X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-113-20312

Well Details

Well ID: 37-113-20312
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Shrewsbury Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID:
Farm/Lease Name: EDKIN HILL UNIT 3P 3H
License Status:
Spud Date:
Permit Date: 2014-09-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.341033
Longitude: -76.604069

For data sources see[1][2][3]

Well History

Date Event
2014-09-15 New Permit Application

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2310964 Primary Facility 2014-10-02 Routine/Complete Inspection No Violations Noted Jeremy Rusczyk and I met with Rick Mays (EXCO), Kevin and Kyle Belles (Bower Construction) to review plans for construction of the pad and access road. The access road (often lying on bedrock) runs for ~ 1 mile and gently moves up contour as it follows a farm track/logging path across a south-facing hillside. The proposed access road is bordered by two small wetlands on the north side of the road.
2321472 Primary Facility 2014-11-12 Routine/Complete Inspection No Violations Noted RTNC- Shale being generated at the well pad is being used to construct both the well pad and access road. E&S controls are installed and functioning properly. Novio
2339435 Primary Facility 2015-01-28 Routine/Complete Inspection No Violations Noted
2355905 Primary Facility 2015-03-27 Routine/Complete Inspection No Violations Noted The access road is showing some signs of wear and breakdown as the frost comes out of the ground and the native shale top-rock wears but no signs of accelerated E&S (erosion and sedimentation) were noted. Soils were stabilized with straw mulch since the construction was completed outside the growing season. A few locations were showing signs of slumping and rain could cause some E&S issues in the coming month. I recommend keeping an eye on the stabilized slopes and access road. On the pad, flowback of the 2P 2H well (113-20330) had just been completed and equipment was being broken down. Field conductivity was between 8,000-13,000 umhos/cm on containment and a vacuum was being used to remove brine from containment before removing the liner for disposal. The highest specific conductivity noted off containment was 1760 umhos/cm in a small puddle. I asked the company man (Kevin Voltz) to keep vacuuming off the containment. No Violations Noted.
2412146 Primary Facility 2015-10-01 Routine/Complete Inspection No Violations Noted

For data sources see[5]

References