X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-25346

Well Details

Well ID: 37-063-25346
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: East Wheatfield Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: JOSEPH D GEORGE ET UX ET AL 1
License Status: ACTIVE
Spud Date: 1980-02-11
Permit Date: 1980-02-05
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.464470
Longitude: -79.063143

For data sources see[1][2][3]

Well History

Date Event
1980-02-05 New Permit Application
1980-02-11 Performed Spud Operation
1980-02-16 Drilling Completion
1980-02-26 Perforation
1980-03-18 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 PHILLIPS EXPLORATION INC 3210.00 225 0.00 0 0.00 0
1993 PHILLIPS EXPLORATION INC 1559.00 168 0.00 0 0.00 0
1994 PHILLIPS EXPLORATION INC 1828.00 170 0.00 0 0.00 0
1995 PHILLIPS EXPLORATION INC 1000.00 57 0.00 0 0.00 0
1996 PHILLIPS EXPLORATION INC 3285 365 0.00 0 0.00 0
1997 PHILLIPS EXPLORATION INC 553 56 0.00 0 0.00 0
1998 PHILLIPS EXPLORATION INC 1653 333 0.00 0 0.00 0
1999 PHILLIPS EXPLORATION INC 1223 361 0.00 0 0.00 0
2000 PHILLIPS EXPLORATION INC 811 365 0.00 0 0.00 0
2001 PHILLIPS EXPLORATION INC 609 317 0.00 0 0.00 0
2002 PHILLIPS EXPLORATION INC 1121 363 0.00 0 0.00 0
2003 PHILLIPS EXPLORATION INC 700 365 0 365 0.00 0
2004 PHILLIPS EXPLORATION INC 855 366 0.00 0 0.00 0
2005 PHILLIPS EXPLORATION INC 537 365 0.00 0 0.00 0
2006 PHILLIPS EXPLORATION INC 480.00 365 0.00 0 0.00 0
2007 PHILLIPS EXPLORATION INC 817.00 365 0.00 0 0.00 0
2008 PHILLIPS EXPLORATION INC 587.00 366 0.00 0 0.00 0
2009 PHILLIPS EXPLORATION INC 568.00 365 0.00 0 0.00 0
2010 PHILLIPS EXPLORATION INC 406.00 365 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 466.00 364 0.00 0 0.00 0
2012 XTO ENERGY INC 584.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 549.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 499.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 619.00 365 0.00 0 0.00 0
2016 XTO ENERGY INC 578.00 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 394.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 451.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
1999 PHILLIPS EXPLORATION INC Brine 15.00 Bbl Brine or Industrial Waste Treatment Plt SEE END
2003 PHILLIPS EXPLORATION INC Brine 0.00 Bbl Brine or Industrial Waste Treatment Plt
2015 XTO ENERGY INC Produced Fluid 50 Bbl CENT WASTE TRT FAC NPDES PA0095273
2015 XTO ENERGY INC Produced Fluid 50.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1896762 Primary Facility 2010-06-30 Routine/Complete Inspection No Violations Noted According to records, operator completed the well on 2/16/80 to depth of 3729 ft. Well head consisted of 8¿ pipe to 4¿ to 2¿ production pipe with shut off valves. Production equipment consisted of separator (25 psi); and 100 bbl brine tank (with 40 bbl fluid). At the time of inspection, no IW and E&S issues at the site. No sign of gas leakage around pipe fitting at well head was noted.
2486906 Primary Facility 2016-05-23 Routine/Complete Inspection Violation(s) Noted At time of inspection Department observed water flowing across access road before reaching well site. Water is creating erosion gullies on access road. Culvert pipe under access road appears to be unmaintained.

No E&S issue observed on site. Well label present. Brine tank appears structurally sound. Well appears equipped for production. UPDATE 5-24-16: Department contacted Operator Rep Jason Canose by phone. Mr. Canose stated he would check out the access road and address any issues.

Violation being issued for failure to maintain E&S BMP's.

2492960 Primary Facility 2016-06-09 Compliance Evaluation No Violations Noted Admin inspection to inspection record #2486906 where violation was issued for failure to maintain E&S BMP's.

Department received NOV 15 day response from Operator. Response letter states that Operator is evaluating the current issues with the culvert pipe and will install any necessary erosion controls. Letter also states that E&S plans are being developed and once all documentation and permits are approved construction will begin to repair access road. A follow up inspection will be conducted at a later date. Operator is In Compliance with Policy at this time. UPDATE 9-7-16: Inspection result changed from ICP to NOVIO.

2539840 Primary Facility 2016-09-20 Follow-up Inspection No Violations Noted Follow up inspection to inspection record #2486906 where violation issued for failure to maintain E&S BMP's. Violation was closed: Operator In Compliance with Policy on 6-9-16.

At time of inspection it appears access road culvert pipe remains unmaintained. Both sides of access road becoming eroded and washed away preventing vehicle access to well site. Water level on west side of access road is low. Water is not running over access road at this time and it does not appear that water is running through culvert pipe. At this time it appears that excavation work to fix the access road has not begun. Department attempted to contact Operator Rep Jason Canose by phone from site. Department left a message requesting a call back. A follow up inspection will be conducted at a later date.

2540854 Primary Facility 2016-11-30 Administrative/File Review No Violations Noted Admin inspection to inspection record #2486906.

Department records indicate that a GP-11 submitted by Operator was issued on 10-18-16. Please notifiy Department at address below to provide tentative schedule of earth disturbance related to this permit. A follow up inspection will be conducted at a later date.

2549579 Primary Facility 2017-01-04 Routine/Partial Inspection No Violations Noted Routine partial inspection to inspection record #2486906.

E&S plan, GP-11, and Water ID and Delineation Report on site. At time of inspection it appears culvert pipe has been replaced. Disturbed area of access road rocked, no E&S issues observed. Temporary BMP's have been installed along access road and appear adequate. Area within LOD outlined in E&S plan appears temporarily stabilized. Department recommends Operator remove temporary BMP's once permanent stabilization has been achieved. A follow up inspection will be conducted at a later date.

2589490 Primary Facility 2017-05-03 Routine/Partial Inspection No Violations Noted RTPT inspection to inspection record #2486906.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2486906 759998 2016-05-23 2016-06-09 102.11(a)1 Environmental Health & Safety CEI inspection conducted on 6-9-16; inspection result of NOVIO due to Operator submitting a GP-11. eFACTS violation resolution reason: ICS

RTPT inspection conducted on 1-4-17; inspection result of NOVIO due to site inspection indicating culvert has been replaced. eFACTS violation resolution reason:

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
759998 343247 NOV - Notice of Violation 2016-06-09

For data sources see[7]

References