If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20043 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.728308,"lon":-75.885294,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Dimock Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 145872 | |
Farm/Lease Name: COSTELLO 2 | |
License Status: | |
Spud Date: | |
Permit Date: 2008-04-30 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.728308 | |
Longitude: -75.885294 |
Date | Event |
---|---|
2008-04-30 | New Permit Application |
2008-08-16 | Performed Spud Operation |
2008-10-28 | Drilling Completion |
2009-01-11 | Perforation |
2009-01-11 | Performed Stimulation |
2010-11-15 | NEWLY DRILLED |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2009-01-11 | 0 | 0 | 0 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | 65460.00 | 246 | 0.00 | 0 | 0.00 | 0 |
2010 | CABOT OIL & GAS CORP | 48,959.00 | 340 | 0.00 | 0 | 0.00 | 0 |
2011 | CABOT OIL & GAS CORP | 19,254.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | CABOT OIL & GAS CORP | 17,601.00 | 320 | 0.00 | 0 | 0.00 | 0 |
2013 | CABOT OIL & GAS CORP | 20,654.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CABOT OIL & GAS CORP | 19,254.00 | 232 | 0.00 | 0 | 0.00 | 0 |
2015 | CABOT OIL & GAS CORP | 17,376.00 | 323 | 0.00 | 0 | 0.00 | 0 |
2016 | CABOT OIL & GAS CORP | 15,277.00 | 265 | 0.00 | 0 | 0.00 | 0 |
2017 | CABOT OIL & GAS CORP | 15,165.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2018 | CABOT OIL & GAS CORP | 11,982.00 | 329 | 0.00 | 0 | 0.00 | 0 |
2019 | CABOT OIL & GAS CORP | 12,139.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2009 | CABOT OIL & GAS CORP | Fracking Fluid | 750.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0027057 |
2009 | CABOT OIL & GAS CORP | Fracking Fluid | 1,000.00 Bbl | Brine or Industrial Waste Treatment Plt | PAR9000009 |
2009 | CABOT OIL & GAS CORP | Fracking Fluid | 4,840.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2009 | CABOT OIL & GAS CORP | Drilling | 3,874.00 Bbl | Municipal Sewage Treatment Plant | PA0026034 |
2009 | CABOT OIL & GAS CORP | Fracking Fluid | 1,196.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0008451 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 79.60 Tons | LANDFILL | 8-4630-00010/00 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 161.60 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR119 |
2010 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 2,420.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | CABOT OIL & GAS CORP | Basic Sediment | 1.85 Bbl | LANDFILL | 101534 |
2010 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 97.30 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 48.90 Tons | LANDFILL | 101247 |
2010 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 972.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0008451 |
2010 | CABOT OIL & GAS CORP | Produced Fluid | 32.83 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 13.80 Tons | LANDFILL | NY # 50S08 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 79.60 Tons | LANDFILL | NY # 02S17 |
2010 | CABOT OIL & GAS CORP | Fracing Fluid Waste | 500.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PAD085690592 |
2010 | CABOT OIL & GAS CORP | Drill Cuttings | 1.00 Tons | LANDFILL | 100955 |
2011 | CABOT OIL & GAS CORP | Basic Sediment | 0.33 Bbl | LANDFILL | 101534 |
2011 | CABOT OIL & GAS CORP | Produced Fluid | 69.03 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011 | CABOT OIL & GAS CORP | Drilling Fluid Waste | 240.52 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 105.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE002 |
2014 | CABOT OIL & GAS CORP | Produced Fluid | 85.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NE001 |
2017 | CABOT OIL & GAS CORP | Produced Fluid | 37.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019 | CABOT OIL & GAS CORP | Produced Fluid | 33.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1728614 | Primary Facility | 2008-07-30 | Routine/Complete Inspection | Violation(s) Noted | |
1728902 | Primary Facility | 2008-08-06 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
1731748 | Primary Facility | 2008-08-20 | Drilling/Alteration | No Violations Noted | |
