Well ID: 37-113-20360 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.530259,"lon":-76.410949,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Sullivan | |
Municipality: Cherry Township | |
Operator Name: CHIEF OIL & GAS LLC | |
Well Pad ID: 153884 | |
Farm/Lease Name: HURLEY UNIT B 1H | |
License Status: | |
Spud Date: | |
Permit Date: 2016-08-24 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.530259 | |
Longitude: -76.410949 |
Date | Event |
---|---|
2016-08-24 | New Permit Application |
2017-01-10 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-05-15 | 2017-05-31 | 8,621 | 10,113,700 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | Sergent/Unimin | Proppant | Listed Below | ||||
Hydrochloric Acid | PVS | Acidizing | Listed Below | |||||
Unislick ST-50 | CESI Chemical | Friction Reducer | Listed Below | |||||
Water | 7732-18-5 | 100 | 85.546 | 84,399,000.0 | ||||
Water | 7732-18-5 | 85 | 0.14891 | 146917 | ||||
Ammonium acetate | 631-61-8 | 13 | 0.0087 | 8584 | ||||
Ethanol | 64-17-5 | 5 | 0.00128 | 1267 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 1 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00335 | 3302 | ||||
Water | 7732-18-5 | 80 | 0.02055 | 20275 | ||||
Distillate, petroleum, hydrotreated, light | 64742-47-8 | 30 | 0.02008 | 19810 | ||||
Quaternary ammonium compound | 68424-85-1 | 10 | 0.00257 | 2534 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.00167 | 1651 | ||||
Hydrochloric acid | 7647-01-0 | 15 | 0.02628 | 25927 | ||||
Crystallilne silica | 14808-60-7 | 100 | 14.1804 | 13,990,300.0 | ||||
Ethoxylated (C10-16) alcohols | 68002-97-1 | 35 | 0.00005000 | 51 | ||||
Methanol | 67-56-1 | 5 | 0.00001000 | 7 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 1 | ||||
Diethylene glycol mono-n-butyl ether | 112-34-5 | 60 | 0.00009000 | 88 | ||||
Glutaraldehyde | 111-30-8 | 5 | 0.00128 | 1267 | ||||
Water | 7732-18-5 | 40 | 0.00233 | 2201 | ||||
Acetophenone | 98-86-2 | 1 | 0.00001000 | 1 | ||||
Ethanol, 2,2',2"-nitrilotris-, tris(dihydrogen phosphate) (ester), sodium salt |
68171-29-9 | 30 | 0.00167 | 1651 | ||||
Alcohols, C12-14, ethoxylated | 68439-50-9 | 5 | 0.00335 | 3302 | ||||
Alcohols, (C10-16), ethoxylated | 68002-97-1 | 5 | 0.00335 | 3302 | ||||
BIOC11219A | Nalco Champion | Biocide | Listed Below | |||||
EC6486A | Nalco Champion | Scale Inhibitor | Listed Below | |||||
Unihib G | GeoSafe | Acid Inhibitor | Listed Below | |||||
Water | Chief Oil and Gas | Carrier/Base Fluid | Listed Below |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | CHIEF OIL & GAS LLC | 3,474,029.71 | 207 | 0.00 | 0 | 0.00 | 0 |
2018 | CHIEF OIL & GAS LLC | 3,555,689.91 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHIEF OIL & GAS LLC | 2,431,214.49 | 363 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 5,113.07 Bbl | REUSE (AT WELL PAD) | |
2017 | CHIEF OIL & GAS LLC | Drilling Fluid Waste | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2017 | CHIEF OIL & GAS LLC | Drill Cuttings | 1,756.11 Tons | LANDFILL | 301358 |
2017 | CHIEF OIL & GAS LLC | Produced Fluid | 300.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | CHIEF OIL & GAS LLC | Produced Fluid | 884.29 Bbl | REUSE (AT WELL PAD) | |
2019 | CHIEF OIL & GAS LLC | Produced Fluid | 499.39 Bbl | REUSE (AT WELL PAD) |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2521195 | Primary Facility | 2016-09-20 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess progress of site construction and overall conditions. Work was nearly complete on constructing the stormwater retention basins, and general grading is underway. Perimeter erosion and sediment control BMPs are in place and in good repair. No evidence of accelerated erosion or sedimentation was observed.
No violations were issued during this inspection. |
2526266 | Primary Facility | 2016-10-07 | Routine/Complete Inspection | No Violations Noted | Routine inspection conducted to assess progress of site construction and overall conditions. Rough grading on the pad appears to be nearly complete. Perimeter erosion and sediment control BMPs are in place and in good repair. Germination is occuring on areas that have been seeded. No evidence of accelerated erosion or sedimentation was observed.
No violations were issued during this inspection. |
2527119 | Primary Facility | 2016-10-12 | Preoperation Inspection | No Violations Noted | Preoperational inspection conducted at the request of Chief Oil & Gas. Keith Kimball and Merle Wade of Chief were present during the inspection.
