X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-083-56760

Well Details

Well ID: 37-083-56760
Loading map...
Country: United States
State: Pennsylvania
County: McKean
Municipality: Sergeant Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 151434
Farm/Lease Name: COP WT 2314 47H 51317
License Status: Active
Spud Date: 2015-09-15
Permit Date: 2015-08-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.604981
Longitude: -78.454583

For data sources see[1][2][3]

Well History

Date Event
2015-08-06 New Permit Application
2015-09-15 Performed Spud Operation
2015-10-09 Drilling Completion
2016-09-28 Perforation
2016-09-28 Performed Stage 1 of Stimulation
2016-09-29 Perforation
2016-09-29 Performed Stage 2 of Stimulation
2016-09-30 Perforation
2016-09-30 Performed Stage 3 of Stimulation
2016-09-30 Performed Stage 4 of Stimulation
2016-10-01 Perforation
2016-10-01 Performed Stage 5 of Stimulation
2016-10-02 Perforation
2016-10-02 Performed Stage 6 of Stimulation
2016-10-02 Performed Stage 7 of Stimulation
2016-10-03 Perforation
2016-10-03 Performed Stage 8 of Stimulation
2016-10-03 Performed Stage 9 of Stimulation
2016-10-04 Perforation
2016-10-04 Performed Stage 10 of Stimulation
2016-10-05 Perforation
2016-10-05 Performed Stage 11 of Stimulation
2016-10-05 Performed Stage 12 of Stimulation
2016-10-06 Perforation
2016-10-06 Performed Stage 13 of Stimulation
2016-10-06 Performed Stage 14 of Stimulation
2016-10-07 Perforation
2016-10-07 Performed Stage 15 of Stimulation
2016-10-07 Performed Stage 16 of Stimulation
2016-10-08 Perforation
2016-10-08 Performed Stage 17 of Stimulation
2016-10-09 Perforation
2016-10-09 Performed Stage 18 of Stimulation
2016-10-10 Perforation
2016-10-10 Performed Stage 19 of Stimulation
2016-10-11 Perforation
2016-10-11 Performed Stage 20 of Stimulation
2016-10-11 Performed Stage 21 of Stimulation
2016-10-12 Perforation
2016-10-12 Performed Stage 22 of Stimulation
2016-10-13 Perforation
2016-10-13 Performed Stage 23 of Stimulation
2016-10-14 Perforation
2016-10-14 Performed Stage 24 of Stimulation
2016-10-15 Perforation
2016-10-15 Performed Stage 25 of Stimulation
2016-10-15 Performed Stage 26 of Stimulation
2016-10-16 Perforation
2016-10-16 Performed Stage 27 of Stimulation
2016-10-17 Perforation
2016-10-17 Performed Stage 28 of Stimulation
2016-10-18 Performed Stage 29 of Stimulation
2016-10-19 Perforation
2016-10-20 Perforation
2016-10-20 Performed Stage 30 of Stimulation
2016-10-20 Performed Stage 31 of Stimulation
2016-10-22 Perforation
2016-10-22 Performed Stage 32 of Stimulation
2016-10-22 Performed Stage 33 of Stimulation
2016-10-23 Perforation
2016-10-23 Performed Stage 34 of Stimulation
2016-10-24 Perforation
2016-10-24 Performed Stage 35 of Stimulation
2016-10-24 Performed Stage 36 of Stimulation
2016-10-25 Perforation
2016-10-25 Performed Stage 37 of Stimulation
2016-10-25 Performed Stage 38 of Stimulation
2016-10-26 Perforation
2016-10-26 Performed Stage 39 of Stimulation
2016-10-26 Performed Stage 40 of Stimulation
2016-10-27 Perforation
2016-10-27 Performed Stage 41 of Stimulation
2017-02-13 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-09-28 2016-11-20 8,359 9,282,420 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 7.5% HydroChloric Acid Keane Energy Acid Hydrochloric Acid HCl 7647-01-0 7.5 0.0388922 35205.9
KSI-16 NW Keane Energy Scale Inhibitor Alkyl phosphonic acid proprietary 5 0.00102451 927.405
Ammonia 7664-41-7 0.1 0.00001398 12.655
Proppant 80/100 Oklahoma Keane Energy Proppant Silica 14808-60-7 100 0.874364 791490
KFR-20 Keane Energy Friction Reducer Distallates hydrotreated light 64742-47-8 20 0.0162522 14711.8
C12-16 68551-12-2 2 0.00162522 1471.18
Polyacrylamide 69418-26-4 30 0.0243783 22067.6
Oleic acid diethanolamide 93-83-4 2 0.00162522 1471.18
Ammonium chloride 12125-02-9 1 0.00081261 735.589
KAI-13 Keane Energy Corrosion Inhibitor cinnamaldehyde 104-55-2 7.5 0.00008360 75.676
ethoxylated alcohol 68131-39-5 7.5 0.00008360 75.676
Ethylene glycol 107-21-1 35 0.00039012 353.144
formic acid 64-18-6 7.5 0.00008360 75.676
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 7.5 0.00008360 75.676
isoprpyl alcohol 67-63-0 2.5 0.00002787 25.228
dipropylene glycol, monomethyl ether 34590-94-8 15 0.0001672 151.352
MBC 516 Keane Energy Biocide N-alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00048524 439.248
Glutaraldehyde 111-30-8 27 0.0023821 2156.32
Ethanol 64-17-5 2.8 0.00024703 223.616
Didecyl dimethyl ammonium chloride 7173-51-5 8.3 0.00073228 662.873
Proppant 30/50 Ottawa Keane Energy Proppant Crystalline silica (quartz) 14808-60-7 100 5.77832 5,230,640.0
Proppant 40/70 Ottawa Keane Energy Proppant Crystalline silica (quartz) 14808-60-7 100 5.80148 5,251,610.0
Water Seneca Resources Corp Carrier/Base Fluid Water 7732-18-5 100 87.4559 79,166,700.0
KFEAC 30 Keane Energy Iron Control Citric acid 77-92-9 30 0.00020064 181.623
acetic acid 64-19-7 45 0.00030095 272.425

