37-081-21649

Well Details

Well ID: 37-081-21649
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Eldred Township
Operator Name: SENECA RESOURCES CO LLC
Well Pad ID: 153789
Farm/Lease Name: RHONE GAMBLE 92H 52598
License Status:
Spud Date:
Permit Date: 2016-07-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.336483
Longitude: -76.990161

For data sources see[1][2][3]

Well History

Date Event
2016-07-19 New Permit Application
2017-06-05 MOD
2017-08-25 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-04 2018-06-17 8,995 8,316,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KSI-19 NW Keane Scale Inhibitor Aqueous Solution Proprietary 100 0.0130738 10365.7
KFEAC-30 Keane Iron Control Acetic acid 64-19-7 60 0.00134561 1066.88
Citric acid 77-92-9 40 0.000897071 711.253
Other Chemical(s) Listed Above See Trade Name(s) List Ammonium Chloride 12125-02-9 1 0.00093245 739.304
alcohols, c7-9-0so, c8-rich 68526-83-0 5 0.000132847 105.33
oleic acid diethanolamide 93-83-4 2 0.0018649 1478.61
ethylbenzene 100-41-4 1 0.00002657 21.066
prop-2-yn-1-0l 107-19-7 5 0.000132847 105.33
Citric acid 77-92-9 40 0.000897071 711.253
Mineral oil/ light hydrotreated pet. distillate 64742-47-8 20 0.018649 14786.1
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.0018649 1478.61
ethanol 64-17-5 2.8 0.000250956 198.973
fatty imidazoline 61790-69-0 5 0.000132847 105.33
Blend Proprietary 0.1 0 0
Water 7732-18-5 92.5 0.958088 759631
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.00047592 377.338
Didecyl dimethyl ammonium chloride 7173-51-5 8 0.000714328 566.363
cololymer of 2-propenamide 69418-26-4 30 0.0279735 22179.1
propan-2-ol 67-63-0 5 0.000132847 105.33
xylne 1330-20-7 5 0.000132847 105.33
KFR-20 Keane Friction Reducer Alcohols, C12-16, ethoxylated 68551-12-2 2 0.0018649 1478.61
cololymer of 2-propenamide 69418-26-4 30 0.0279735 22179.1
oleic acid diethanolamide 93-83-4 2 0.0018649 1478.61
Ammonium Chloride 12125-02-9 1 0.00093245 739.304
Water 7732-18-5 45 0.0419603 33268.7
Mineral oil/ light hydrotreated pet. distillate 64742-47-8 20 0.018649 14786.1
KAI-12 Keane Acid Inhibitor ethylbenzene 100-41-4 1 0.00002657 21.066
fatty imidazoline 61790-69-0 5 0.000132847 105.33
alcohols, c7-9-0so, c8-rich 68526-83-0 5 0.000132847 105.33
propan-2-ol 67-63-0 5 0.000132847 105.33
methanol 67-56-1 90 0.00239125 1895.93
prop-2-yn-1-0l 107-19-7 5 0.000132847 105.33
xylne 1330-20-7 5 0.000132847 105.33
7.5% Acid Keane Acidizing Water 7732-18-5 92.5 0.958088 759631
Hydrochloric Acid 7647-01-0 7.5 0.0776828 61591.7
MBC-516 Keane Biocide ethanol 64-17-5 2.8 0.000250956 198.973
gluteral 111-30-8 26.7 0.00239304 1897.35
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.00047592 377.338
Didecyl dimethyl ammonium chloride 7173-51-5 8 0.000714328 566.363
Water (Clean - Acid - Chems) Seneca Resources Carrier/Base Fluid Water 7732-18-5 100 87.3753 69,276,500.0
Sand (Proppant) (lbs) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.4688 9,093,140.0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SENECA RESOURCES CO LLC 0.00 0 0.00 0 0.00 0
2018 SENECA RESOURCES CO LLC 1,680,093.83 130 0.00 0 0.00 0
2019 SENECA RESOURCES CO LLC 2,831,691.71 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 90.00 Bbl REUSE (AT WELL PAD)
2017 SENECA RESOURCES CO LLC Drill Cuttings 1,555.37 Tons LANDFILL 301358
2018 SENECA RESOURCES CO LLC Produced Fluid 2,422.88 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 30.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 SENECA RESOURCES CO LLC Produced Fluid 5,140.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 300.59 Bbl REUSE (AT WELL PAD)
2018 SENECA RESOURCES CO LLC Produced Fluid 767.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 122.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Produced Fluid 293.09 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018 SENECA RESOURCES CO LLC Synthetic Liner Materials 10.94 Tons LANDFILL 301358
2018 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 198.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 3.09 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 43.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Other Oil & Gas Wastes 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 570.03 Bbl REUSE (AT WELL PAD)
2019 SENECA RESOURCES CO LLC Produced Fluid 21.67 Bbl STORAGE PENDING DISPOSAL OR REUSE WMGR123NC038
2019 SENECA RESOURCES CO LLC Produced Fluid 256.67 Bbl RESIDUAL WASTE TRANSFER FACILITY WMGR123NC039
2019 SENECA RESOURCES CO LLC Produced Fluid 78.33 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SENECA RESOURCES CO LLC Waste Water Treatment Sludge 3.01 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019 SENECA RESOURCES CO LLC Synthetic Liner Materials 6.73 Tons LANDFILL 301358
2019 SENECA RESOURCES CO LLC Produced Fluid 790.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 SENECA RESOURCES CO LLC Produced Fluid 191.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC003

