X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-083-56761

Well Details

Well ID: 37-083-56761
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Sergeant Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 151434
Farm/Lease Name: COP WT 2314 48H 51318
License Status: Active
Spud Date: 2015-09-15
Permit Date: 2015-08-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 41.604956
Longitude: -78.454686

For data sources see[1][2][3]

Well History

Date Event
2015-08-06 New Permit Application
2015-09-15 Performed Spud Operation
2015-10-29 Drilling Completion
2016-03-01 New Permit Application
2016-09-28 Perforation
2016-09-28 Performed Stage 1 of Stimulation
2016-09-29 Perforation
2016-09-29 Performed Stage 2 of Stimulation
2016-09-29 Performed Stage 3 of Stimulation
2016-09-30 Perforation
2016-09-30 Performed Stage 4 of Stimulation
2016-10-01 Perforation
2016-10-01 Performed Stage 5 of Stimulation
2016-10-01 Performed Stage 6 of Stimulation
2016-10-02 Perforation
2016-10-02 Performed Stage 7 of Stimulation
2016-10-02 Performed Stage 8 of Stimulation
2016-10-03 Perforation
2016-10-03 Performed Stage 9 of Stimulation
2016-10-04 Perforation
2016-10-04 Performed Stage 10 of Stimulation
2016-10-04 Performed Stage 11 of Stimulation
2016-10-05 Perforation
2016-10-05 Performed Stage 12 of Stimulation
2016-10-05 Performed Stage 13 of Stimulation
2016-10-06 Perforation
2016-10-06 Performed Stage 14 of Stimulation
2016-10-07 Perforation
2016-10-07 Performed Stage 15 of Stimulation
2016-10-07 Performed Stage 16 of Stimulation
2016-10-08 Perforation
2016-10-08 Performed Stage 17 of Stimulation
2016-10-09 Perforation
2016-10-09 Performed Stage 18 of Stimulation
2016-10-09 Performed Stage 19 of Stimulation
2016-10-10 Perforation
2016-10-10 Performed Stage 20 of Stimulation
2016-10-11 Perforation
2016-10-11 Performed Stage 21 of Stimulation
2016-10-12 Performed Stage 22 of Stimulation
2016-10-13 Perforation
2016-10-13 Performed Stage 23 of Stimulation
2016-10-13 Performed Stage 24 of Stimulation
2016-10-14 Perforation
2016-10-14 Performed Stage 25 of Stimulation
2016-10-15 Perforation
2016-10-15 Performed Stage 26 of Stimulation
2016-10-16 Perforation
2016-10-16 Performed Stage 27 of Stimulation
2016-10-17 Perforation
2016-10-17 Performed Stage 28 of Stimulation
2016-10-17 Performed Stage 29 of Stimulation
2016-10-19 Perforation
2016-10-19 Performed Stage 30 of Stimulation
2016-10-20 Perforation
2016-10-20 Performed Stage 31 of Stimulation
2016-10-21 Perforation
2016-10-21 Performed Stage 32 of Stimulation
2016-10-21 Performed Stage 33 of Stimulation
2016-10-22 Perforation
2016-10-22 Performed Stage 34 of Stimulation
2016-10-23 Perforation
2016-10-23 Performed Stage 35 of Stimulation
2016-10-24 Perforation
2016-10-24 Performed Stage 36 of Stimulation
2016-10-25 Perforation
2016-10-25 Performed Stage 37 of Stimulation
2016-10-26 Perforation
2016-10-26 Performed Stage 38 of Stimulation
2016-10-26 Performed Stage 39 of Stimulation
2016-10-26 Performed Stage 40 of Stimulation
2016-10-27 Perforation
2016-10-27 Performed Stage 41 of Stimulation
2016-10-27 Performed Stage 42 of Stimulation
2017-02-13 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-09-28 2016-11-20 8,400 9,461,630 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Seneca Resources Corp Carrier/Base Fluid Water 7732-18-5 100 87.5209 80,696,500.0