1748733 | Primary Facility | 2008-11-04 | Routine/Complete Inspection | No Violations Noted | |
1765554 | Primary Facility | 2009-01-20 | Routine/Complete Inspection | No Violations Noted | |
1765555 | Primary Facility | 2009-01-21 | Routine/Complete Inspection | No Violations Noted | |
1768996 | Primary Facility | 2009-02-02 | Routine/Complete Inspection | No Violations Noted | |
1768998 | Primary Facility | 2009-02-03 | Routine/Complete Inspection | No Violations Noted | |
1769001 | Primary Facility | 2009-02-09 | Routine/Complete Inspection | No Violations Noted | |
1769003 | Primary Facility | 2009-02-10 | Routine/Complete Inspection | No Violations Noted | |
1774895 | Primary Facility | 2009-02-18 | Administrative/File Review | Violation(s) Noted | |
1833428 | Primary Facility | 2009-09-25 | Follow-up Inspection | No Violations Noted | An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road. |
1890411 | Primary Facility | 2010-05-24 | Routine/Complete Inspection | No Violations Noted | |
1946686 | Primary Facility | 2011-01-25 | Drilling/Alteration | No Violations Noted | Larry Arnold - company man. Scott Wurth on site overseeing pressure testing and setting up chart recorder. Stone Service rig over well. tunning 24 hr pressure test on 5 1/2 x 8 5/8" annulus. Mr. Arnold said vent is open and no pressure detected. Started recording at 10:30 am. using 300 psi stack. |
1949471 | Primary Facility | 2011-01-26 | Follow-up Inspection | No Violations Noted | Followed up on complaint of posible spill on site. i inspected site and spoke to crew on location. There was no visible evidence of a gas leak or spill of any material. Secondary containment was in place under the service rig and bermed. Based on my investigation there was no violation observed. |
1960288 | Primary Facility | 2011-03-22 | Routine/Complete Inspection | Violation(s) Noted | |
1972938 | Primary Facility | 2011-05-12 | Follow-up Inspection | No Violations Noted | |
2051014 | Primary Facility | 2012-03-13 | Site Restoration | No Violations Noted | |
2139923 | Primary Facility | 2013-02-14 | Follow-up Inspection | No Violations Noted | On site to collect pressure reading and isotopic gas sample from annulus of well. DEP reps on site were Steve Watson, Eric Rooney, and Gene Rickard. DEP met with Mr. John Smelko of Cabot. Selman reps on site to assist in gas readings and split gas samples. A digital pressure gauge was installed by Cabot on 8 5/8 x 5 1/2" annulus. Pressure indicated was 0 psi. Gauge was removed and open vent flow was screened using Model 60. Reading was 3% combustible gas. Both DEP and Cabot collected gas samples for isotopic analysis. After completion of sampling, Cabot re-connected vent line and locked vent open. |
2319458 | Primary Facility | 2014-11-05 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived at site at: 12:00 hrs. Onsite to perform routine inspections of wells / wellsites and document signage present at both Costello well pads. (Pad #1 and 2) On the Costello Pad #2: The 2V well is only well drilled on pad and was in production at time of inspection. No pressure gauges were accessible at wellhead or GPU at time of inspection. 2V well had (2) annular vents present and labeled, (8 5/8" x 5 1/2") and (5 1/2" x 2 3/8"). Both vents were open and venting to onsite poly vent tank. LEL check at vent tank opening showed 0 % LEL. Well cellar was full of gravel at time of insp. No obvious concerns were noted at wellhead or wellsite. Well tags and Entry signage were in place and up to date for both pads. |
2398207 | Primary Facility | 2015-08-13 | Routine/Complete Inspection | No Violations Noted | |
2422080 | Primary Facility | 2015-10-21 | Site Restoration | No Violations Noted | Inspection of the Costello J P2 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit. |
2497395 | Primary Facility | 2016-06-29 | Routine/Complete Inspection | No Violations Noted | At time of inspection, arrived on site at 8:50a.m., the cellar was full of gravel with no gas detected at the perimeter of the cellar, the (8x5) vent pipe was open and venting to a tank, the (5x2) vent pipe was open and venting to a tank, there was 519psi on the production tubing. I took a walk around the location and everything looked OK.