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2627627 Primary Facility 2017-08-03 Routine/Complete Inspection No Violations Noted Routine inspection. At the time of the inspection the pad surface was almost complete and the cut/fill is nearly complete. The pad surface was soil cemented yesterday. Infiltration berm/basins are well vegetated and have contained sediment to some extent. The majority of the basins were filled with sediment and sediment laden water. Future rain events have a high likelihood to discharge sediment-laden water. I recommend spreading topsoil and seeding and mulching, or temporary stabilization ASAP. I recommend maintaining the basins and removing sediment when site conditions allow. Overall, I recommend additional stabilization throughout. In the future, I recommend silt sock above the infiltration structures as slope breakers whenever possible to minimize the erosion of fill into sedimentation/infiltration BMP's.
2636010 Primary Facility 2017-09-14 Routine/Complete Inspection No Violations Noted Spud inspection. Conductor only wells apparent beneath timber mats.
2638577 Primary Facility 2017-09-21 Drilling/Alteration No Violations Noted Arrived at 13:16. Weather: sunny, low humidity, light wind. Rhone Gamble 95 H: Patterson 339 onsite drilling intermediate well bore at 2714', with approximately 300' to go. Other wells still conductor only. Met with company man Danny Barrera, who came onsite on 9/20/17. Since this is the first well on location, they will be running triple combo and CBL. There were no violations identified during this inspection.
2640465 Primary Facility 2017-09-27 Drilling/Alteration No Violations Noted Arrived at 08: Weather: fog. Gamble R 95H is the well being drilled Patterson 339 on site. Met with company man Danny Barrera. Preparing for mechanical backoff. Intermediate casing shoe at 2981'. Top of fish at 2795', so agitator at top of BHA is 186' within casing. At approximately 3900', drilling on floc water, had started bringing back big cuttings (several inches along long axis). Managed to get through this fractured zone, but encountered another at 4400' (well bore at 4522') and got packed off. Jar work last night raised assembly by 77'. Future actions will be determined by success of mechanical backoff and further jar operations. The other wells on this location are conductor-only. There were no violations identified during this inspection.
2645329 Primary Facility 2017-10-10 Drilling/Alteration No Violations Noted Arrived at 12:15. Weather: sunny and humid. Met with company man Justin Green. Rig currently on 91H. At the time of my inspection rig was pulling BHA out of hole. Got to 3700' but deviated to south 19 degrees. Had been sliding since Friday but couldnt stop drift which was 12 degrees at 3000'. Plan to plug back tonight to 3000', dress cement, set IC, then kick off plug, and plan to be vertical through difficult section. 95H has been plugged. The other wells on this location are conductor-only. There were no violations identified during this inspection.
2648181 Primary Facility 2017-10-13 Routine/Complete Inspection No Violations Noted I met with Justin Greene when I arrived on-site. Patterson/UTI rig #339 on location, currently drilling the 91H well. Overall, containments were in good condition and site was clean and well maintained. I did note one of the chemical containments that was partially on and partially off of the rig mats, which caused water to pool in the lower section that was off the rig mats. I mentioned to Justin that this most likely did not meet the 110% volume requirement, and he told me that they were planning to move that chemical containment back up onto the rig mats as soon as they could move the 3 Baker tanks that were nearby. I also noted one liner seam at the berm which was torn; Justin stated that he would have it repaired.
2649591 Primary Facility 2017-10-19 Drilling/Alteration No Violations Noted Arrived at 11:00. Patterson 339 on 91H. Met with Danny Barrera, company man. At the time of my inspection they were fishing for a mud motor which broke off yesterday. At that time, from a depth of 6642', and drilling with 10.5 ppg SOBM, started coming out of the hole. Encountered some tight spots and decided to go back down. Started getting large cuttings back, so increased mud weight to 13 ppg. Got back to the bottom, put heavy weight on the bit and got nothing. Tripped out of hole and found that motor had broken off. There were no violations observed at the time of my inspection. 95H plugged, other wells are conductor only. Left at 12:22.
2650949 Primary Facility 2017-10-23 Drilling/Alteration No Violations Noted Arrived at 11:00. Patterson 339 on 91H. Met with Danny Barrera, company man. At the time of my inspection they were trying to get kicked off from plug set from 6611' to 6062'. The 95 H has been plugged. The other wells onsite are conductor only. There were no violations observed at the time of my inspection. Left at 12:20.
2654652 Primary Facility 2017-10-31 Drilling/Alteration No Violations Noted Arrived at 13:48. Rhone Gamble 92 H is conductor only. Weather: windy, cold, with clouds. Patterson 339 on 91H, doing a clean out run prior to running production casing. Shortened lateral due to pack off. Met with Danny Barrera, company man, who is leaving today. There were no violations observed at the time of my inspection. Left at 14:15
2659291 Primary Facility 2017-11-09 Drilling/Alteration No Violations Noted Arrived at 14:00. Weather:rain. Met with Justin Green, company man. Haliburton onsite preparing for intermediate casing cement job on Gamble 92 H.

