Well ID: 37-059-27673 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.827956,"lon":-80.15915,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Whiteley Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: | |
Farm/Lease Name: MAC OAK2H7 | |
License Status: | |
Spud Date: | |
Permit Date: 2018-04-05 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 39.827956 | |
Longitude: -80.159150 |
Date | Event |
---|---|
2018-04-05 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2712343 | Primary Facility | 2018-03-23 | Routine/Partial Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The land owner requested EQT add a culvert in an access road diversion channel and gravel in the adjacent area to allow better access to their property with farm equipment. Due to the addition of impervious area, it was recommended to EQT that they contact Department engineering staff. Redline approval was not granted.
During the inspection EQT informed the Department a slip had occurred upslope of the rain garden on the north side of the site. The slip material was contained in the rain garden. No slip material left the LOD. There were no violations observed at the time of inspection. |
For data sources see[5]