37-115-20041

Well Details

Well ID: 37-115-20041
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Dimock Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148289
Farm/Lease Name: ELY 6H
License Status: ACTIVE
Spud Date:
Permit Date: 2008-04-16
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.724239
Longitude: -75.871352

For data sources see[1][2][3]

Well History

Date Event
2008-04-16 New Permit Application
2008-04-18 Performed Spud Operation
2008-08-11 Drilling Completion
2008-10-01 Perforation
2008-10-01 Performed Stimulation
2009-02-27 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2008-10-01 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 CABOT OIL & GAS CORP 46678.00 67 0.00 0 0.00 0
2009 CABOT OIL & GAS CORP 1224063.00 365 0.00 0 0.00 0
2010 CABOT OIL & GAS CORP 575,016.50 358 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 180,645.89 268 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 180,248.72 360 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 165,673.09 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 193,356.24 358 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 218,304.34 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 140,683.80 365 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 147,130.60 362 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 110,275.00 310 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 120,156.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 CABOT OIL & GAS CORP Brine 1,144.00 Bbl Municipal Sewage Treatment Plant PA0026034
2009 CABOT OIL & GAS CORP Drilling 2,154.00 Bbl Municipal Sewage Treatment Plant PA0026034
2010 CABOT OIL & GAS CORP Basic Sediment 2.22 Bbl LANDFILL 101534
2010 CABOT OIL & GAS CORP Drill Cuttings 52.90 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 101247
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 174.70 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Produced Fluid 111.98 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Drill Cuttings 15.00 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drill Cuttings 86.10 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 105.20 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 1.10 Tons LANDFILL 100955
2010 CABOT OIL & GAS CORP Drill Cuttings 86.10 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 8-4630-00010/00
2011 CABOT OIL & GAS CORP Basic Sediment 0.11 Bbl LANDFILL 101534
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 185.97 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 323.08 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Produced Fluid 26.92 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 21.51 Tons LANDFILL 100945
2012 CABOT OIL & GAS CORP Basic Sediment 0.47 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Produced Fluid 40.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CABOT OIL & GAS CORP Produced Fluid 23.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 27.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 70.07 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 3.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 51.46 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 89.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 129.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Servicing Fluid 200.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Synthetic Liner Materials 2.88 Tons LANDFILL 101247
2018 CABOT OIL & GAS CORP Servicing Fluid 14.07 Tons LANDFILL 100933
2019 CABOT OIL & GAS CORP Produced Fluid 62.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1703774 Primary Facility 2008-04-23 Drilling/Alteration Violation(s) Noted
1703801 Primary Facility 2008-04-29 Drilling/Alteration Outstanding Violations - No Viols Req'd
1705371 Primary Facility 2008-05-06 Drilling/Alteration Outstanding Violations - No Viols Req'd
1713946 Primary Facility 2008-06-03 Routine/Complete Inspection Violation(s) Noted
1716898 Primary Facility 2008-06-26 Routine/Complete Inspection No Violations Noted
1723010 Primary Facility 2008-07-24 Drilling/Alteration No Violations Noted
1733021 Primary Facility 2008-08-06 Drilling/Alteration No Violations Noted
1738430 Primary Facility 2008-09-03 Routine/Complete Inspection Violation(s) Noted
1741058 Primary Facility 2008-09-16 Drilling/Alteration Outstanding Violations - No Viols Req'd
1748732 Primary Facility 2008-11-04 Routine/Complete Inspection No Violations Noted
1752410 Primary Facility 2008-11-20 Routine/Complete Inspection No Violations Noted
1753553 Primary Facility 2008-11-24 Routine/Complete Inspection No Violations Noted
1755668 Primary Facility 2009-01-06 Routine/Complete Inspection No Violations Noted
1764300 Primary Facility 2009-01-20 Routine/Complete Inspection No Violations Noted
1764301 Primary Facility 2009-01-21 Routine/Complete Inspection No Violations Noted
1774900 Primary Facility 2009-02-18 Administrative/File Review Violation(s) Noted
1799657 Primary Facility 2008-12-09 Routine/Complete Inspection No Violations Noted
1833459 Primary Facility 2009-09-25 Follow-up Inspection No Violations Noted An existing road was used to access the well site. The road and drill pad are stoned with limestone. The Site ID sign and E/S Plan were present at the entrance of the access road.
1845081 Primary Facility 2009-11-10 Follow-up Inspection No Violations Noted I inspected the well head for evidence of leakage. There was no standing water present and no visible bubbling observed. The base of the well was filled in with P-gravel to ground level.
1956795 Primary Facility 2011-02-18 Drilling/Alteration No Violations Noted Met with Co. man on site. Stone Service Rig. Squeeze cement in 7 x 8-3/4" annulus. 46 - 1725'. Killed well and then pulled 2 3/8" tubing. Set a RBP in 4 1/2" prod. string at 5000'. Dumped in 50' of sand on top of plug and filled hole with freshwater. Truied to freepoint 4 1/2" but could not move the A section. Have service company coming to get A section free. Perforated 7" casing 4 shots/ft (8 total shots) then will do another squeeze at top of zone 9460'). cementing with Class ! with gas block/latex from 460-1725'.
1960381 Primary Facility 2011-03-16 Drilling/Alteration No Violations Noted Stone Service Rig on site. Running 4 1/2" casing back in hole. Set patch in 4 1/2" at 2530'. Weill be testing shortly to 3000 lbs. If test ok, then will run tubing and install well head. Completed three individual perforation/squeeze jobs. Each one did not show any injectivity. Secondary containment in place.
1973731 Primary Facility 2011-05-13 Site Restoration No Violations Noted
2124146 Primary Facility 2012-12-12 Complaint Inspection No Violations Noted Please refer to the Ely 4H 12-12-12 inspection report for details. Permit number is 115-20034.
2436220 Primary Facility 2015-12-22 Site Restoration No Violations Noted Inspection of the Ely K P3 Well Pad in response to a submitted Notice of Termination request for the Erosion and Sedimentation Control Permit.
2490163 Primary Facility 2016-06-01 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 12:20 p.m., the cellar was full of gravel with no gas detected at the perimeter of the cellar, the (9x7) vent pipe was open and venting to a tank, the (7x4) vent pipe was open and venting to a tank, there was 559psi on the production casing. I took a walk around the location and everything looked OK.

