Well ID: 37-115-20091 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.733258,"lon":-75.886172,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 148408 | |
Farm/Lease Name: GESFORD 4R | |
License Status: | |
Spud Date: | |
Permit Date: 2009-03-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.733258 | |
Longitude: -75.886172 |
Date | Event |
---|---|
2009-03-12 | New Permit Application |
2009-04-25 | Performed Spud Operation |
2009-06-09 | Drilling Completion |
2009-09-16 | NEWLY DRILLED |
2010-03-23 | Perforation |
2012-11-10 | Performed Stimulation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2012-11-09 | 2012-11-09 | 7,111 | 706,314 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Super TSC LT | Paraffin & Scale Additive | Proprietary | 50.00 | 0.01 | |||
Proprietary | 15.00 | 0.00331500 | ||||||
Water | 7732-18-5 | 60.00 | 0.01 | |||||
Water | Carrier/Base Fluid | 100.00 | 86.94 | |||||
WFR-3B | Friction Reducer | Poly(oxy-1,2-ethanediyl), .alpha.,.alpha.'-[[(9Z)-9-octadecenylimino]di-2,1-ethanediyl]bis[.omega.-hydroxy - |
26635-93-8 | 5.00 | 0.00532500 | |||
Ethoxylated C12-16 alcohols | 68551-12-2 | 15.00 | 0.01 | |||||
Distillates, petroleum, hydrotreated light | 64742-47-8 | 50.00 | 0.05 | |||||
Microparticle | 1.00 | 0.00106500 | ||||||
1,2-Propylene glycol | 57-55-6 | 40.00 | 0.04 | |||||
1,2-Propylene glycol | 57-55-6 | 15.00 | 0.01 | |||||
Water | 7732-18-5 | 40.00 | 0.04 | |||||
PA Specific 40/70 mesh Sand | Sand - Bulk - Pennsylvania | Ferric oxide | 1309-37-1 | 0.10 | 0.01 | |||
Alumina | 1344-28-1 | 1.10 | 0.12 | |||||
Quartz | 14808-60-7 | 99.90 | 11.54 | |||||
Titanium dioxide | 13463-67-7 | 0.10 | 0.01 | |||||
PA Specific 100 mesh Sand | Sand - Bulk - Pennsylvania | Titanium dioxide | 13463-67-7 | 0.10 | 0.00051800 | |||
Alumina | 1344-28-1 | 1.10 | 0.00569800 | |||||
Ferric oxide | 1309-37-1 | 0.10 | 0.00051800 | |||||
Quartz | 14808-60-7 | 99.90 | 0.51 | |||||
Iron Acid 10M (12.6-18.0) | Acid Blend | Hydrochloric acid | 7647-01-0 | 15.80 | 0.09 | |||
Proprietary | 1.20 | 0.00710900 | ||||||
Water | 7732-18-5 | 84.10 | 0.49 | |||||
Acid Inhibitor 2 (AI-2) | Acid Corrosion Inhibitor | Glycol Ethers | 20.00 | 0.00019900 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(nonylphenyl)-omega-hydroxy-
, |
68412-54-4 | 13.00 | 0.00012900 | |||||
Water | 7732-18-5 | 40.00 | 0.00039800 | |||||
Tar bases, quinoline derivatives, benzyl chloride-quaternized |
72480-70-7 | 10.00 | 0.00010000 | |||||
Isopropanol | 67-63-0 | 15.00 | 0.00014900 | |||||
Propargyl alcohol | 107-19-7 | 20.00 | 0.00019900 | |||||
KR-153SL | Biocide | Water | 7732-18-5 | 80.00 | 0.02 | |||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 20.00 | 0.00522300 |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2012-11-10 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 16,018.51 | 28 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 111,264.37 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 63,138.32 | 347 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 40,713.55 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 42,569.70 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 31,656.99 | 363 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 29,057.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 24,864.00 | 362 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | Drilling | 1,500.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0027057 |
2009 | CABOT OIL & GAS CORP | Drilling | 550.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2009 | CABOT OIL & GAS CORP | Drilling | 122.00 Bbl | Brine or Industrial Waste Treatment Plt | PAR9000009 |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 1.85 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 48.80 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101247 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 161.10 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 13.80 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 79.40 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 97.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.00 Tons | LANDFILL | 100955 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 79.40 Tons | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 8-4630-00010/00 |