KFR-20 Keane Energy Friction Reducer Polyacrylamide 69418-26-4 30 0.0246096 22690.6
Ammonium chloride 12125-02-9 1 0.00082032 756.356
Distallates hydrotreated light 64742-47-8 20 0.0164064 15127.1
Oleic acid diethanolamide 93-83-4 2 0.00164064 1512.71
C12-16 68551-12-2 2 0.00164064 1512.71
KFEAC 30 Keane Energy Iron Control Citric acid 77-92-9 30 0.00020151 185.797
acetic acid 64-19-7 45 0.00030226 278.691
Proppant 30/50 Ottawa Keane Energy Proppant Crystalline silica (quartz) 14808-60-7 100 5.71265 5,267,210.0
Proppant 80/100 Oklahoma Keane Energy Proppant Silica 14808-60-7 100 0.877286 808880
KSI-16 NW Keane Energy Scale Inhibitor Ammonia 7664-41-7 0.1 0.00001404 12.945
Alkyl phosphonic acid proprietary 5 0.0010289 948.672
KAI-13 Keane Energy Corrosion Inhibitor dipropylene glycol, monomethyl ether 34590-94-8 15 0.00016792 154.826
formic acid 64-18-6 7.5 0.00008396 77.413
cinnamaldehyde 104-55-2 7.5 0.00008396 77.413
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 7.5 0.00008396 77.413
Ethylene glycol 107-21-1 35 0.00039182 361.268
ethoxylated alcohol 68131-39-5 7.5 0.00008396 77.413
isoprpyl alcohol 67-63-0 2.5 0.00002799 25.807
7.5% HydroChloric Acid Keane Energy Acid Hydrochloric Acid HCl 7647-01-0 7.5 0.0390614 36015.6
MBC 516 Keane Energy Biocide N-alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.0004905 452.253
Ethanol 64-17-5 2.8 0.00024971 230.239
Glutaraldehyde 111-30-8 27 0.00240792 2220.16
Didecyl dimethyl ammonium chloride 7173-51-5 8.3 0.00074021 682.492
Proppant 40/70 Ottawa Keane Energy Proppant Crystalline silica (quartz) 14808-60-7 100 5.79864 5,346,490.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-09-28 1 OTTAWA 280,686 7,336 7,506
2016-09-29 2 OTTAWA 280,686 7,776 5,028
2016-09-29 3 OTTAWA 280,686 7,795 4,654
2016-09-30 4 OTTAWA 280,686 7,791 4,837
2016-10-01 5 OTTAWA 280,686 7,934 5,098
2016-10-01 6 OTTAWA 280,686 7,828 6,246
2016-10-02 7 OTTAWA 280,686 7,776 5,592
2016-10-02 8 OTTAWA 280,686 8,035 5,154
2016-10-03 9 OTTAWA 280,686 7,868 5,930
2016-10-04 10 OTTAWA 280,686 7,861 5,151
2016-10-04 11 OTTAWA 280,686 7,832 5,904
2016-10-05 12 OTTAWA 280,686 8,075 5,434
2016-10-05 13 OTTAWA 280,686 8,359 5,377
2016-10-06 14 OTTAWA 280,686 8,594 5,889
2016-10-07 15 OTTAWA 280,686 8,398 4,948
2016-10-07 16 OTTAWA 280,686 8,328 4,991
2016-10-08 17 OTTAWA 280,686 8,441 5,271
2016-10-09 18 OTTAWA 280,686 8,053 5,384
2016-10-09 19 OTTAWA 280,686 8,044 5,436
2016-10-10 20 OTTAWA 280,686 7,924 5,387
2016-10-11 21 OTTAWA 280,686 7,876 5,111
2016-10-12 22 OTTAWA 280,686 7,878 5,555
2016-10-13 23 OTTAWA 280,686 7,657 5,357
2016-10-13 24 OTTAWA 280,686 7,017 4,918
2016-10-14 25 OTTAWA 280,686 7,163 5,190
2016-10-15 26 OTTAWA 280,686 7,743 6,027
2016-10-16 27 OTTAWA 280,686 7,701 5,894
2016-10-17 28 OTTAWA 280,686 7,348 5,558
2016-10-17 29 OTTAWA 280,686 7,519 5,788
2016-10-19 30 OTTAWA 280,686 7,612 5,632
2016-10-20 31 OTTAWA 280,686 7,177 5,754
2016-10-21 32 OTTAWA 280,686 7,537 5,676
2016-10-21 33 OTTAWA 280,686 7,073 6,388
2016-10-22 34 OTTAWA 280,686 6,834 5,712
2016-10-23 35 OTTAWA 280,686 7,072 5,535
2016-10-24 36 OTTAWA 280,686 7,426 5,612
2016-10-25 37 OTTAWA 280,686 6,708 5,454
2016-10-26 38 OTTAWA 280,686 7,191 5,545
2016-10-26 39 OTTAWA 280,686 6,994 6,328
2016-10-26 40 OTTAWA 280,686 6,478 5,327
2016-10-27 41 OTTAWA 280,686 6,899 5,461
2016-10-27 42 OTTAWA 280,686 7,177 5,277