I left the site at 1:15 p.m.

2629142 Primary Facility 2017-08-22 Routine/Complete Inspection No Violations Noted Arrived at location at: 09:00. There are (2) wells currently on this pad, the Ely, K 4V and 6H wells. Upon arrival I spoke with Cabot O&G Rep., Brian Pert, a Meter Tech Trainee. Brian informed that He and other Meter Techs. were in the process of retrofitting all the existing producing wells on all (3) of the Ely, K Pads (1, 2 & 3) with updated metering and Pad layouts. This work should be completed on all (3) Pads in next few weeks.
 Upon inspection of the Ely 4V and 6 H wells, both wells were set-up for automated production. Neither wells were producing at time of inspection. Both wells annuli, the (9 5/8"x 7") & (7"x 4 1/2") were open and venting to a small, shared vent tank via a common vent pipe. A gas check performed at the open top of vent tank showing 4% methane detected. A follow-up inspection will be arranged with Cabot to separate vent lines and perform individual annuli gas checks to confirm source of venting gas. 
 Both wells prod casing annuli were shut in and prod. Trees were lined up to pro
2632362 Primary Facility 2017-08-29 Routine/Complete Inspection No Violations Noted On location to perform gas checks at the Ely 4V and 6H wells annuli prior to starting a 48 Hr PBUT on these two wells. The 4V and 6H wells (9 5/8"x 7") and (7"x 4 1/2") have been separated and individually vented to onsite vent tanks. (2) Cabot Field techs and (2) Selman and Associates techs were onsite to initiate 48 hr. PBUT. At ~ 09:15 initial gas checks were performed. The Depts gas checks were performed using an Altair 5X gas meter calibrated on 8/17/17. The Depts initial gas checks showed:

- Ely 4V: (9x7)= 0% gas, Peak 10% LEL diminishing to 0% LEL; (7x4)= 100% gas, 100% LEL. - Ely 6H: (9x7)= 0% gas, Peak 20% LEL diminishing to 0% LEL; (7x4)= 0% gas, 0% LEL.

  Cabot Field techs shut both wells (9x7) and (7x4) annuli in at ~ 09:30. PBUT pressure will be recorded through test period via Total Flow Control Unit. Both wells will remain lined up for automated production throughout test period.
  We will return to conclude PBUT on 8/31/17 @ ~ 10:00.
2726658 Primary Facility 2018-05-04 Routine/Complete Inspection No Violations Noted Arrived on location at 09:30. Weather: Light rain, mild ~ 65 degs. Onsite to witness the start of 72 hr. PBUT to be performed on the Ely 6H well. Upon arrival, Both wells, the Ely 4H & 6H wells were in production. Both wells (9 5/8"x 7") & (7"x 4 1/2") annular vents were open and venting to separate poly vent tanks. Gas checks performed at both wells vent tanks showed:

