If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-083-55968 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.701506,"lon":-78.784064,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: McKean | |
Municipality: Wetmore Township | |
Operator Name: CATALYST ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: WARRANT 3122 | |
License Status: Active | |
Spud Date: 2013-06-11 | |
Permit Date: 2013-03-07 | |
Well Type: OIL | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 41.701506 | |
Longitude: -78.784064 |
Date | Event |
---|---|
2013-03-07 | New Permit Application |
2013-06-10 | Performed Spud Operation |
2013-06-14 | Drilling Completion |
2013-08-09 | Performed Stage 1 of Stimulation |
2013-08-09 | Performed Stage 2 of Stimulation |
2013-08-09 | Performed Stage 3 of Stimulation |
2013-08-09 | Performed Stage 4 of Stimulation |
2013-08-09 | Performed Stage 5 of Stimulation |
2013-08-09 | Performed Stage 6 of Stimulation |
2013-08-09 | Performed Stage 7 of Stimulation |
2013-08-09 | Performed Stage 8 of Stimulation |
2019-02-25 | Newly Drilled |
For data sources see[4]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2013-08-09 | 1 | Sand | 40,200 | 2,200 | 2,400 |
2013-08-09 | 2 | Sand | 40,200 | 2,300 | 2,000 |
2013-08-09 | 3 | Sand | 40,200 | 2,300 | 3,200 |
2013-08-09 | 4 | Sand | 40,200 | 2,600 | 2,700 |
2013-08-09 | 5 | Sand | 40,200 | 2,650 | 3,650 |
2013-08-09 | 6 | Sand | 40,200 | 2,650 | 3,600 |
2013-08-09 | 7 | Sand | 40,200 | 2,900 | 3,200 |
2013-08-09 | 8 | Sand | 40,200 | 3,800 | 3,700 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | 5,877.20 | 365 | 1043.60 | 365 | 321.93 | 365 |
2015 | CATALYST ENERGY INC | 1,140.11 | 365 | 124.94 | 365 | 44.62 | 365 |
2016 | CATALYST ENERGY INC | 171.57 | 335 | 22.79 | 335 | 5.56 | 335 |
2017 | CATALYST ENERGY INC | 914.00 | 365 | 202.63 | 365 | 47.51 | 365 |
2018 | CATALYST ENERGY INC | 1,532.71 | 365 | 132.63 | 365 | 54.98 | 365 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2014 | CATALYST ENERGY INC | Produced Fluid | 849.63 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0102784 |
2014 | CATALYST ENERGY INC | Produced Fluid | 849.63 Bbl | CENT WASTE TRT FAC NPDES | PA0102784 |
2015 | CATALYST ENERGY INC | Produced Fluid | 69.05 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2016 | CATALYST ENERGY INC | Produced Fluid | 26.86 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 273.33 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2017 | CATALYST ENERGY INC | Produced Fluid | 334.21 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | CATALYST ENERGY INC | Produced Fluid | 217.29 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2018 | CATALYST ENERGY INC | Produced Fluid | 72.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | CATALYST ENERGY INC | Produced Fluid | 115.82 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0023213 |
2019 | CATALYST ENERGY INC | Produced Fluid | 14.29 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | BT-008 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2168907 | Primary Facility | 2013-05-23 | Routine/Complete Inspection | No Violations Noted | |
2174595 | Primary Facility | 2013-06-11 | Drilling/Alteration | No Violations Noted | |
2398009 | Primary Facility | 2015-07-31 | Routine/Complete Inspection | No Violations Noted |
For data sources see[8]