. |
For data sources see[8]