37-063-36476

Well Details

Well ID: 37-063-36476
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Black Lick Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: BOYD CLAWSON 3
License Status:
Spud Date: 2009-06-03
Permit Date: 2009-03-24
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.478635
Longitude: -79.285320

For data sources see[1][2][3]

Well History

Date Event
2009-03-24 New Permit Application
2009-06-02 Performed Spud Operation
2009-06-17 Drilling Completion
2009-06-17 Perforation
2009-10-08 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 PHILLIPS EXPLORATION INC 3058.00 365 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 6,594.00 358 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 9,147.00 363 0.00 0 0.00 0
2012 XTO ENERGY INC 3,423.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 15,021.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 19,743.00 365 49.65 365 0.00 0
2015 XTO ENERGY INC 14,208.00 348 0.00 0 0.00 0
2016 XTO ENERGY INC 10,556.00 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 7,552.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 8,666.00 365 0.00 0 0.00 0
2019 ALLIANCE PETRO CO LLC 6,482.00 334 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 XTO ENERGY INC Produced Fluid 19 Bbl CENT WASTE TRT FAC NPDES PA0095273
2013 XTO ENERGY INC Produced Fluid 19.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014 XTO ENERGY INC Produced Fluid 64.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014 XTO ENERGY INC Produced Fluid 64 Bbl CENT WASTE TRT FAC NPDES PA0095273
2014 XTO ENERGY INC Produced Fluid 75.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 XTO ENERGY INC Produced Fluid 75 Bbl CENT WASTE TRT FAC NPDES PA0095443
2015 XTO ENERGY INC Produced Fluid 56 Bbl CENT WASTE TRT FAC NPDES PA0095273
2015 XTO ENERGY INC Produced Fluid 56.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2017 ALLIANCE PETRO CO LLC Produced Fluid 12.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1804576 Primary Facility 2009-06-11 Routine/Complete Inspection No Violations Noted Site ID sign in place. E&S plan on site.
1816619 Primary Facility 2009-07-29 Routine/Complete Inspection Violation(s) Noted Well is in post drilling phase. There are two pits on site on of which is maintaining 2 foot of freeboard, the other which is not. The operator has failed to maintain 2 foot freeboard with the pit liner. The pit liner has not been embedded properly and has fallen into the base of the pit. Waste fluids are present as seen in the photos. The pit liner should be managed to prevent the pit contents from leaking from the pit and the 2 feet of lined freeboard shall be restored. No E&S issues on site.
1831421 Primary Facility 2009-09-18 Routine/Complete Inspection No Violations Noted drilling complete, equippied for production, drainage ditch needs work
1837151 Primary Facility 2009-10-21 Routine/Complete Inspection No Violations Noted At the time of inspection, the well was drilled with brine tank installed. The site was actively being restored. Pits were removed. Proper signage and E&S plan were onsite for review. The access road entrance was adequately rocked. No accelerated E&S issues were observed in relation to the well site or access road.
1907963 Primary Facility 2010-08-16 Site Restoration No Violations Noted At the time of inspection, well drilled and in production. According to records submitted to dept, well completed on 06/10/2009. Site adequately and uniformly restored with > 70% successful vegetative growth. No accelerated erosion or sedimentation issues were noted in relation to well site or access road. Access road stable. Brine tank appears sound. Noted bubbles near well annulus.
2016203 Primary Facility 2011-11-01 Routine/Complete Inspection No Violations Noted Production equipment consisted of separator (180 psi), 100 bbls brine tank (<20 bbls fluid), and totalize meter (16466 MCF). At the time of inspection, no E&S or IW issues at the site.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1816619 568098 07/29/2009 2009-07-29 78.56LINER - Improperly lined pit Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
568098 248500 NOV - Notice of Violation Comply/Closed 2009-08-20

For data sources see[7]