X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-33904

Well Details

Well ID: 37-063-33904
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Mahoning Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: BONACCI 1
License Status:
Spud Date:
Permit Date: 2004-08-05
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.889186
Longitude: -79.193912

For data sources see[1][2][3]

Well History

Date Event
2004-08-05 New Permit Application
2005-02-03 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2004 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2005 DANNIC ENERGY CORP 0.00 0 0.00 0 0.00 0
2006 EXCO RESOURCES PA INC 0.00 0 0.00 0 0.00 0
2007 DANNIC ENERGY CORP 4,683.00 304 0.00 0 0.00 0
2008 EXCO RESOURCES PA INC 4,466.60 366 0.00 0 0.00 0
2009 EXCO RESOURCES PA INC 3,508.00 365 0.00 0 0.00 0
2010 EXCO RESOURCES PA INC 3,337.00 365 0.00 0 0.00 0
2011 EXCO RESOURCES PA INC 1,998.00 365 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 2,111.00 306 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 2,082.00 365 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 2,028.00 305 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 261.00 31 0.00 0 0.00 0
2016 ALLIANCE PETRO CO LLC 1,214.00 183 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 1,467.00 365 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 2,587.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 EXCO RESOURCES PA INC Brine 140.00 Bbl Brine or Industrial Waste Treatment Plt PA0095443
2012 EXCO RESOURCES PA LLC Produced Fluid 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301357

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1364622 Primary Facility 2004-07-29 Routine/Complete Inspection No Violations Noted Inspection in response to PNDI hit. No apparent concerns if available E&S plan is implemented.
1426555 Primary Facility 2005-02-28 Drilling/Alteration No Violations Noted Drilling complete and equipment removed. Pit and E&S Ok.
2301651 Primary Facility 2014-09-03 Administrative/File Review In Compliance with Policy SPILL. A release of 36 bbl brine water was reported to the SWRO at 1347 by Operator representative Dan Chimino. Release discovered on 9/3 at 1220. No waterways reported to be affected.Upon receipt of spill report, Dept contacted Opr rep Dan Chimino at 1500 via phone. Mr. Chimino stated that early this morning, lightning struck the brine tank, igniting it and causing it to burn down to the base. The last well check was yesterday (9/2) in which there was 36 bbl brine in the tank at that time.Opr is currently removing any remaining fluids at this time and is in the process of contacting a contractor to pursue remediation efforts. Opr believes fluids may have traveled slightly downhill. No nearby waterways.Opr appears to be in compliance with current policy at this time. A FUI will be conducted in the future to assess any environmental impacts and/or issue any associated viols as necessary.
2302099 Primary Facility 2014-09-05 Incident- Response to Accident or Event Violation(s) Noted On-site inspt in response to admin inspt 2301651 for reportable release of 36 bbl brine from plastic tank.Release reported to be result of lightning strike igniting tank, causing tank to burn down to base.At time of inspt, area of previous tank location covered with plastic.Ground and remaining production equipment charred.Immediate perimeters of charred areas surrounded by discolored/stressed vegetation.Stressed vegetation does not appear to extend down nearby hillside, appears localized to well site.
2314757 Primary Facility 2014-10-21 Follow-up Inspection Outstanding Violations - No Viols Req'd FUI in response to viols issued under record 2302099 (enf ID 314995) for the 9/3/14 reportable release of 36 bbl brine water to ground.At time of inspection, contaminated soils excavated into single large pile, wrapped in liner awaiting proper disposal.All visibly impacted materials appear removed.Area of excavation surrounded by orange security fence.Site not yet temporarily stabilized.Per current regs, upon temporary cessation of an earth disturbance activity or any stage or phase of an activity where a cessation of earth disturbance activities will exceed 4 days, site shall be immediately seeded, mulched, or otherwise protected from accel E&S.Dept recommends Opr temp stabilize site in order to prevent any additional pollution events from occurring.
2361210 Primary Facility 2015-04-06 Follow-up Inspection Outstanding Violations - No Viols Req'd FUI in response to violations issued under inspection record 2302099 (enf ID 314995) for the 9/3/14 reportable release of 36 bbl brine water to ground.
2402396 Primary Facility 2015-08-26 Compliance Evaluation No Violations Noted On-site CEI in response to violations issued under inspection record 2302099 (enf ID 314995) for the 9/3/14 reportable release of 36 bbl brine water to ground.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2302099 704655 09/05/2014 2014-09-05 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
704655 314995 NOV - Notice of Violation Superseded 2017-12-08
704655 360242 CACP - Consent Assessment of Civil Penalty Comply/Closed 2017-12-08 2017-12-08 $34,500.00 $34,500.00

For data sources see[7]

References