All erosion and sediment control BMPs are in place as permitted and in good repair. Temporary stabilization is in place on the disturbed areas of the site, and germination of the seed mix was evident over most of the site. Grading and compaction of the final layer of rock ono the well pad surface was nearly complete. A backhoe with staining on the side and track below the fuel port was parked along the site access road. Upon closer investigation, the staining was observed to be from deisel fuel, and a small area of staining on the ground surface was noted. Judging by the extent of the staining the amount of spilled fuel was less than 5 gallons. Since staining from the spilled fuel was observed on the ground surface, this release had the potential to pollute waters of the Commonwealth, which is in violation of 35 P.S. § 691.402(b). Title 35 P.S. § 691.402(b) proh |
2557616 | Primary Facility | 2017-01-25 | Routine/Complete Inspection | No Violations Noted | |
2564696 | Primary Facility | 2017-02-24 | Routine/Complete Inspection | No Violations Noted | No violations cited. |
2569496 | Primary Facility | 2017-03-09 | Routine/Complete Inspection | Viol(s) Noted & Immediately Corrected | Routine inspection conducted to assess overall site conditions during drilling operations. Ty Marine was the Chief company representative on site. I informed Mr. Marine of the area of sheen observed and recommended that the puddle be removed. Mr. Marine indicated that the puddle would be removed immediately.
I revisited the site on March 08, 2017, with Kellon Balum of Chief. No sheen or odor was observed, indicating that the clean up efforts were effective. Title 25 Pa. Code Section 91.34(a) requires persons engaged in an activity which includes the impoundment, production, processing, transportation, storage, use, application or disposal of pollutants to take necessary measures to prevent the substances from directly or indirectly reaching waters of this Commonwealth, through accident, carelessness, maliciousness, hazards of weather or from another cause. Since the observed release occurred off of containment, it was in violation of this requirement. However, since remedial measures were promptly taken a |
2572874 | Primary Facility | 2017-03-20 | Routine/Partial Inspection | No Violations Noted | Inspection conducted to review site conditions after drill rig moved off site. Containment was in place around the well heads. No evidence of spills was observed in the area outside of the containment. Due to snow cover, erosion and sediment control issues noted during previous inspections were not inspected. No violations were cited. |
2577358 | Primary Facility | 2017-03-31 | Routine/Complete Inspection | No Violations Noted | I arrived on-site@ 14:05 hrs and met Brandon Jessen, Chief company man. Drilling @12,000 ft on synthetic oil based mud. Some minor housekeeping issues noted. In chemical secondary containment, small piles of a white, powdery substance were on the liner. In the cuttings backyard, small amounts of drill cuttings were on the rig mats, with one or two very small spots off the edge of containment. Brandon informed me that a rolloff had just been removed from the backyard, and that he would have both areas cleaned. I departed @14:40 hrs. |
2597398 | Primary Facility | 2017-05-24 | Routine/Complete Inspection | No Violations Noted | I arrived on-site @ 09:25 hrs and met Justin Myers and Floyd Roberts of Chief. Frac completed; Universal Well Services removing frac equipment from site. Coil tubing rig should be arriving on location to begin drilling out plugs this afternoon or tomorrow. Baker tank containments and sitewide liner appear to be in excellent condition, although the berm had been removed for moving the equipment off-site. I departed @10:05 hrs. |
2673857 | Primary Facility | 2017-12-21 | Routine/Complete Inspection | No Violations Noted | Arrived at 1339. Weather: sunny, with temperatures in the 30s. There are two producing wells on this pad the Hurley B 1H had 16 percent methane/volume at the poly tank (Altair five X gas meter calibrated on December 18). The 9 5/8 x 5 1/2" annulus was gurgling. It was not possible to monitor the 13 3/8 x 9 5/8" annulus.
Yonkin B1H: top gauge 1500 psi (0 to 5000 PSI, analog). It was not possible to monitor the anuli on this well for gas. |
2695447 | Primary Facility | 2018-02-16 | Routine/Complete Inspection | No Violations Noted | Two wells staged for production phase. Two water separators. No leaks detected from production equipment. No violations noted. |
2791422 | Primary Facility | 2018-10-18 | Administrative/File Review | Violation(s) Noted | Administrative Inspection created to cite a violation against a well in which Chief entered the wellbore less than eight hours after cementing the casing. This inspection/violation is part of a CACP found under Enforcement Record ID #368514. |
2812143 | Primary Facility | 2018-12-06 | Routine/Complete Inspection | No Violations Noted | Arrived onsite for a routine inspection at 10:24; the weather was ~25°F and lightly snowing.
There were 2 properly tagged Marcellus wells staged for production. The well cellars were filled with gravel. There were 2 GPUs and 2 produced water tanks onsite and in secondary containment. The secondary containment contained a small amount of ice. The site was greater than 70% vegetative cover and no E&S issues were observed. It appeared that PCSM was addressed. Some filter sock was still in place around the well site. According to Department records the ESCGP for this pad expires on 2/23/21. A 2-year restoration extension was also acknowledged on 9/12/17. No violations noted at the time of inspection. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2569496 | 780238 | 2017-03-08 | 2017-03-08 | 91.34(A) | Environmental Health & Safety | Immediately corrected. |
2791422 | 831078 | 2018-10-18 | 2018-10-18 | 78a85(c)4 | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
831078 | 368514 | CACP - Consent Assessment of Civil Penalty | COMP - Completed | 2018-10-18 | 2018-10-18 | $220,000.00 | $220,000.00 |
For data sources see[8]