{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.336478,"lon":-76.990054,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Lycoming | |
Municipality: Eldred Township | |
Operator Name: SENECA RESOURCES CO LLC | |
Well Pad ID: 153789 | |
Farm/Lease Name: RHONE GAMBLE 97H 52624 | |
License Status: | |
Spud Date: | |
Permit Date: 2017-06-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.336478 | |
Longitude: -76.990054 |
Date | Event |
---|---|
2017-06-05 | New Permit Application |
2017-08-25 | Performed Spud Operation |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-05-19 | 2018-06-03 | 9,019 | 9,228,910 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 7.5% Acid | Keane | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.0563809 | 49088.8 |
Water | 7732-18-5 | 92.5 | 0.695364 | 605429 | ||||
KAI-12 | Keane | Acid Inhibitor | methanol | 67-56-1 | 90 | 0.0017355 | 1511.04 | |
propan-2-ol | 67-63-0 | 5 | 0.00009642 | 83.947 | ||||
xylne | 1330-20-7 | 5 | 0.00009642 | 83.947 | ||||
prop-2-yn-1-0l | 107-19-7 | 5 | 0.00009642 | 83.947 | ||||
alcohols, c7-9-0so, c8-rich | 68526-83-0 | 5 | 0.00009642 | 83.947 | ||||
ethylbenzene | 100-41-4 | 1 | 0.00001928 | 16.789 | ||||
fatty imidazoline | 61790-69-0 | 5 | 0.00009642 | 83.947 | ||||
Sand (Proppant) (lbs) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 10.8292 | 9,428,600.0 | |
Water (Clean - Acid - Chems) | Seneca Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.2967 | 76,876,800.0 | |
MBC-516 | Keane | Biocide | ethanol | 64-17-5 | 2.8 | 0.000257836 | 224.489 | |
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000488968 | 425.727 | ||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 8 | 0.000733912 | 638.991 | ||||
gluteral | 111-30-8 | 26.7 | 0.00245865 | 2140.66 | ||||
KFR-25 | Keane | Friction Reducer | Water | 7732-18-5 | 60 | 0.00327023 | 2847.27 | |
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.00008176 | 71.182 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 1.5 | 0.00008176 | 71.182 | ||||
ammonium chloride | 12125-02-9 | 2 | 0.000109008 | 94.909 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.00109008 | 949.091 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Mineral oil/ light hydrotreated pet. distillate | 64742-47-8 | 20 | 0.0180508 | 15716.2 | |
Blend | Proprietary | 0.1 | 0 | 0 | ||||
prop-2-yn-1-0l | 107-19-7 | 5 | 0.00009642 | 83.947 | ||||
alcohols, c7-9-0so, c8-rich | 68526-83-0 | 5 | 0.00009642 | 83.947 | ||||
Citric acid | 77-92-9 | 40 | 0.000651057 | 566.852 | ||||
Water | 7732-18-5 | 92.5 | 0.695364 | 605429 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 1.5 | 0.00008176 | 71.182 | ||||
xylne | 1330-20-7 | 5 | 0.00009642 | 83.947 | ||||
ammonium chloride | 12125-02-9 | 2 | 0.000109008 | 94.909 | ||||
oleic acid diethanolamide | 93-83-4 | 2 | 0.00180508 | 1571.62 | ||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 8 | 0.000733912 | 638.991 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00004841 | 42.146 | ||||
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.00008176 | 71.182 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000488968 | 425.727 | ||||
ethanol | 64-17-5 | 2.8 | 0.000257836 | 224.489 | ||||
Ammonium Chloride | 12125-02-9 | 1 | 0.000902539 | 785.809 | ||||
cololymer of 2-propenamide | 69418-26-4 | 30 | 0.0270762 | 23574.3 | ||||
propan-2-ol | 67-63-0 | 5 | 0.00009642 | 83.947 | ||||
fatty imidazoline | 61790-69-0 | 5 | 0.00009642 | 83.947 | ||||
ethylbenzene | 100-41-4 | 1 | 0.00001928 | 16.789 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.00109008 | 949.091 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.00180508 | 1571.62 | ||||
KFR-41 | Keane | Friction Reducer | Distillates (petroleum), hydrotreated light | 64742-47-8 | 50 | 0.000484072 | 421.464 | |
Alcohols, C12-16, ethoxylated | 68551-12-2 | 5 | 0.00004841 | 42.146 | ||||
KFEAC-30 | Keane | Iron Control | Acetic acid | 64-19-7 | 60 | 0.000976586 | 850.279 | |
Citric acid | 77-92-9 | 40 | 0.000651057 | 566.852 | ||||
KFR-20 | Keane | Friction Reducer | oleic acid diethanolamide | 93-83-4 | 2 | 0.00180508 | 1571.62 | |
Mineral oil/ light hydrotreated pet. distillate | 64742-47-8 | 20 | 0.0180508 | 15716.2 | ||||
cololymer of 2-propenamide | 69418-26-4 | 30 | 0.0270762 | 23574.3 | ||||
Water | 7732-18-5 | 45 | 0.0406142 | 35361.4 | ||||
Ammonium Chloride | 12125-02-9 | 1 | 0.000902539 | 785.809 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.00180508 | 1571.62 | ||||
