X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-32495

Well Details

Well ID: 37-063-32495
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: North Mahoning Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: MABEL WERTZ 4
License Status: ACTIVE
Spud Date: 2000-08-03
Permit Date: 2000-01-26
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.896644
Longitude: -79.065430

For data sources see[1][2][3]

Well History

Date Event
2000-01-26 New Permit Application
2000-08-03 Performed Spud Operation
2000-08-06 Drilling Completion
2000-08-17 Perforation
2001-03-15 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2000 PHILLIPS EXPLORATION INC 3439 48 0.00 0 0.00 0
2001 PHILLIPS EXPLORATION INC 4596 127 0.00 0 0.00 0
2002 PHILLIPS EXPLORATION INC 0.00 0 0.00 0 0.00 0
2003 PHILLIPS EXPLORATION INC 16600 165 0 165 0.00 0
2004 PHILLIPS EXPLORATION INC 27580 360 0.00 0 0.00 0
2005 PHILLIPS EXPLORATION INC 17815 363 0.00 0 0.00 0
2006 PHILLIPS EXPLORATION INC 14,121.00 363 0.00 0 0.00 0
2007 PHILLIPS EXPLORATION INC 10581.00 365 0.00 0 0.00 0
2008 PHILLIPS EXPLORATION INC 8730.00 346 0.00 0 0.00 0
2009 PHILLIPS EXPLORATION INC 7701.00 365 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 4,777.00 365 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 3,197.00 364 0.00 0 0.00 0
2012 XTO ENERGY INC 6,115.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 5,177.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 4,920.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 3,943.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 4,413.00 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 3,864.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 4,619.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2003 PHILLIPS EXPLORATION INC Brine 0.00 Bbl Brine or Industrial Waste Treatment Plt
2012 XTO ENERGY INC Produced Fluid 27.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2014 XTO ENERGY INC Produced Fluid 20.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2014 XTO ENERGY INC Produced Fluid 20 Bbl CENT WASTE TRT FAC NPDES PA0095443

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2095111 Primary Facility 2012-08-16 Complaint Inspection No Violations Noted At the time of this inspection, it appears that shared acess road/homeowner's driveway exhibits some erosion due to recent heavy rainfalls. Deparment did noted the installation of bmp's along acess road entrance to well sites, although appears numerous recent heavy rains have created some erosion concerns. Department spoke with Steve Smith on August 15 whom stated they were informed of the matter and were "actively" devising a plan to address the stormwater runoff concerns as well as aquiring the necessary resources to address the concerns. Department scheduled an on site meeting with operator on August 21. Based on today's observation it appears that farmer gated/pasturized former extrance(s) to this well and other surrounding wells, which lead the operator to utlize the "driveway" as a shared acess road. Inspection result is pending hence operator is aware of and actively addressing concerns, a follow up inspection will be conducted to insure that rutting is properly addressed and operator is maintaining rd 9/26/12 update: road repaired.
2095115 Primary Facility 2012-08-21 Routine/Partial Inspection In Compliance with Policy ADMIN- Onsite meeting to discuss ES complaint regarding shared access road and operators plans to address concerns. Steve Smith, Dan Rice, and Rick of XTO onsite. XTO currently has construction equipment (i.e.mini excavator )onsite at time of meeting. XTO, outlined plan to address erosion concerns. Rock will be utilized to fill ruts, a water bar and/or a drainage ditch(es) will be installed at top of access road near residence in order to divert runoff away from roadway. If operator agrees to follow plan as outlined, accelerated erosion and sedimentation concerns shall be addressed. Operator also agreed to photographically document the implementations made in the access road.

For data sources see[7]

References