I left the site at 9:15a.m. |
2509182 | Primary Facility | 2016-08-04 | Complaint Inspection | No Violations Noted | At time of inspection, arrived on site at 12:45p.m. pertaining to a complaint called into the department about a backhoe and a dumpster being hauled onto the site and unknown activity. There was no activity on this site at time of inspection. There was no backhoe on site but there were two role off containers on the Castello J Pad 1 site. The marks on the entrance road indicated that the containers have recently been dropped off.
I left the site at 12:50p.m. |
2638662 | Primary Facility | 2017-09-21 | Routine/Complete Inspection | No Violations Noted | Arrived at site at 11:00. Weather: sunny, warm ~ 80 degs. Onsite in response to area resident report of heavy activity occurring on pad. Upon arrival I spoke with Cabots electrical contractor in supply trailer. He confirmed that over the last week or so Cabot had been updating the wells remote data capture devices and sending unit. He stated that these updates have been completed and he will be moving the supplies trailer to next location today. Further observations of location showed that a new containment structure has been installed beneath a newly installed production tank. Old production tank was at side of location and will be removed shortly. Several new precast concrete barriers have been installed to protect newly plumbed 2" production water piping ran to new production tank.
Inspection of the Costello 2V well showed that well was lined up for automated production. Well was not producing at time of inspection. Annular vents for the (8 5/8"x 5 1/2") and (5 1/2"x 2 3/8") annuli were open and venting, |
2749438 | Primary Facility | 2018-07-05 | Complaint Inspection | No Violations Noted | - Arrived on location at: 08:45. Onsite in response to complaint #335360 received yesterday 7/4/18 at ~ 4:58pm. Complainant stated: GDS Vac truck labeled "Residual Waste" just drove onto Costello #2 Pad. Truck entered full and left empty." Complainant was concerned that illegal dumping or spill had occurred.
- Upon my arrival, I took note and pictures of truck tire tracks which indicated previous truck activity, pulling onto pad and backing up to access wells Production tank and secondary containment around Production tank. (See attached pics) At time of inspection the liquid level in Production tank was approx. 1/4 full. The water level in secondary containment area was ~ 6" deep. I thoroughly checked banks along the edge of pad, along entire length of access road to Costello #2 Pad and wooded area along low side of access road for any evidence of an illegal discharge or release run off. No signs of a recent release were noted at any areas checked. - Prior to leaving pad, a GasSearch Drilling Services "GDS" |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1728614 | 545574 | 07/30/2008 | 2008-07-30 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | 102.4(b)(2) |
1728614 | 545575 | 07/30/2008 | 2008-07-30 | 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used | Administrative | 102.22 |
1774895 | 557993 | 02/18/2009 | 2009-02-18 | 212WELLRCD - Failure to submit well record within 30 days of completion of drilling | Administrative | |
1960288 | 607466 | 03/22/2011 | 2011-03-22 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | Environmental Health & Safety | |
1960288 | 607467 | 03/22/2011 | 2011-03-22 | 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
545574 | 238371 | NOV - Notice of Violation | Comply/Closed | 2008-11-04 | |||
545575 | 238371 | NOV - Notice of Violation | Comply/Closed | 2008-11-04 | |||
557993 | 244244 | NOV - Notice of Violation | Superseded | 2010-04-15 | |||
557993 | 252129 | COA - Consent Order and Agreement | Superseded | 2010-04-15 | $120,000.00 | $120,000.00 |
For data sources see[8]