X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-21724

Well Details

Well ID: 37-081-21724
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: McNett Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID: 151161
Farm/Lease Name: WISSLER SOUTH UNIT 2H
License Status:
Spud Date:
Permit Date: 2018-02-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.553333
Longitude: -76.823819

For data sources see[1][2][3]

Well History

Date Event
2018-02-15 New Permit Application
2018-04-23 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-27 2018-09-10 8,571 17,287,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Chief Oil & Gas Carrier/Base Fluid Listed Below
Unislick CST-LA Chemplex, Solvay Group Friction Reducer Listed Below
BIOC11139A Nalco Champion Biocide Listed Below
Hydrochloric Acid PVS Acidizing Listed Below
Thiourea 62-56-6 1 0.00001000 2
Ethanol, 2,2',2"-nitrilotris-,
tris(dihydrogen phosphate) (ester), sodium salt
68171-29-9 30 0.00165 2776
Ethylene glycol 107-21-1 30 0.00165 2776
Oleic acid diethanolamide 93-83-4 2 0.00142 2385
Diethylene glycol mono-n-butyl ether 112-34-5 60 0.00007000 114
Acetophenone 98-86-2 1 0.00001000 2
Water 7732-18-5 40 0.0022 3701
Formaldehyde 50-00-0 1 0.00001000 2
Ethanol 64-17-5 5 0.00129 2168
Water 7732-18-5 80 0.02058 34688
Water 7732-18-5 50 0.03538 59618
Water 7732-18-5 100 85.603 144,264,000.0
Copolymer of 2-Propenamide 79-06-1 20 0.01415 23847
Hydrochloric acid 7647-01-0 15 0.01999 33696
Ethoxylated (C10-16) alcohols 68002-97-1 35 0.00004000 67
Distillate, petroleum, hydrotreated, light 64742-47-8 20 0.01415 23847
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00142 2385
Glutaraldehyde 111-30-8 5 0.00129 2168
Quaternary ammonium compound 68424-85-1 10 0.00257 4336
Water 7732-18-5 85 0.1133 190943
Crystallilne silica 14808-60-7 100 14.1616 23,866,200.0
Methanol 67-56-1 5 0.00001000 10
Unihib G GeoSafe Acid Inhibitor Listed Below
Sand Sargent/Unimin Proppant Listed Below
SCAL16484A Nalco Champion Scale Inhibitor Listed Below

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CHIEF OIL & GAS LLC 1,587,703.49 102 0.00 0 0.00 0
2019 CHIEF OIL & GAS LLC 2,967,704.35 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 CHIEF OIL & GAS LLC Produced Fluid 35,943.32 Bbl REUSE (AT WELL PAD)
2018 CHIEF OIL & GAS LLC Produced Fluid 360.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHIEF OIL & GAS LLC Soil Contaminated by Oil & Gas Related Spills 1.71 Tons LANDFILL 301358
2018 CHIEF OIL & GAS LLC Drill Cuttings 1,306.53 Tons LANDFILL 301358
2018 CHIEF OIL & GAS LLC Synthetic Liner Materials 28.75 Tons LANDFILL 301358
2019 CHIEF OIL & GAS LLC Produced Fluid 60.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 CHIEF OIL & GAS LLC Synthetic Liner Materials 9.90 Tons LANDFILL 301358
2019 CHIEF OIL & GAS LLC Produced Fluid 17,927.27 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2676469 Primary Facility 2017-12-19 Routine/Complete Inspection No Violations Noted Routine inspection.

At the time of the inspection, one well was in production. The annular vent is plumbed to a poly tank. The production tank is in containment and is in good condition. PCSM was previously implemented and a 2-year extension was approved on 2/24/2016. The 2-year extension expires on 2/24/2018. I recommend evaluating the well site restoration plans. No violations noted.

2758848 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted Weather was 73° and cloudy at time of inspection. Met with Chief representative Floyd Roberts on location. Well was recently cemented to TD and shut in. Cudd was on location beginning to rig up on the well to complete Toe prep operations. Annular spaces were visible from surface and cement was visible. No violations were noted at time of inspection.
2784367 Primary Facility 2018-10-03 Routine/Complete Inspection No Violations Noted Site was in flowback phase when I arrived; 2 temporary separators and heaters were hooked up to the wells. The site had a large number of puddles, both on and off containment. These all showed low conductance (.18-.33 mS/ cm). Water had also built up under the liner, creating small spots where the liner was pushed up by the water. Berms had been removed from the sitewide containment, but no equipment remained on that liner. The containments for the Baker tank batteries on site appeared to be in good condition; however, on the outside of the berms for these containments, the liner was stretched such that it was not making contact with the ground for 1-3', increasing the possibility of a tear. The site has an existing pipeline, and the wells will be put directly to sales after flowback is complete.
2793156 Primary Facility 2018-10-23 Routine/Complete Inspection No Violations Noted Three wells in flowback. Site remains in flowback with production going to pipeline for sale. Mobile GPUs and sand separators situated near well heads. All separators within temporary containment. Many (20+) baker tanks within containment. No leaks. No conductivity above 300 uS/cm inside containments.

For data sources see[8]

References