X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-27665

Well Details

Well ID: 37-059-27665
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Whiteley Township
Operator Name: GREYLOCK PROD LLC
Well Pad ID: 151427
Farm/Lease Name: BARNES A.J. MORRIS 10 MH
License Status:
Spud Date:
Permit Date: 2018-03-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.851369
Longitude: -80.113081

For data sources see[1][2][3]

Well History

Date Event
2018-03-20 New Permit Application
2018-07-24 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 GREYLOCK PROD LLC 1,295,153.00 133 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 GREYLOCK PROD LLC Produced Fluid 1,010.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 GREYLOCK PROD LLC Other Oil & Gas Wastes 192.86 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 GREYLOCK PROD LLC Drilling Fluid Waste 1,020.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018 GREYLOCK PROD LLC Produced Fluid 325.71 Bbl REUSE (AT WELL PAD)
2018 GREYLOCK PROD LLC Drill Cuttings 1,083.24 Tons LANDFILL 100277
2018 GREYLOCK PROD LLC Drilling Fluid Waste 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 GREYLOCK PROD LLC Drill Cuttings 139.66 Tons LANDFILL 06-08438
2018 GREYLOCK PROD LLC Other Oil & Gas Wastes 51.45 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 GREYLOCK PROD LLC Other Oil & Gas Wastes 50.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 GREYLOCK PROD LLC Other Oil & Gas Wastes 486.07 Bbl REUSE (AT WELL PAD)
2018 GREYLOCK PROD LLC Produced Fluid 242.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 GREYLOCK PROD LLC Synthetic Liner Materials 0.51 Tons LANDFILL 100172
2018 GREYLOCK PROD LLC Produced Fluid 71.42 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 GREYLOCK PROD LLC Other Oil & Gas Wastes 0.52 Tons LANDFILL 100172
2019 GREYLOCK PROD LLC Produced Fluid 17.15 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 GREYLOCK PROD LLC Produced Fluid 30,316.68 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 GREYLOCK PROD LLC Produced Fluid 1,559.72 Bbl REUSE (AT WELL PAD)
2019 GREYLOCK PROD LLC Produced Fluid 1.41 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 GREYLOCK PROD LLC Drilling Fluid Waste 138.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 GREYLOCK PROD LLC Other Oil & Gas Wastes 1.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 GREYLOCK PROD LLC Produced Fluid 3.34 Tons LANDFILL 06-08438
2019 GREYLOCK PROD LLC Other Oil & Gas Wastes 25.73 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019 GREYLOCK PROD LLC Other Oil & Gas Wastes 52.54 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 GREYLOCK PROD LLC Produced Fluid 1,544.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 GREYLOCK PROD LLC Produced Fluid 444.83 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 GREYLOCK PROD LLC Produced Fluid 89.94 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 GREYLOCK PROD LLC Produced Fluid 11,120.99 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 GREYLOCK PROD LLC Produced Fluid 552.64 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019 GREYLOCK PROD LLC Other Oil & Gas Wastes 427.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW031
2019 GREYLOCK PROD LLC Other Oil & Gas Wastes 423.81 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 GREYLOCK PROD LLC Produced Fluid 930.76 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019 GREYLOCK PROD LLC Synthetic Liner Materials 6.28 Tons LANDFILL 100172
2019 GREYLOCK PROD LLC Other Oil & Gas Wastes 2,002.82 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2760027 Primary Facility 2018-08-03 Drilling/Alteration No Violations Noted The well was spud on 7/25/18. The operator has set a 24" conductor pipe at 80'. The conductor pipe has been driven/drilled to depth.
2772268 Primary Facility 2018-09-06 Drilling/Alteration No Violations Noted Fountain/Quail rig #9 currently changing motor @ 380'. Operator reports no issues drilling. On site inspection shows no apparent violations. NOVIO
2817650 Primary Facility 2018-12-19 Drilling/Alteration No Violations Noted HG 513 TTR @ 6662' in 30deg kick to begin curve build at approx. 8000'. TD est @ 19,550'. Currently on 6 of 7 wells for this pad. Operator reports no issues drilling. On site inspection showed no apparent violations. NOVIO
2827722 Primary Facility 2019-01-09 Routine/Complete Inspection No Violations Noted On 01/09/19 at approximately 0835 hours I conducted a routine complete inspection of the site in response to a notification from Greylock that a Modular Above Ground Storage Structure was being constructed. As of the time of inspection the MASS had been constructed.

An area near the MASS showed signs of elevated conductivity compared to background (1.07mS vs 0.2mS). It is recommended the area be assessed for potential produced fluid impacts.

A water line between the MASS and well pad appeared to have been damaged by a vehicle (see photographs). It is recommended the line be pressure tested or repaired prior to use.

For data sources see[7]

References