X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-36983

Well Details

Well ID: 37-063-36983
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Black Lick Township
Operator Name: FATE VENTURES LLC
Well Pad ID:
Farm/Lease Name: ADAMCHIK 7
License Status:
Spud Date: 2011-10-19
Permit Date: 2010-10-29
Well Type: COALBED METHANE
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.502711
Longitude: -79.201661

For data sources see[1][2][3]

Well History

Date Event
2010-10-29 New Permit Application
2011-10-17 Performed Spud Operation
2011-10-21 Drilling Completion
2011-10-31 Perforation
2012-03-21 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 KEYROCK ENERGY LLC 0.00 0 0.00 0 0.00 0
2011 KEYROCK ENERGY LLC 7.00 365 0.00 0 0.00 0
2012 KEYROCK ENERGY LLC 28,082.00 365 0.00 0 0.00 0
2013 KEYROCK ENERGY LLC 20,881.00 365 0.00 0 0.00 0
2014 KEYROCK ENERGY LLC 16,374.00 365 0.00 0 0.00 0
2015 KEYROCK ENERGY LLC 13,941.00 365 0.00 0 0.00 0
2016 KEYROCK ENERGY LLC 10,792.00 365 0.00 0 0.00 0
2018 KEYROCK ENERGY LLC 10,445.00 365 0.00 0 0.00 0
2019 FATE VENTURES LLC 9,225.00 360 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 KEYROCK ENERGY LLC Produced Fluid 620.98 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0219339

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1922522 Primary Facility 2010-10-18 Administrative/File Review In Compliance with Policy alternate method of casing review/approval
2013203 Primary Facility 2011-10-21 Drilling/Alteration No Violations Noted No E&S issues. condutor pipe set at 24 feet., 216 ' (9 5/8") and Pc completed well to 1250 ft. Superior performing wireline run.
2013734 Primary Facility 2011-10-26 Routine/Complete Inspection No Violations Noted At the time of inspection, well drilled not yet equipped for production. Spud recorded for 10/17/11. Well sign (permit issued 10/29/11) present, but unable to located ES plan at entrance-- recommend operator replace ES plan at access road entrance . One below grade pit located onsite, with adequate freeboard and security fence. Appears pit has been re-lined (over existing liner). Operator plans to encapsulate pit contents according to regulation as long as seasonal high groundwater table >20in. Two frac tanks located onsite, no IW issues noted. Bmp's installed and functioning according to plan, although dept. recommends additional rock be added to well pad in order to minimize the potential for accelerated erosion and sedimentation concerns.

For data sources see[7]

References