If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-083-55969 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.702083,"lon":-78.785544,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: McKean | |
Municipality: Wetmore Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: WARRANT 3122 | |
License Status: Active | |
Spud Date: 2013-06-05 | |
Permit Date: 2013-03-06 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.702083 | |
Longitude: -78.785544 |
Date | Event |
---|---|
2013-03-06 | New Permit Application |
2013-06-05 | Performed Spud Operation |
2013-06-10 | Drilling Completion |
2013-08-16 | Performed Stage 1 of Stimulation |
2013-08-16 | Performed Stage 2 of Stimulation |
2013-08-16 | Performed Stage 3 of Stimulation |
2013-08-16 | Performed Stage 4 of Stimulation |
2013-08-16 | Performed Stage 5 of Stimulation |
2013-08-16 | Performed Stage 6 of Stimulation |
2013-08-16 | Performed Stage 7 of Stimulation |
2013-08-16 | Performed Stage 8 of Stimulation |
2019-02-25 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-08-16 | 1 | Sand | 40,200 | 2,600 | 3,100 |
2013-08-16 | 2 | Sand | 40,200 | 3,500 | 1,400 |
2013-08-16 | 3 | Sand | 40,200 | 2,900 | 3,900 |
2013-08-16 | 4 | Sand | 40,200 | 3,100 | 2,300 |
2013-08-16 | 5 | Sand | 40,200 | 3,100 | 2,600 |
2013-08-16 | 6 | Sand | 40,200 | 3,100 | 3,300 |
2013-08-16 | 7 | Sand | 40,200 | 3,000 | 3,000 |
2013-08-16 | 8 | Sand | 40,200 | 3,100 | 2,800 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | 5,877.20 | 365 | 1043.60 | 365 | 321.93 | 365 |
2015 | CATALYST ENERGY INC | 1,140.11 | 365 | 124.94 | 365 | 44.62 | 365 |
2016 | CATALYST ENERGY INC | 171.57 | 335 | 22.79 | 335 | 5.56 | 335 |
2017 | CATALYST ENERGY INC | 914.00 | 365 | 202.63 | 365 | 47.51 | 365 |
2018 | CATALYST ENERGY INC | 1,532.71 | 365 | 132.63 | 365 | 54.98 | 365 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | Produced Fluid | 849.63 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 849.63 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 69.05 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2016 | CATALYST ENERGY INC | Produced Fluid | 26.86 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 273.33 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 334.21 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | CATALYST ENERGY INC | Produced Fluid | 218.29 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 72.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 115.82 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 14.29 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2174581 | Primary Facility | 2013-06-06 | Drilling/Alteration | No Violations Noted | |
2195582 | Primary Facility | 2013-08-14 | Drilling/Alteration | No Violations Noted | |
2197333 | Primary Facility | 2013-08-16 | Drilling/Alteration | No Violations Noted | |
2398010 | Primary Facility | 2015-07-31 | Site Restoration | No Violations Noted | |
2652690 | Primary Facility | 2017-10-26 | Routine/Complete Inspection | No Violations Noted | This is a producing combination well with an electric powered pumpjack attached. The valves on the 4" string and tubing are both opened. No spills or leaks are noted. This site is stable and vegetated. The well is tagged and the site ID sign is visible on the site. |
For data sources see[8]