Well Details

Well ID: 37-113-20377
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Forks Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 146783
Farm/Lease Name: NELSON UNIT 2H
License Status:
Spud Date:
Permit Date: 2017-03-07
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.550989
Longitude: -76.491378

For data sources see[1][2][3]

Well History

Date Event
2017-03-07 New Permit Application
2017-03-29 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-29 2017-07-06 7,342 9,280,570 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand Sargent/Unimin Proppant Listed Below
BIOC11139A Nalo Champion Biocide Listed Below
Unislick ST - 50 CESI Chemical Friction Reducer Listed Below
Ethanol 64-17-5 5 0.00126 1134
Ethoxylated (C10-16) alcohols 68002-97-1 35 0.00005000 44
Ethanol, 2,2',2"-nitrilotris-,
tris(dihydrogen phosphate) (ester), sodium salt
68171-29-9 30 0.00164 1471
Hydrochloric acid 7647-01-0 15 0.02489 22348
Quaternary ammonium compound 68424-85-1 10 0.00253 2267
Alcohols, (C10-16), ethoxylated 68002-97-1 5 0.0035 3138
Water 7732-18-5 100 86.2671 77,446,400.0
Formaldehyde 50-00-0 1 0.00001000 1
Water 7732-18-5 85 0.14106 126639
Glutaraldehyde 111-30-8 5 0.00126 1134
Acetophenone 98-86-2 1 0.00001000 1
Alcohols, C12-16, ethoxylated 68551-12-2 5 0.0035 3138
(Mineral oil) Light hydrotreated petroleum distillate 64742-47-8 30 0.02097 18828
Water 7732-18-5 40 0.00219 1962
Water 7732-18-5 80 0.0202 18139
Alcohols, C12-14, ethoxylated 68439-50-9 5 0.0035 3138
Ethylene glycol 107-21-1 30 0.00164 1471
Crystallilne silica 14808-60-7 100 13.4662 12,089,300.0
Ammonium acetate 631-61-8 13 0.00909 8159
Thiourea 62-56-6 1 0.00001000 1
Methanol 67-56-1 5 0.00001000 6
Diethylene glycol mono-n-butyl ether 112-34-5 60 0.00008000 76
Water Chief Oil & Gas Carrier/Base Fluid Listed Below
Unihib G GeoSafe Acid Inhibitor Listed Below
Hydrochloric Acid PVS Acidizing Listed Below
SCAL16484A Nalco Champion Scale Inhibitor Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CHIEF OIL & GAS LLC 1,296,200.11 163 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 2,104,769.91 359 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 1,303,969.20 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 CHIEF OIL & GAS LLC Produced Fluid 6,225.21 Bbl REUSE (AT WELL PAD)
2017 CHIEF OIL & GAS LLC Drill Cuttings 1,073.65 Tons LANDFILL 301358
2017 CHIEF OIL & GAS LLC Produced Fluid 300.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHIEF OIL & GAS LLC Produced Fluid 1,119.32 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 525.84 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2579427 Primary Facility 2017-04-05 Routine/Complete Inspection No Violations Noted Inspection to assess site conditions after spudding operations. Gravel has been placed back onto the well pad. No evidence of accelerated erosion lr sedimentation. No violations cited.
2585887 Primary Facility 2017-04-18 Drilling/Alteration No Violations Noted Arrived @ 12:30. Weather sunny. Patterson 569 rig move to the Nelson 2H was not yet completed at the time of my inspection.

Left @ 12:45.