2012 | CABOT OIL & GAS CORP | Basic Sediment | 3.99 Bbl | LANDFILL | THR029 |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 840.58 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2012 | CABOT OIL & GAS CORP | Produced Fluid | 507.29 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 840.58 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 55.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 165.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 10.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2013 | CABOT OIL & GAS CORP | Produced Fluid | 571.55 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 318.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 31.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2015 | CABOT OIL & GAS CORP | Produced Fluid | 3.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 4.06 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2016 | CABOT OIL & GAS CORP | Produced Fluid | 2.91 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 2.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 3.56 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2018 | CABOT OIL & GAS CORP | Produced Fluid | 23.47 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 2.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1793057 | Primary Facility | 2009-04-27 | Drilling/Alteration | Violation(s) Noted | An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road. At the time of inspection, the driller indicated that 13 3/8" surface casing was set at 153' and cemented. Drill crew was nippling up on the 13 3/8" to start drilling 12 1/4" hole. |
1796220 | Primary Facility | 2009-05-01 | Drilling/Alteration | Viol(s) Noted & Immediately Corrected | On May 1, 2009 a spill of approximately 25 gallons of diesel fuel was released on Site. |
1796223 | Primary Facility | 2009-05-05 | Drilling/Alteration | No Violations Noted | At the time of inspection, the drillers log was properly filled out. As a result, the violation issued during the April 27, 2009 inspection has been lifted. |
1799556 | Primary Facility | 2009-05-20 | Drilling/Alteration | No Violations Noted | E/S Plan on site, Site ID sign on site. All E/S controls in place and appear to be working. |
1799639 | Primary Facility | 2008-12-08 | Routine/Complete Inspection | No Violations Noted | |
1799909 | Primary Facility | 2009-05-01 | Routine/Complete Inspection | No Violations Noted | |
1803454 | Primary Facility | 2009-06-03 | Drilling/Alteration | No Violations Noted | E/S Plan on site, Site ID sign on site. All E/S controls in place and appear to be working. The large pit had approximately 4' of freeboard during inspection. Drillers log was on site and filled out properly. According the company man, they had drilled to TD of 7120'. Upon trying to trip out of the hole, the drill pipe got stuck due to the hole collapsing in near TD. The company man indicated they eventually were able to free the pipe and trip out of the hole. At the time of inspection, the crew was circulating mud in the hole with the use of a Superior pump truck in an effort to clean out the hole prior to setting the 4-1/2" casing. I indicated to the company man to watch the freeboard in the pit they were using to circulate mud as it was getting close to freeboard limits. I also observed a skid containing several 55 gallon drums was full of rainwater. I suggested to the company man to have that pumped out to prevent a future spill. |
1804787 | Primary Facility | 2009-06-11 | Follow-up Inspection | Violation(s) Noted | At time of inspection, drill rig and crew were offsite. No activity on site. The freeboard in the earth pit was approximately 3 - 6" from the top of the pit. It appears that some of the drilling mud had spilled out of the end of the pit onto the pad as evident from a large puddle of mud. |
1804893 | Primary Facility | 2009-06-12 | Follow-up Inspection | Outstanding Violations - Viols Req'd | Arrived on Site 8:00 am to complete follow up inspection on earthpit. I had spoken with Safety and Environmental officer for GasSearch on 06.11.09 about the freeboard issue at the site. I also spoke with one of Cabot's Company Man regarding the issue. A call was made at that time by the Co. man to the trucking coordinator to arrange to have the liquid removed from the pits at the Site. Upon arrival this morning to site, it appeared that one end of the earth pit has been pumped down approximately 12", however, freeboard is still above 2' limit. The other end of earthpit has between 3 - 6" of freeboard. |
1806238 | Primary Facility | 2009-06-18 | Routine/Complete Inspection | Violation(s) Noted | Follow-up inspection, MO'D & SW, contents of earth pit removed and liner revealed numerous tears, reserve pit condition same as previously observed with tear in pit liner and inadequate freeboard. |
1811450 | Primary Facility | 2009-07-10 | Follow-up Inspection | No Violations Noted | Arrived on site to complete follow up inspection of earth pit and reserve pit issues noted on DEP NOV letter issued 6/29/09 regarding freeboard and pit liner issues. At the time of inspection, the smaller pit had been cleaned up and removed, and filled and graded back to pad level. the larger reserve pit has been reshaped with higher sidewalls extending approximately 3' above pad level. The pit has been relined with a new liner. A shallower pit has been installed adjacent the new reserve pit which will be the location for the shaker unit. This pit has also been lined with a new liner. |