KSI-19 NW | Keane | Scale Inhibitor | Aqueous Solution | Proprietary | 100 | 0.0128918 | 11224.4 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | SENECA RESOURCES CO LLC | 1,725,805.14 | 128 | 0.00 | 0 | 0.00 | 0 |
2019 | SENECA RESOURCES CO LLC | 3,061,753.36 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[6]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 263.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2017 | SENECA RESOURCES CO LLC | Drill Cuttings | 1,776.43 Tons | LANDFILL | 301358 |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 9,136.21 Bbl | REUSE (AT WELL PAD) | |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 30.05 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 5,140.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 300.59 Bbl | REUSE (AT WELL PAD) | |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 767.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC003 |
2018 | SENECA RESOURCES CO LLC | Drill Cuttings | 98.75 Tons | LANDFILL | 301358 |
2018 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 122.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | SENECA RESOURCES CO LLC | Produced Fluid | 293.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2018 | SENECA RESOURCES CO LLC | Synthetic Liner Materials | 10.94 Tons | LANDFILL | 301358 |
2018 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 198.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2018 | SENECA RESOURCES CO LLC | Waste Water Treatment Sludge | 3.09 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 43.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | SENECA RESOURCES CO LLC | Other Oil & Gas Wastes | 20.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 698.36 Bbl | REUSE (AT WELL PAD) | |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 21.67 Bbl | STORAGE PENDING DISPOSAL OR REUSE | WMGR123NC038 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 256.67 Bbl | RESIDUAL WASTE TRANSFER FACILITY | WMGR123NC039 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 78.33 Bbl | INJECTION DISPOSAL WELL | 34-155-24079 |
2019 | SENECA RESOURCES CO LLC | Waste Water Treatment Sludge | 3.01 Tons | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW005 |
2019 | SENECA RESOURCES CO LLC | Synthetic Liner Materials | 6.73 Tons | LANDFILL | 301358 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 790.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2019 | SENECA RESOURCES CO LLC | Produced Fluid | 191.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC003 |
For data sources see[7]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2627630 | Primary Facility | 2017-08-03 | Routine/Complete Inspection | No Violations Noted | Routine inspection. At the time of the inspection the pad surface was almost complete and the cut/fill is nearly complete. The pad surface was soil cemented yesterday. Infiltration berm/basins are well vegetated and have contained sediment to some extent. The majority of the basins were filled with sediment and sediment laden water. Future rain events have a high likelihood to discharge sediment-laden water. I recommend spreading topsoil and seeding and mulching, or temporary stabilization ASAP. I recommend maintaining the basins and removing sediment when site conditions allow. Overall, I recommend additional stabilization throughout. In the future, I recommend silt sock above the infiltration structures as slope breakers whenever possible to minimize the erosion of fill into sedimentation/infiltration BMP's. |
2636011 | Primary Facility | 2017-09-14 | Routine/Complete Inspection | No Violations Noted | Spud inspection. Conductor only wells apparent beneath timber mats. |
2638580 | Primary Facility | 2017-09-21 | Drilling/Alteration | No Violations Noted | Arrived at 13:16. Weather: sunny, low humidity, light wind. Rhone Gamble 95 H: Patterson 339 onsite drilling intermediate well bore at 2714', with approximately 300' to go. Other wells still conductor only. Met with company man Danny Barrera, who came onsite on 9/20/17. Since this is the first well on location, they will be running triple combo and CBL. There were no violations identified during this inspection. |