- 4H: (9x7) = 0% LEL, 0% CH4; (7x4) = 4% LEL, 0% CH4 - 6H: (9x7) = 0% LEL, 0% CH4; (7x4) = 100% LEL, 100% CH4 Both wells Prod. Casing, Static and Differential pressure were being monitored by Cygnet monitoring system. Each wells pressures were collected off LED read outs by gas production units "GPU". Both wells pressures are listed below: (Prod. Casing Press. = "PCP"; Static Press. = "SP"; Differential Press. = "DP") - 4H: PCP = 484.4 psi.; SP = 491.3 psi.; DP = 69.8 psi. - 6H: PCP = 470.2 psi.; SP = 494.6 psi.; DP = 147.2 psi. Cabot O&G Reps. Jeremy Rapp and Steven Catalfamo arrived onsite at ~ 09:50. The 6Hs annuli vents were shut in at 10:

2727173 Primary Facility 2018-05-07 Routine/Complete Inspection No Violations Noted Arrived on location at 09:30. Weather: Overcast, mild ~ 55degs. Onsite to conclude the 72 hr. Pressure build-up test ¿PBUT¿ being performed on the Ely 6H well. This wells (9 5/8"x 7") & (7"x 4 1/2") were SI on 5/4/18 @ 10:00. Upon arrival, I met with Cabot O&G Reps., Jeremy Rapp and Steven Catalfamo; Selma & Assoc. Rep., Matt Went; D.E.P. Geologist, Eric Rooney; D.E.P. WQS Supervisor, Brianna Cunningham and WQS, Casey Baldwin.

- At 10:00 the ending pressures were checked with digital gauge and recorded. (9x7) = 0.0 psi.; (7x4) = 84.4 psi. Gas checks performed at each annuli showed: (9x7) = 0% LEL, 0% CH4; (7x4) = 100% LEL, 100% CH4. Gas samples were collected off the (7x4) annulus by the Dept. and Selma & Assoc. at ~ 10:00. Samples will be sent out for laboratory analysis. At conclusion of sampling, both these annuli were opened up to vent to separate poly vent tanks. - The presence of venting gas and pressure build-up detected in the 6H wells (7"x 4 1/2") annulus appears to be indicative of Defective Cement

2754772 Primary Facility 2018-07-23 Routine/Complete Inspection No Violations Noted Arrived on location at 10:15. Weather: Overcast, rain ~ 75 degs. Onsite to conclude the 72 hr. Pressure build-up test ¿PBUT¿ being performed on the Ely 6H wells (7"x 4 1/2") annulus. This PBUT is being performed to assess the recent remedial activities performed on this well from 6/26 - 7/15/18. (See attached WBD for details). The (7"x 4 1/2") annulus was SI on 7/20/18 @ 09:00. The (9 5/8"x 7") annulus was open and venting to onsite vent tank. Both wells on pad, the 6H & 4V were shut-in during this PBUT.

- Upon arrival, I met with Cabot O&G Rep., Jeremy Rapp and Selman & Assoc. Reps., Tyler Thomas and Kaydee Oliver. At 10:30 the ending pressure was checked with digital gauge and recorded. (7"x 4 1/2") = 60.5 psi. Gas checks performed at this annulus showed: 100% LEL, 100% CH4. Gas samples were collected off the (7"x 4 1/2") annulus by the Dept. and Selman & Assoc. at ~ 11:30. Following sampling, the (7x4) annulus was bled down and opened up to vent to poly vent tank at ~ 11:40. Pressure bled off annulus in

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1703774 538185 04/23/2008 2008-04-23 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling Administrative
1703774 538186 04/23/2008 2008-04-23 102.4NOPLAN - No E&S plan developed, plan not on site Administrative
1713946 541458 06/03/2008 2008-06-03 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used Administrative 601.201g
1713946 541459 06/03/2008 2008-06-03 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety 102.22 & 102.4b2
1738430 548348 09/03/2008 2008-09-03 102.4INADPLN - E&S Plan not adequate Administrative
1774900 557997 02/18/2009 2009-02-18 212WELLRCD - Failure to submit well record within 30 days of completion of drilling Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
538185 233810 NOV - Notice of Violation Comply/Closed 2008-06-26
538186 233810 NOV - Notice of Violation Comply/Closed 2008-06-26
541458 235101 NOV - Notice of Violation Comply/Closed 2008-06-26
541459 235101 NOV - Notice of Violation Comply/Closed 2008-06-26
548348 239244 NOV - Notice of Violation Comply/Closed 2008-11-04
557997 244244 NOV - Notice of Violation Superseded 2010-04-15
557997 252129 COA - Consent Order and Agreement Superseded 2010-04-15 $120,000.00 $120,000.00

For data sources see[8]