X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-33264

Well Details

Well ID: 37-063-33264
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Brush Valley Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: JOHN S SIMPSON 1
License Status: Active
Spud Date: 2002-12-10
Permit Date: 2002-11-27
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.500373
Longitude: -79.094919

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2002 PHILLIPS EXPLORATION INC 0.00 0 0.00 0 0.00 0
2003 PHILLIPS EXPLORATION INC 0.00 0 0.00 0 0.00 0
2004 PHILLIPS EXPLORATION INC 10,948.00 365 0.00 0 0.00 0
2005 PHILLIPS EXPLORATION INC 5,744.00 353 0.00 0 0.00 0
2006 PHILLIPS EXPLORATION INC 4,404.00 365 0.00 0 0.00 0
2007 PHILLIPS EXPLORATION INC 3,149.00 365 0.00 0 0.00 0
2008 PHILLIPS EXPLORATION INC 3,093.00 366 0.00 0 0.00 0
2009 PHILLIPS EXPLORATION INC 2,216.00 365 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 2,015.00 362 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 2,030.00 364 0.00 0 0.00 0
2012 XTO ENERGY INC 1,886.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 1,567.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 1,175.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 1,167.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 852.00 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 827.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 745.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2003 PHILLIPS EXPLORATION INC Brine 0.00 Bbl Brine or Industrial Waste Treatment Plt
2005 PHILLIPS EXPLORATION INC Brine 820.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2006 PHILLIPS EXPLORATION INC Brine 675.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2008 PHILLIPS EXPLORATION INC Brine 240.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 1.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 38.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 33.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026310
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 1.00 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 243.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 29.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 10.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 PHILLIPS EXPLORATION INC Produced Fluid (in Barrels) 270.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 XTO ENERGY INC Produced Fluid (in Barrels) 330.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013 XTO ENERGY INC Produced Fluid (in Barrels) 114.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014 XTO ENERGY INC Produced Fluid (in Barrels) 181.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2017 ALLIANCE PETRO CO LLC Produced Fluid (in Barrels) RWC 802 130.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1193024 Primary Facility 2002-12-10 Drilling/Alteration No Violations Noted LK Drilling moving on location. Notif.,Pit and E&S OK.
1491349 Primary Facility 2005-11-01 Routine/Complete Inspection No Violations Noted Producing gas. Tag, tank, e&s ok.
1923096 Primary Facility 2010-10-27 Routine/Complete Inspection No Violations Noted According to records, operator completed the well on 12/17/02 to depth of 5129 ft. Well head consisted of 8¿ pipe to 4¿ to 2¿ production pipe with shut off valves. Production equipment consisted of separator (NA psi); and 100 bbl brine tank (< 25 bbl fluid). At the time of inspection, no IW and E&S issues at the site. No sign of gas leakage around pipe fitting at well head was noted.
1923638 Primary Facility 2010-08-12 Routine/Complete Inspection No Violations Noted TAG, Tank, E&S o.k.
1973713 Primary Facility 2011-05-18 Routine/Complete Inspection No Violations Noted Tag, tank, e&s ok.
2422635 Primary Facility 2015-11-02 Routine/Complete Inspection No Violations Noted Tag, tank, e&s ok.

For data sources see[6]

References