2588624 Primary Facility 2017-04-25 Drilling/Alteration No Violations Noted Arrived @ 12:20. Weather: cool, cloudy showers. Patterson 569 at 6460’ at the time of my inspection (kick off point at 6950). Met with Company Man Jeff Browning. Reviewed BOP tests (4/20/17 and 4/21/17), and cement reports. Left location @ 13:15.
2590312 Primary Facility 2017-05-02 Drilling/Alteration No Violations Noted Arrived @ 13.15. Weather: windy with showers. Patterson 569 at 539’at 6460’ at the time of my inspection. Met with Company Man Jeremy Boyd. Started drilling on 5/1/17, needed to trip out for bit – otherwise going very well. Previously drilling completed on the Nelson 2H. Left location @ 14:00
2599790 Primary Facility 2017-05-31 Routine/Complete Inspection No Violations Noted Arrived @ 11:30. Weather: overcast. Moran Logistics staff were on site, getting ready for a toe prep on the Nelson 2H and 3H. The purpose of this inspection was to follow-up on Peg Farrell’s 5/26/17 notification of bubbling outside of surface casing for the Nelson 3H. There are 3 wells on this location. At the time of my inspection, the Nelson 1H was producing with compression. The 2H and 3H were TD’ed but not stimulated.

Nelson 2H: The cellar was partly filled with gravel, but no water. The 13-3/8” x 9-5/8” and 9-5/8” x 5-1/2” annuli were plumbed to the same 550-gallon poly tank as the Nelson 3H. It was not possible to check the individual annuli for methane.

2607687 Primary Facility 2017-06-26 Routine/Complete Inspection No Violations Noted Two wells (2H and 3H) to be fracked in coming days. Baker tanks staged and within containment. Universal appears to be frack contractor. No violations noted.
2610383 Primary Facility 2017-06-30 Administrative/File Review Violation(s) Noted
2618045 Primary Facility 2017-07-20 Routine/Complete Inspection No Violations Noted Site was in flowback phase, with temporary separators and dehy units connected to the 2H and 3H wells. Two tenders on site with the system. Secondary containments in good condition, and all water on the pad showed low conductance (.37- .65 mS/ cm).
2669761 Primary Facility 2017-12-06 Routine/Complete Inspection No Violations Noted Arrived at 12:15. Weather: cold, windy. Met with Jon Hafer (Chief) to observe conclusion of 168- hour PBT and isotopic sample collection.

NElson 3H: 9-5/8" x 5-1/2": 282.05 psig, 13-3/8" x 9-5/8": 5.25 psig, 20" x 13-3/8": 0.75 psig.

2752692 Primary Facility 2018-07-17 Routine/Complete Inspection No Violations Noted Three wells staged for production phase. Three each water separators. Dump lines wrapped in insulating blanket. No leaks detected from production equipment. No violations noted.
2784705 Primary Facility 2018-10-03 Routine/Complete Inspection No Violations Noted Chief Oil &Gas submitted a Well Site Restoration Report (WSRR) for the Nelson pad. The WSRR was received by the Department on 9/11/18.

The pad has been reduced in size and vegetation was well established (>70% cover) at the time of inspection. All PCSM BMPs have been installed and appeared to be functioning as designed.

There are 3 properly tagged Marcellus wells staged for production. There are also 3 produced water tanks, 3 GPUs, and 1 compressor onsite and in secondary containment. There was some minimal corrosion noted on the produced water tanks (Photo #12). There was also corrosion noted around a weld on pipeline leading to the GPUs (Photo #9).

Near the wells there were 2 containers with hoses that were not labeled (Photo #6). A tank of used motor oil was near the compressor with a very faded hazard label(Photo #11). There was also a container in a "Tank Vault" that had no visible label (Photo #7).

It is recommended that all storage containers be visibly and legibly marked with proper labels. It is

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2610383 789588 2017-06-30 2018-10-18 78a85(c)2 Environmental Health & Safety
2610383 789589 2017-06-30 2018-10-18 78a85(c)4 Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
789588 354775 NOV - Notice of Violation
789588 368514 CACP - Consent Assessment of Civil Penalty COMP - Completed 2018-10-18 2018-10-18 $220,000.00 $220,000.00
789589 354775 NOV - Notice of Violation
789589 368514 CACP - Consent Assessment of Civil Penalty COMP - Completed 2018-10-18 2018-10-18 $220,000.00 $220,000.00

For data sources see[8]