2640466 | Primary Facility | 2017-09-27 | Drilling/Alteration | No Violations Noted | Arrived at 08: Weather: fog. Gamble R 95H is the well being drilled Patterson 339 on site. Met with company man Danny Barrera. Preparing for mechanical backoff. Intermediate casing shoe at 2981'. Top of fish at 2795', so agitator at top of BHA is 186' within casing. At approximately 3900', drilling on floc water, had started bringing back big cuttings (several inches along long axis). Managed to get through this fractured zone, but encountered another at 4400' (well bore at 4522') and got packed off. Jar work last night raised assembly by 77'. Future actions will be determined by success of mechanical backoff and further jar operations. The other wells on this location are conductor-only. There were no violations identified during this inspection. |
2645331 | Primary Facility | 2017-10-10 | Drilling/Alteration | No Violations Noted | Arrived at 12:15. Weather: sunny and humid. Met with company man Justin Green. Rig currently on 91H. At the time of my inspection rig was pulling BHA out of hole. Got to 3700' but deviated to south 19 degrees. Had been sliding since Friday but couldnt stop drift which was 12 degrees at 3000'. Plan to plug back tonight to 3000', dress cement, set IC, then kick off plug, and plan to be vertical through difficult section. 95H has been plugged. The other wells on this location are conductor-only. There were no violations identified during this inspection. |
2648183 | Primary Facility | 2017-10-13 | Routine/Complete Inspection | No Violations Noted | I met with Justin Greene when I arrived on-site. Patterson/UTI rig #339 on location, currently drilling the 91H well. Overall, containments were in good condition and site was clean and well maintained. I did note one of the chemical containments that was partially on and partially off of the rig mats, which caused water to pool in the lower section that was off the rig mats. I mentioned to Justin that this most likely did not meet the 110% volume requirement, and he told me that they were planning to move that chemical containment back up onto the rig mats as soon as they could move the 3 Baker tanks that were nearby. I also noted one liner seam at the berm which was torn; Justin stated that he would have it repaired. |
2649593 | Primary Facility | 2017-10-19 | Drilling/Alteration | No Violations Noted | Arrived at 11:00. Patterson 339 on 91H. Met with Danny Barrera, company man. At the time of my inspection they were fishing for a mud motor which broke off yesterday. At that time, from a depth of 6642', and drilling with 10.5 ppg SOBM, started coming out of the hole. Encountered some tight spots and decided to go back down. Started getting large cuttings back, so increased mud weight to 13 ppg. Got back to the bottom, put heavy weight on the bit and got nothing. Tripped out of hole and found that motor had broken off. There were no violations observed at the time of my inspection. 95H plugged, other wells are conductor only. Left at 12:22. |
2650950 | Primary Facility | 2017-10-23 | Drilling/Alteration | No Violations Noted | Arrived at 11:00. Patterson 339 on 91H. Met with Danny Barrera, company man. At the time of my inspection they were trying to get kicked off from plug set from 6611' to 6062'. The 95 H has been plugged. The other wells onsite are conductor only. There were no violations observed at the time of my inspection. Left at 12:20. |
2654663 | Primary Facility | 2017-10-31 | Drilling/Alteration | No Violations Noted | Arrived at 13:48. This well is conductor only. Weather: windy, cold, with clouds. Patterson 339 on 91H, doing a clean out run prior to running production casing. Shortened lateral due to pack off. Met with Danny Barrera, company man, who is leaving today. There were no violations observed at the time of my inspection. Left at 14:15 |
2659302 | Primary Facility | 2017-11-09 | Drilling/Alteration | No Violations Noted | Arrived at 14:00. Weather:rain. Met with Justin Green, company man. Haliburton onsite preparing for intermediate casing cement job on Gamble 92 H.
Other wells onsite: 91H, TD'ed - shortened lateral. 95H, plugged. Will be skid The following wells are conductor only: 96H, 97H, 98H, 99H, 100H. There were no violations observed at the time of my inspection. |
2664314 | Primary Facility | 2017-11-27 | Drilling/Alteration | No Violations Noted | Arrived at 13:00. Weather: sunny. Met with Danny Barrera, company man. Patterson 339 on the 92H doing clean-out run. Ran cedar shaving plug to estimate washout on production well bore. Estimate 15% washout.
