Well Details

Well ID: 37-113-20234
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Cherry Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 146346
Farm/Lease Name: DACHEUX UNIT 3H
License Status:
Spud Date: 2013-11-27
Permit Date: 2013-10-10
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.522039
Longitude: -76.414317

For data sources see[1][2][3]

Well History

Date Event
2013-10-10 New Permit Application
2013-11-27 Performed Spud Operation
2014-02-07 Drilling Completion
2014-04-23 Perforation
2015-01-20 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-04-23 2014-04-29 7,769 7,433,290

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FR-66 Halliburton Friction Reducer Hydrotreated Light Petroleum Distillate 64742-47-8 30 0.03 0
Hydrochloric Acid 10-30% Halliburton Acid Hydrochloric Acid 7647-01-0 30 0.09 0
MCB-8614 MULTI-CHEM BIOCIDE GLUTARALDEHYDE 111-30-8 30 0.02 0
ALKYL (C12-16) DIMETHYLBENZXYLAMMONIUM CHLORIDE 68424-85-1 5 0.003 0
MCS-2510T MULTI-CHEM Scale Inhibitor ETHYLENE GLYCOL 107-21-1 60 0.006 0
Water Provided by Customer Base Fluid Fresh Water 0000-00-0 100 99.85 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2014 CHIEF OIL & GAS LLC 2,387,691.00 204 0.00 0 0.00 0
2015 CHIEF OIL & GAS LLC 2,974,120.37 264 0.00 0 0.00 0
2016 CHIEF OIL & GAS LLC 2,254,645.52 288 0.00 0 0.00 0
2017 CHIEF OIL & GAS LLC 2,107,751.01 365 0.00 0 0.00 0
2018 CHIEF OIL & GAS LLC 1,420,806.96 354 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 1,175,390.60 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CHIEF OIL & GAS LLC Drill Cuttings 40.35 Tons LANDFILL 301358
2013 CHIEF OIL & GAS LLC Drill Cuttings 234.03 Tons LANDFILL 100933
2014 CHIEF OIL & GAS LLC Drilling Fluid Waste 212.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 288.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014 CHIEF OIL & GAS LLC Drill Cuttings 303.57 Tons LANDFILL 100933
2014 CHIEF OIL & GAS LLC Fracing Fluid Waste 2,986.48 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Produced Fluid 2,531.68 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHIEF OIL & GAS LLC Drill Cuttings 432.33 Tons LANDFILL 301358
2015 CHIEF OIL & GAS LLC Produced Fluid 3,377.95 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHIEF OIL & GAS LLC Produced Fluid 301.10 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHIEF OIL & GAS LLC Produced Fluid 116.82 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017 CHIEF OIL & GAS LLC Produced Fluid 529.93 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Produced Fluid 335.73 Bbl REUSE (AT WELL PAD)
2019 CHIEF OIL & GAS LLC Produced Fluid 215.28 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2225622 Primary Facility 2013-12-02 Routine/Partial Inspection No Violations Noted
2231216 Primary Facility 2013-12-19 Drilling/Alteration No Violations Noted
2235975 Primary Facility 2014-01-13 Routine/Complete Inspection No Violations Noted
2240561 Primary Facility 2014-01-29 Routine/Complete Inspection No Violations Noted
2244618 Primary Facility 2014-02-06 Drilling/Alteration No Violations Noted
2254016 Primary Facility 2014-03-13 Routine/Complete Inspection No Violations Noted
2269148 Primary Facility 2014-05-08 Routine/Complete Inspection No Violations Noted
2278064 Primary Facility 2014-06-11 Routine/Complete Inspection No Violations Noted
2280703 Primary Facility 2014-06-21 Drilling/Alteration No Violations Noted
2379166 Primary Facility 2015-06-12 Routine/Complete Inspection No Violations Noted Arrived on site at 13:30 and departed at 13:50. Weather conditions were sunny and ~85°F. No Chesapeake representatives were present during the inspection.
2385638 Primary Facility 2015-07-07 Routine/Complete Inspection No Violations Noted Arrived @ 13:24 with OGI Andy Becher for a routine inspection. Weather: hot and humid following storms the previous day. Chief’s Kevin Hadlock was onsite during our inspection. All six wells were in production with 13-3/8” x 9-5/8”, and 9-5/8” x 5-1/2” annuli plumbed into poly tanks. Annular spaces were monitored for methane using an Altair 5X .3H: 13-3/8 x 9-5/8: 7% LEL, 9-5/8 x 5-1/2: 3% methane.
2514773 Primary Facility 2016-08-24 Routine/Complete Inspection No Violations Noted Arrived @ 11:38. Weather: sunny and pleasant. The purpose of this inspection was to document conditions at the Dacheux 3H, following up on a report of a possible communication on 08/23/16 between this well and the G&S Big Rigger 3H, which was currently being stimulated. Met with Jon Hafer and Gary Bahrke (Chief). At the time of my inspection, the Dacheux 3H was flowing on an open choke at the GPU (64 choke). There was no tubing in the well and the pressure at the wellhead was 1200 psi, which was comparable to the other wells on location. Earlier, flow rate and pressure had dropped. Mr. Bahrke investigated but found no mechanical issues. He dropped soap into the well and it returned 23 bbls of fluid. This was unusual as the well was typically dry.