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 1,076,236.57 322 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 727,065.17 357 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 505,975.12 358 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 SENECA RESOURCES CO LLC Drill Cuttings 1,116.40 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Synthetic Liner Materials 1.43 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 58.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 81.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 SENECA RESOURCES CO LLC Servicing Fluid 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Drill Cuttings 1.40 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 35.38 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 222.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 SENECA RESOURCES CO LLC Produced Fluid 70,373.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Synthetic Liner Materials 4.81 Tons LANDFILL 100361
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 927.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Produced Fluid 68.75 Bbl REUSE (AT WELL PAD)
2017 SENECA RESOURCES CO LLC Unused Fracturing Fluid Waste 12.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 SENECA RESOURCES CO LLC Produced Fluid 6.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Produced Fluid 515.00 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 31,269.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 16.25 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 1,338.26 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 161.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003
2018 SENECA RESOURCES CO LLC Produced Fluid 43.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 3.06 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Produced Fluid 14,440.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 12.50 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 SENECA RESOURCES CO LLC Produced Fluid 26.88 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 903.51 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 2,664.38 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2019 SENECA RESOURCES CO LLC Produced Fluid 220.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 9.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 13.75 Bbl INJECTION DISPOSAL WELL 34-133-20525
2019 SENECA RESOURCES CO LLC Produced Fluid 71.25 Bbl REUSE (AT WELL PAD)
2019 SENECA RESOURCES CO LLC Produced Fluid 53.75 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2406369 Primary Facility 2015-09-04 Routine/Complete Inspection No Violations Noted
2410390 Primary Facility 2015-09-17 Drilling/Alteration No Violations Noted
2428562 Primary Facility 2015-10-20 Drilling/Alteration No Violations Noted
2428570 Primary Facility 2015-10-19 Drilling/Alteration No Violations Noted
2443515 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted
2518761 Primary Facility 2016-08-24 Drilling/Alteration No Violations Noted
2526239 Primary Facility 2016-09-28 Drilling/Alteration No Violations Noted
2545824 Primary Facility 2016-12-20 Administrative/File Review No Violations Noted
2561335 Primary Facility 2017-02-10 Routine/Complete Inspection No Violations Noted Drilled and stimulated Marcellus Shale well. There are numerous fluid tanks on site; none appeared to be leaking and all were within properly sized diking. This site was stable and snow covered at the time of this inspection. The site ID sign and inspection log were at the entrance to the site.
2619947 Primary Facility 2017-07-28 Routine/Complete Inspection No Violations Noted This well pad has completed wells on it. The operator is working in the area of the stock tanks on the north side of the location. Vegetation around the site is in good shape. No spills or leaks are noted.
2619949 Primary Facility 2017-07-28 Routine/Complete Inspection No Violations Noted This well pad has completed wells on it. The operator is working in the area of the stock tanks on the north side of the location. Vegetation around the site is in good shape. No spills or leaks are noted.
2771776 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted This is a Marcellus shale well pad with 8 producing wells on it. The wells are tagged. There is a tank site within steel containment. No spills or leaks are noted. This site is stable and vegetated. The well site ID sign and paperwork are available at the entrance to the site.

For data sources see[9]

References