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2016-09-28 1 OTTAWA 249,984 7,679 5,734
2016-09-29 2 OTTAWA 249,984 7,778 4,807
2016-09-30 3 OTTAWA 249,984 7,993 4,654
2016-09-30 4 OTTAWA 249,984 8,021 4,896
2016-10-01 5 OTTAWA 249,984 7,893 6,405
2016-10-02 6 OTTAWA 249,984 7,411 5,644
2016-10-02 7 OTTAWA 249,984 7,697 5,418
2016-10-03 8 OTTAWA 249,984 7,769 5,541
2016-10-03 9 OTTAWA 249,984 8,154 5,540
2016-10-04 10 OTTAWA 249,984 8,061 5,219
2016-10-05 11 OTTAWA 249,984 7,898 5,705
2016-10-05 12 OTTAWA 249,984 8,505 4,970
2016-10-06 13 OTTAWA 249,984 8,519 5,488
2016-10-06 14 OTTAWA 249,984 8,565 5,794
2016-10-07 15 OTTAWA 249,984 8,461 5,800
2016-10-07 16 OTTAWA 249,984 7,964 5,097
2016-10-08 17 OTTAWA 249,984 8,312 5,813
2016-10-09 18 OTTAWA 249,984 8,130 5,939
2016-10-10 19 OTTAWA 249,984 8,073 5,681
2016-10-11 20 OTTAWA 249,984 7,997 5,652
2016-10-11 21 OTTAWA 249,984 7,931 5,357
2016-10-12 22 OTTAWA 249,984 7,685 5,360
2016-10-13 23 OTTAWA 249,984 7,584 5,556
2016-10-14 24 OTTAWA 249,984 7,700 5,765
2016-10-15 25 OTTAWA 249,984 7,716 6,480
2016-10-15 26 OTTAWA 249,984 7,511 5,428
2016-10-16 27 OTTAWA 249,984 7,400 5,468
2016-10-17 28 OTTAWA 249,984 7,657 6,008
2016-10-18 29 OTTAWA 249,984 7,698 5,802
2016-10-20 30 OTTAWA 249,984 7,239 5,367
2016-10-20 31 OTTAWA 249,984 7,195 5,427
2016-10-22 32 OTTAWA 249,984 7,142 5,850
2016-10-22 33 OTTAWA 249,984 6,825 5,939
2016-10-23 34 OTTAWA 249,984 7,259 5,406
2016-10-24 35 OTTAWA 249,984 7,405 5,803
2016-10-24 36 OTTAWA 249,984 6,916 5,414
2016-10-25 37 OTTAWA 249,984 6,703 5,251
2016-10-25 38 OTTAWA 249,984 6,833 5,868
2016-10-26 39 OTTAWA 249,984 6,578 4,732
2016-10-26 40 OTTAWA 249,984 6,285 5,031
2016-10-27 41 OTTAWA 249,984 6,438 5,641