Dacheux 3H: 13-3/8” x 9-5/8”: 0% /volume combustible gas, 9-5/8” x 5-1/2”: 4%/volume combustible gas There were no violations at this time. Left location @ 12:30.

2538809 Primary Facility 2016-11-23 Site Restoration No Violations Noted Restoration inspection conducted in response to well site restoration reports filed by Chief Oil & Gas, LLC on November 22, 2016.

Interim restoration has been implemented on the well pad. A significant portion of the pad surface has been decompacted and vegetated. The most recent waste report for the subject facilities was submitted to the Department's Oil and Gas Reporting Electronic (OGRE) system on August 8, 2016. A Notice of Termination (NOT) for the erosion and sediment control permit associated with the site was approved by the Department on October 19, 2016.

Based on the information above and site conditions observed during the NOT inspection, these restoration reports are acknowledged.

2577017 Primary Facility 2017-03-30 Routine/Complete Inspection No Violations Noted Six Wells in production status. Six separators within containment. No leaks detected from production equipment. Site stabilized in all areas not needed for access to production equipment or wellheads. A well line was recently run to the well site. No violations noted.
2656903 Primary Facility 2017-11-03 Routine/Complete Inspection No Violations Noted Arrived at 13:00. Weather: cloudy with some rain. No personnel on site. 6 producing wells on location. Annuli venting to 550-gallon polytanks with vent stacks. The stacks were too high to monitor for combustible gas. All cellars filled with gravel. Analog gauges 0-5000 psi.

1H. Top gauge:1100 psi 3H. Top gauge 1050 psi 4H. Top gauge:1000 psi 2H. Top gauge:1100 psi 5H: Top gauge: 1150 psi 6H. Top gauge: 1050 psi. Well pad partially covered with grass. No violations were observed at this time.

2680186 Primary Facility 2018-01-09 Routine/Complete Inspection No Violations Noted Arrived at 1:10. Weather: sunny with blue skies. There are six producing wells on this pad. The Pad has been partly grassed. Top gauges on each of the six Wells were approximately 1000 psi (0 to 5000 psi analog). Annular vents were open to poly tanks. I was unable to monitor methane at the polytank openings. No violations were observed during my inspection.
2722871 Primary Facility 2018-04-25 Routine/Complete Inspection No Violations Noted The Dehydration units are being replaced. The larger units are being swapped out for smaller units.
2827061 Primary Facility 2019-01-14 Routine/Complete Inspection No Violations Noted Arrived onsite for a routine inspection at 09:46; the weather was ~15°F and calm. The gate was open when I arrived.

There were 6 properly tagged Marcellus wells staged for production. The well cellars were filled with gravel. There were 6 GPUs and 6 produced water tanks onsite and in secondary containment. The well annuli were plumbed to 4 poly tanks not on additional secondary containment.

Areas around the well site were greater than 70% uniform, perennial, vegetative cover. The pad had been reduced and was almost completely revegetated. Some steeper slopes were stabilized with rock lining.

No violations were noted at the time of inspection.

For data sources see[8]

References