Other wells onsite: 91H, TD'ed - shortened lateral. 95H, plugged. Will be skid The following wells are conductor only: 96H, 97H, 98H, 99H, 100H. There were no violations observed at the time of my inspection. |
2671736 | Primary Facility | 2017-12-14 | Drilling/Alteration | No Violations Noted | Arrived at 14:50. Patterson 339 drilling the 97H, at 6900'. Drilling with oil base and using managed pressure drilling to keep down hole pressures steady. Met with Danny Berrera (company man. No violations were observed during my inspection. |
2679210 | Primary Facility | 2018-01-03 | Drilling/Alteration | No Violations Noted | Arrived at 11:45. Met with Justin Greene (company man). Patterson 339 circulating bottoms up prior to cementing production casing. 5-1/2": 15,848'. Gas persisting with circulation. Couldn't use hanger for 5-1/2" casing so will wait 8 hours after prod cement job and then set slips. Plan to walk over to the 98H tomorrow morning. Followed up to check on cement job. Floats did not hold. Pressure after 8 hour cement wait. Set plugs at 7000' and 6700' on 1/5/18. No violations were observed during my inspection. |
2681955 | Primary Facility | 2018-01-11 | Drilling/Alteration | No Violations Noted | Arrived at 12:40. Met with Danny Berrera (company man). On the 98H. Patterson 339 at 1988'. 97H has retrievable plugs set. 91H was Previously TD'ed. 95H was plugged. No violations were observed during my inspection. |
2685408 | Primary Facility | 2018-01-23 | Drilling/Alteration | No Violations Noted | Arrived at 11:53. Met with Danny Berrera (company man). On the 98H. Patterson 339 at 8118'. Plan to use Baker rotary directional. Overall progress slow. 97H has retrievable plugs set. 91H was Previously TD'ed. 95H was plugged. Still need to remove well head and weld plate. No violations were observed during my inspection. |
2694805 | Primary Facility | 2018-02-14 | Drilling/Alteration | No Violations Noted | Arrived at 15:40. Weather: warm. Patterson 339 on 98H running casing at 8808'. Met with Danny Barrera, company man. Previously, casing got stuck at approximately 13,000' (TD: 16348'). 5-1/2" casing was previously pulled. Currently using a floatation sub at approx 6000' in an effort to lift the casing off the low-side and assist in getting to bottom. Discussed plate for 95H plug. There were no violations observed at the time of my inspection. |
2714594 | Primary Facility | 2018-03-29 | Routine/Complete Inspection | No Violations Noted | Routine Inspection; 3/29/2018.
At the time of the inspection, the Patterson 339 was onsite drilling the production hole on the Rhone Gamble 95H(081-21676). I met with the Company Man Justin Greene and Rob Boulware (Seneca). The site was very clean and containment was in good condition. I recommend addressing the slope failure on the west side of the pad when conditions are more favorable. No violations noted. |
2748783 | Primary Facility | 2018-07-03 | Routine/Complete Inspection | No Violations Noted | I met Guy Williams, Seneca company man, when I arrived. A workover rig was on location drilling out plugs on the 96H well. Guy accompanied me on my inspection. Sitewide containment was impossible to assess visually due to rig mats over it, but the berms were in good condition and well protected by the rig mats. Puddles were plentiful on the pad surface at the entrance side of the pad; conductance readings were consistently low in these puddles (.7-.9 mS/cm). Water in the Baker tank containments were somewhat higher (3.7-4.2 mS/cm). Guy informed me that vac trucks had been working in these containments since heavy rain had fallen the previous day. Site housekeeping was good. |
2765915 | Primary Facility | 2018-08-21 | Routine/Complete Inspection | No Violations Noted | Weather was 66° and raining at time of inspection. Met with Seneca representative Sam Neher on location. Welders were on location completing annulus vents and final surface production equipment welding at time of inspection. During pauses in the rain no bubbling was noted in the cellar. Will follow up on 8/22/18 to test annulus vents when they are opened and it is not raining. No violations noted at time of inspection. |
2765946 | Primary Facility | 2018-08-22 | Routine/Complete Inspection | No Violations Noted | Weather was 70° and sunny at time of inspection. Met with Seneca representative Glenn Heckman on location. A crew was on location completing final hookups on surface discharge equipment. Well had 3 annulis vents plumbed to surface at time of inspection. The 20x13 vent had 0% combustible gas detected at time of inspection. The 13x9 annulus vent had 0% combustible gas detected. The 9x5 annulus vent had 0% combustible gas detected. Well was closed in and was expected to go online on Friday 8/24/18. No violations noted at time of inspection. |
2783427 | Primary Facility | 2018-10-03 | Routine/Complete Inspection | No Violations Noted | Weather was 64° and cloudy at time of inspection. Met with Seneca representative Sam Neher on location. There were 3 annulus vents plumbed to surface at time of inspection. Vents are plumbed with ball valves and analog pressure gauges. The 20x13 vent and the 13x9 vent had 0% combustible gas detected. The 9x5 vent had 100% LEL and 100% methane detected at time of inspection. Well had digital pressure monitoring equipment attached above the swab valve and to a wing valve. The gauge above the swab valve read 1660 psi and the gauge attached to the wing valve read 1660 psi at time of inspection. This well does not have production tubing installed at this time and is being produced directly through the 5 1/2" production casing. No violations noted at time of inspection. |