1833421 | Primary Facility | 2009-09-25 | Follow-up Inspection | No Violations Noted | An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road. |
1845070 | Primary Facility | 2009-11-10 | Follow-up Inspection | No Violations Noted | I inspected the well head for evidence of leakage. There was no standing water present in the cellar and no visible bubbling observed. The well is currently shut in. |
1845625 | Primary Facility | 2009-11-04 | Routine/Complete Inspection | No Violations Noted | |
1864357 | Primary Facility | 2010-02-17 | Routine/Complete Inspection | No Violations Noted | Inspected well as per DEP COA issued to Operator. Operator planning to frac. Based in DEP inspection, no violations were observed. |
1960363 | Primary Facility | 2011-03-22 | Routine/Complete Inspection | Violation(s) Noted | |
1981733 | Primary Facility | 2011-06-14 | Follow-up Inspection | No Violations Noted | |
2007759 | Primary Facility | 2011-09-02 | Routine/Complete Inspection | Violation(s) Noted | Adequate company response submitted 11/13/2013. |
2119420 | Primary Facility | 2012-11-21 | Routine/Complete Inspection | No Violations Noted | well has been HF 3100# on well |
2121471 | Primary Facility | 2012-11-08 | Incident- Response to Accident or Event | No Violations Noted | The Department was on site in response to a self-reported release. At the time of the inspection, the Department met with two Nahbors employees who were unaware of the release. The Department requested that they contact a Cabot employee concerning the inspection. The Department then met with Rafael Rodriguez (Completions Consultant- Cabot Oil & Gas). At this time Rafael explained that on 11/7/12 at 21:30 that a low pressure suction manifold on a pump truck came apart. It was reported that 20 bbl. were released to containment. It was initially determined that the release was “slick water” or freshwater mixed with friction reducer. This was noted to have occurred during Stage 12 pad. They are currently on Stage 15 of 17.Brody Webster of Cabot Oil & Gas arrived on site.Brody stated that they used a 100 bbl. vacuum truck to remove the liquid. A swath of sand was noted alongside the truck. |
2136392 | Primary Facility | 2013-02-05 | Routine/Complete Inspection | No Violations Noted | On site to do routine inspection. Two wells on site (4V and 8H). Both wells in production. Annuli vented. Gauges on backside of production shows 0 psi. Well tag present. Site ID sign in place. Site has been restored. No violations observed at this time. |
2139928 | Primary Facility | 2013-02-14 | Follow-up Inspection | No Violations Noted | On site to collect pressure reading and isotopic gas sample from annulus of well. DEP reps on site = Steve Watson, Eric Rooney, and Gene Rickard. DEP met John Smelko of Cabot on site. Selman reps on site to assist with collecting gas readings and to split gas samples. Cabot shut in annulus on well @ 9am this morning. A digital gauge was installed on 7 5/8" x 4 1/2" annulus. Pressure indicated 0 psi. Gauge was removed and open vent flow was screened using Model 60 gas meter. Reading was 4% combustible gas. DEP and Cabot collected samples for isotopic analysis. The pressure gauge was then installed on the 9 5/8" x 7" annulus. Pressure reading was 0 psi. Model 60 reading was 1.5% combustible gas. DEP and Cabot collected samples for isotopic analysis. After competion of sampling, Cabot re-connected vent lines and locked vents open. |
2344215 | Primary Facility | 2015-02-11 | Complaint Inspection | No Violations Noted | The Department (Scott Kuchta-DEP WQS and I) was on site at the Gesford 4 & 8 well site in response to a complaint (2/7/15) concerning venting from the production tanks. At the time of the inspection, no venting was noted. The Department inspected the snow covered area around the tanks to check for indications of a fluid release. No evidence of released fluid was noted. |
2509186 | Primary Facility | 2016-08-04 | Complaint Inspection | No Violations Noted | At time of inspection, arrived on site at 12:05p.m. pertaining to a complaint called into the department about a backhoe and a dumpster being hauled onto the site and unknown activity. There was no activity on this site at time of inspection. There was no backhoe on site but there were two role off containers on the Castello J Pad 1 site. The marks on the entrance road indicated that the containers have recently been dropped off.
I left the site at 12:10p.m. |
2642900 | Primary Facility | 2017-10-02 | Site Restoration | No Violations Noted | I inspected the Gesford K, P4 site on October 2, 2017 to conduct a Notice of Termination (NOT) inspection.