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2016 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2017 SENECA RESOURCES CO LLC 1,115,732.35 322 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 803,908.72 363 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 562,649.66 357 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 SENECA RESOURCES CO LLC Drill Cuttings 1,182.07 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Synthetic Liner Materials 1.43 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 58.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW005
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 81.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016 SENECA RESOURCES CO LLC Servicing Fluid 119.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SENECA RESOURCES CO LLC Drill Cuttings 1.40 Tons LANDFILL 100361
2016 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 35.10 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2016 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 222.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 10.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 SENECA RESOURCES CO LLC Produced Fluid 68,481.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Synthetic Liner Materials 4.81 Tons LANDFILL 100361
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 927.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 SENECA RESOURCES CO LLC Produced Fluid 68.75 Bbl REUSE (AT WELL PAD)
2017 SENECA RESOURCES CO LLC Unused Fracturing Fluid Waste 12.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017 SENECA RESOURCES CO LLC Produced Fluid 6.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Produced Fluid 515.00 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 31,269.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 16.25 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 1,338.26 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 161.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003
2018 SENECA RESOURCES CO LLC Produced Fluid 43.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 3.06 Tons LANDFILL 100361
2019 SENECA RESOURCES CO LLC Produced Fluid 14,440.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 12.50 Bbl INJECTION DISPOSAL WELL 34-155-23795
2019 SENECA RESOURCES CO LLC Produced Fluid 26.88 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 903.51 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 2,664.38 Bbl INJECTION DISPOSAL WELL PAS2D025BELK
2019 SENECA RESOURCES CO LLC Produced Fluid 220.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 9.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Produced Fluid 13.75 Bbl INJECTION DISPOSAL WELL 34-133-20525
2019 SENECA RESOURCES CO LLC Produced Fluid 71.25 Bbl REUSE (AT WELL PAD)
2019 SENECA RESOURCES CO LLC Produced Fluid 53.75 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2406368 Primary Facility 2015-09-04 Routine/Complete Inspection No Violations Noted
2410386 Primary Facility 2015-09-17 Drilling/Alteration No Violations Noted
2414187 Primary Facility 2015-10-09 Drilling/Alteration No Violations Noted
2414188 Primary Facility 2015-10-06 Drilling/Alteration No Violations Noted
2414189 Primary Facility 2015-09-29 Drilling/Alteration No Violations Noted
2414193 Primary Facility 2015-10-08 Drilling/Alteration No Violations Noted
2443513 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted
2518760 Primary Facility 2016-08-24 Drilling/Alteration No Violations Noted
2526243 Primary Facility 2016-09-28 Drilling/Alteration No Violations Noted
2545828 Primary Facility 2016-12-20 Administrative/File Review No Violations Noted
2561333 Primary Facility 2017-02-10 Routine/Complete Inspection No Violations Noted Drilled and stimulated Marcellus Shale well. There are numerous fluid tanks on site; none appeared to be leaking and all were within properly sized diking. This site was stable and snow covered at the time of this inspection. The site ID sign and inspection log were at the entrance to the site.
2619945 Primary Facility 2017-07-28 Routine/Complete Inspection No Violations Noted This well pad has completed wells on it. The operator is working in the area of the stock tanks on the north side of the location. Vegetation around the site is in good shape. No spills or leaks are noted.
2771774 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted This is a Marcellus shale well pad with 8 producing wells on it. The wells are tagged. There is a tank site within steel containment. No spills or leaks are noted. This site is stable and vegetated. The well site ID sign and paperwork are available at the entrance to the site.
2847395 Primary Facility 2019-03-04 Drilling/Alteration No Violations Noted This well has 50' of 20" pipe set as conductor. They got between 5 to 8 bbl of cement returns on each of 4 wells they spudded. These were drilled and cemented last week. There are now 12 wells on this pad.

For data sources see[9]

References