Other wells onsite: 91H, TD'ed - shortened lateral. 95H, plugged. Will be skid The following wells are conductor only: 96H, 97H, 98H, 99H, 100H. There were no violations observed at the time of my inspection.

2664308 Primary Facility 2017-11-27 Drilling/Alteration No Violations Noted Arrived at 13:00. Weather: sunny. Met with Danny Barrera, company man. Patterson 339 on the 92H doing clean-out run. Ran cedar shaving plug to estimate washout on production well bore. Estimate 15% washout.

Other wells onsite: 91H, TD'ed - shortened lateral. 95H, plugged. Will be skid The following wells are conductor only: 96H, 97H, 98H, 99H, 100H. There were no violations observed at the time of my inspection.

2671780 Primary Facility 2017-12-14 Routine/Complete Inspection No Violations Noted Arrived at 14:50. Patterson 339 drilling the 97H, at 6900'. Drilling with oil base and using managed pressure drilling to keep down hole pressures steady. Met with Danny Berrera (company man). 91H was sidetracked and TD'ed previously. 92H is conductor only. No violations were observed during my inspection.
2679240 Primary Facility 2018-01-03 Drilling/Alteration No Violations Noted Arrived at 11:45. Met with Justin Green (company man). On the 97H. Patterson 339 circulating bottoms up prior to cementing production casing. 5-1/2": 15,848'. Couldn't use hanger for 5-1/2" casing so will wait 8 hours after prod cement job and then set slips. Plan to walk over to the 98H tomorrow morning. 92 H was previosly TD'ed. No violations were observed during my inspection.
2681952 Primary Facility 2018-01-11 Drilling/Alteration No Violations Noted Arrived at 12:40. Met with Danny Berrera (company man). On the 98H. Patterson 339 at 1988'. 97H has retrievable plugs set. 91H was Previously TD'ed. 95H was plugged. No violations were observed during my inspection.
2685407 Primary Facility 2018-01-23 Drilling/Alteration No Violations Noted Arrived at 11:53. Met with Danny Berrera (company man). On the 98H. Patterson 339 at 8118'. Plan to use Baker rotary directional. Overall progress slow. 97H has retrievable plugs set. 91H was Previously TD'ed. 95H was plugged. Still need to remove well head and weld plate. No violations were observed during my inspection.
2694809 Primary Facility 2018-02-14 Drilling/Alteration No Violations Noted Arrived at 15:40. Weather: warm. Patterson 339 on 98H running casing at 8808'. Met with Danny Barrera, company man. Previously, casing got stuck at approximately 13,000' (TD: 16348'). 5-1/2" casing was previously pulled. Currently using a floatation sub at approx 6000' in an effort to lift the casing off the low-side and assist in getting to bottom. Discussed plate for 95H plug. There were no violations observed at the time of my inspection.
2714596 Primary Facility 2018-03-29 Routine/Complete Inspection No Violations Noted Routine Inspection; 3/29/2018.