The site was compact and well maintained. The access road was solid and stable. The pad surface was solid as well. The cut and fill slopes exceeded the 70% vegetative standard. On the east side of the pad, active agriculture was ongoing (field corn). There was no erosional issues apparent at the time of inspection. I recommend APPROVAL of this NOT. There were no violations noted. |
2672710 | Primary Facility | 2017-12-19 | Administrative/File Review | No Violations Noted | I approved a restoration report on December 19, 2017 for this well site. |
2677351 | Primary Facility | 2017-12-20 | Incident- Response to Accident or Event | Viol(s) Noted & Immediately Corrected | I arrived at the site in response to a reported spill of production fluid to the pad surface on 12-14-17. I was accompanied by Matt Shope, DEP O&G WQS. We met with Jordan Hoffman, lease operator of Cabot. The weather conditions were partly cloudy skies with a light breeze, occasional wind gusts, and temperatures in the mid 30's. I was first informed of the release on 12-19-17. I contacted Steve Watson, Environmental Health Specialist of Cabot Oil & Gas on 12-19-17 at 13:29 to acquire the specifics of the spill incident. He explained the following details regarding the spill. "The spill occurred at the Gesford 4 pad on State Route 3023 in Dimock. The above ground dump line froze as part of the Gesford 8H well. A flange fitting on the line separated spilling production fluid to the pad surface around 8:30 PM on 12/14/17. I reported the spill to the PADEP Emergency Response Team in NERO at 9:20 PM on 12/14/17. Soap sticks were added into the well on 12/13/17 to help lift the water in the gas since it is an old |
2677768 | Primary Facility | 2017-12-20 | Incident- Response to Accident or Event | No Violations Noted | I arrived at the site in response to a reported spill of production fluid to the pad surface on 12-14-17. I was accompanied by Matt Shope, DEP O&G WQS. We met with Jordan Hoffman, lease operator of Cabot. The weather conditions were partly cloudy skies with a light breeze, occasional wind gusts, and temperatures in the mid 30's. I was first informed of the release on 12-19-17. I contacted Steve Watson, Environmental Health Specialist of Cabot Oil & Gas on 12-19-17 at 13:29 to acquire the specifics of the spill incident. He explained the following details regarding the spill. "The spill occurred at the Gesford 4 pad on State Route 3023 in Dimock. The above ground dump line froze as part of the Gesford 8H well. A flange fitting on the line separated spilling production fluid to the pad surface around 8:30 PM on 12/14/17. I reported the spill to the PADEP Emergency Response Team in NERO at 9:20 PM on 12/14/17. Soap sticks were added into the well on 12/13/17 to help lift the water in the gas since it is an old |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1793057 | 561525 | 04/27/2009 | 2009-04-27 | 78.122 - Drillers Log not on site | Administrative | 5/5/09 inspection, ID 1796223, found the drillers log was properly filled out. As a result, the violation issued during the 4/27/09 inspection has been lifted. MBC 5/20/09 |
1796220 | 564479 | 05/01/2009 | 2009-05-01 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | 78.54 |
1804787 | 564743 | 06/11/2009 | 2009-06-11 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative | See Insp ID 1811450 done 7/10/09, all past viols corrected. MBC 8/12/09 |
1804787 | 565124 | 06/11/2009 | 2009-06-11 | 78.56LINER - Improperly lined pit | Administrative | See Insp ID 1811450 done 7/10/09, all past viols corrected. MBC 8/12/09 |
1804893 | 564749 | 06/12/2009 | 2009-06-12 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative | See Insp ID 1811450 done 7/10/09, all past viols corrected. MBC 8/12/09 |
1806238 | 565115 | 06/18/2009 | 2009-06-18 | 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment | Administrative | See Insp ID 1811450 done 7/10/09, all past viols corrected. MBC 8/12/09 |
1960363 | 607484 | 03/22/2011 | 2011-03-22 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1960363 | 607485 | 03/22/2011 | 2011-03-22 | 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. | Administrative | |
2007759 | 621405 | 09/02/2011 | 2011-09-02 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | Adequate company response submitted 11/13/2013. |
2007759 | 621406 | 09/02/2011 | 2011-09-02 | 691.1 - Clean Streams Law-General. Used only when a specific CLS code cannot be used | Administrative | Adequate company response submitted 11/13/2013. |
2007759 | 621407 | 09/02/2011 | 2011-09-02 | 78.57 - Failure to post pit approval number | Administrative | Adequate company response submitted 11/13/2013. |
2677351 | 805073 | 2017-12-20 | 2017-12-20 | CSL 402(b) | Environmental Health & Safety | The violation is cited due to the 12-14-17 production fluid spill impacting the pad surface. |
2677351 | 805074 | 2017-12-20 | 2017-12-20 | 78A57(A)___ | Environmental Health & Safety | The violation is cited due to the 12-14-17 production fluid spill impacting the pad surface. |
2677351 | 805075 | 2017-12-20 | 2017-12-20 | SWMA 301 | Environmental Health & Safety | The violation is cited due to the 12-14-17 production fluid spill impacting the pad surface. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
561525 | 246812 | NOV - Notice of Violation | Comply/Closed | 2009-05-05 | |||
564743 | 247540 | NOV - Notice of Violation | Comply/Closed | 2009-07-10 | |||
565124 | 247540 | NOV - Notice of Violation | Comply/Closed | 2009-07-10 | |||
564749 | 247540 | NOV - Notice of Violation | Comply/Closed | 2009-07-10 | |||
565115 | 247540 | NOV - Notice of Violation | Comply/Closed | 2009-07-10 |