At the time of the inspection, the Patterson 339 was onsite drilling the production hole on the Rhone Gamble 95H(081-21676). I met with the Company Man Justin Greene and Rob Boulware (Seneca). The site was very clean and containment was in good condition. I recommend addressing the slope failure on the west side of the pad when conditions are more favorable. No violations noted.

2748754 Primary Facility 2018-07-03 Routine/Complete Inspection No Violations Noted I met Guy Williams, Seneca company man, when I arrived. A workover rig was on location drilling out plugs on the 96H well. Guy accompanied me on my inspection. Sitewide containment was impossible to assess visually due to rig mats over it, but the berms were in good condition and well protected by the rig mats. Puddles were plentiful on the pad surface at the entrance side of the pad; conductance readings were consistently low in these puddles (.7-.9 mS/cm). Water in the Baker tank containments were somewhat higher (3.7-4.2 mS/cm). Guy informed me that vac trucks had been working in these containments since heavy rain had fallen the previous day. Site housekeeping was good.
2765919 Primary Facility 2018-08-21 Routine/Complete Inspection No Violations Noted Weather was 66° and raining at time of inspection. Met with Seneca representative Sam Neher on location. Welders were on location completing annulus vents and final surface production equipment welding at time of inspection. During pauses in the rain no bubbling was noted in the cellar. Will follow up on 8/22/18 to test annulus vents when they are opened and it is not raining. No violations noted at time of inspection.
2765959 Primary Facility 2018-08-22 Routine/Complete Inspection No Violations Noted Weather was 70° and sunny at time of inspection. Met with Seneca representative Glenn Heckman on location. A crew was on location completing final hookups on surface discharge equipment. Well had 3 annulis vents plumbed to surface at time of inspection. The 20x13 vent had 0% combustible gas detected at time of inspection. The 13x9 annulus vent had 3% methane and 60% LEL detected. The 9x5 annulus vent had 100% methane detected. Well was closed in and was expected to go online on Friday 8/24/18. No violations noted at time of inspection.
2783425 Primary Facility 2018-10-03 Routine/Complete Inspection No Violations Noted Weather was 64° and cloudy at time of inspection. Met with Seneca representative Sam Neher on location. There were 3 annulus vents plumbed to surface at time of inspection. Vents are plumbed with ball valves and analog pressure gauges. The 20x13 vent and the 13x9 vent had 0% combustible gas detected. The 9x5 vent had 100% LEL and 100% methane detected at time of inspection. Well had digital pressure monitoring equipment attached above the swab valve and to a wing valve. The gauge above the swab valve read 1585 psi and the gauge attached to the wing valve read 2425 psi at time of inspection. No violations noted at time of inspection.

For data sources see[8]